Report (754) —s= _ VLMK Consulting Engineers PRINCIPALS 3933 SW KELLY AVENUE / PORTLAND, OREGON 97201 -4393 ALFRED H. VAN DOMELEN, P.E. JAMES E. KNAUF, P.E. -- — — (503) 222 - 4453 / FAX (503) 248 - 9263 / email: vlmk @vlmk.com GREGORY J. BLEFGEN, PE. HAVLIN G. KEMP, P.E. JOHN T. BROOKS (0 RE C P T VE D ' SSOCIATES � EVIN M. KAPLAN, P.E. �S AUG A U G 0 4 20 00 I BY: FIELD REPORT Date: July 26, 2000 Job No: 99277 Project: TCC Garage Permit No: Address: SW 69d' Ave. & Elmhurst Contractor: Baugh Construction Location: Tigard, Oregon Owner: Specht Development Weather: Mostly Sunny Temp/Time: 78° F at 2:00 P.M. Present at Site: Jim, Portland Rebar Marvin, Baugh Construction Trent Nagele, VLMK Engineers Reviewed reinforcing tendons and shoring for 3 P.T. slab four (2 tier, NW portion). In general, layout appears to be in good order. The following items were noted and discussed with Jim and Marvin for correction: 1. Wedge covers along the intermediate stress joint (grid 6.25) need to be correctly secured. 2. The tendon dead ends at G -9 are not chaired properly and need to be corrected. 3. Provide U -bars at the swept tendons located adjacent to the drain. 4. Provide (2) #4 bars at tendon anchoring — note particularly at grid C.2 -9. Where typical running bars are more than 1W from anchorage, provide extra #4 x regd. 5. Noticed several tom tendon casings. Make sure these areas are clean and properly greased. Wrap with tape. 6. The bottom reinforcing in front of the elevator is generally too high. Please adjust to provide 1" to 1'/2" max. clear. Note that several bars will be higher due to conflict with spandrel embeds. 7. Provide compressible foam or 3/8" gap at west side of elevator door header to allow slab movement. See sketches provided to Baugh. 8. The #4 chair bar doubles as typical mat reinforcing at some locations. However, along B -5, these bars do not always have correct lap. Provide #4x4' -0" bars at these locations to create proper bar lap splice. .*S ( so C O E u . `�'s1 ield Reports \TCC Garage 07- 26-00.Doc MEMBER • 9. Richmond anchors at the edge of the crane opening are to be straight (see detail 171S -5.2). Hooked anchors were installed and need to be corrected. Submitted By: C Trent C. Nagele, P.E. VLMK Engineers cc: Bob Burns, Specht Development Mike Gorman, LRS Architects Chris Hartson, Baugh Construction Bob Poskin, City of Tigard Claus Stasch, Carlson Testing K:\Field ReportsUCC Garage 07- 26- 00.Doc