Loading...
Report (746) Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing, Inc • Phone (503) 684 -3460 Phone (503) 589-1252 Phone (541) 330-9155 FAX (503) 684 -0954 FAX (503) 589 1309 FAX (541) 330 -9163 July 3, 2000 T0004403.CTI Permit No. BUP20000888 RECEIVED FIELD INSPECTION REPORT JUL 1 0 2000 DATES COVERED: June 30, 2000 BY- PROJECT: Tigard Corporate Center Parking Structure ADDRESS: 12125 SW 69th — Tigard, OR INSPECTOR: C. Stasch COP#485, WABO #STA7637001, OBOA #331 06- 30 -00: CTI representative was on site and noted a 5000 psi concrete mix 5031 B was placed in post tension slab pour #2-- between -3.5 -9/A-C, and D- G/6 :5 =9; as well as D18 and D19 and shear wall at 7 line. All - reinforcing was checked prior to placement of concrete and it conformed to approved drawing. All corrections were made per engineer field report dated 6/28/00. All concrete was pumped and vibrated. Six sets of (6) cylinders were cast — two field cure and (4) lab cure each. A total of (170) cubic yards were placed. Slumps were between 6'/2" to 5" — maximum allowed is 7 ". Our reports pertain to the materials inspected /tested only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. 'espectfully submitted, LSON T TING, INC. r CHIEF EXECUTIVE OFFICER Douglas W. Leach Chief Executive Officer CS /sab cc: Specht Development, Inc. — Bob Burns LRS Architects City of Tigard VLMK P. \word\reporTSlfie ld1T0004403. doc Carlson Testing, Construction Inspection & Related Tests ng, Inc. Geotechnical Consulting REPORT OF 6 X1 ' CONCRL f E TEST SPECIMENS JUL 1 0 2000 P.O. Box 23814 ASTM C172/C1231/C39/C31/C1064/C143 Tigard, Oregon 97281 Phone 503 684 -3460 Test Methods: BY: FAX # 684 -0954 Date Molded: 06/01 20 00 Job No. T0004403 Permit No: rsurlu' 0 - 00012 Client: SPECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE 12125 SW 69TH TIGARD OR Address: Contractor: X Sub Contractor: Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 2 1 t'' T185 Ticket No. Cast By: J . BRYANT Cu. Yds. 10 OF 45 Load Not SUNNY - - -- -- - - -68 - Weather: Temp. High: Temp. Low: WALLS LINES 3 AND 7 FROM C TO E. TEST AT WALL LINE Location of Placement: D FROM 7 TO 9 1 : 20 73 Test Time: Concrete Temp: 3500 28 4 1/2" I Strength Requirement: PSI @ days Slump Cement Type 3510E Mix NoJNo. Sacks Air Content Max. Aggregate Admix. Amount: Brand: _ Admix. Amount: Brand: Set Test@ Register Date Date Total A Unit Report Tested Area No. Days Number Rec'd Test Load PSI No. By 7 ' 2275 06/02 06/08 89,260 28.26 3160 AF 28 2275 06/02 06/29 115,870 28.27 4100 MS 28 2275 06/02 06/29 114,790 28.27 4060 MS 28 2275 06/02 06/29 112,450 28.27 3980 MS Remarks: i -, cc: LRS ARCHITECTS CITY OF TIGARD r VLMK < / ' Reviewed by: • . .. . . • Carlson Testing, Inc. Construction Inspection & Related Tests Geotechnical Consulting RFC V". REPORT 0F ' l ' CONCRETE TEST SPECIMENS P.O. Box 23814 ASTIR C172/C1231/C39/C31/C1064/C143 JUL 1 0 2000 Tigard, Oregon 97281 Test Methods: Phone (503) 684 -3460 FAX # 684 -0954 BY:------ Date Molded: 06/02 20 00 Job No. 70004403 Peiriiit v Client: SPECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE Address: 12125 SW 69TH TIGARD OR Contractor: - X Sub Contractor: Concrete supplier: ROSS ISLAND SAND & GRAVEL Truck No. 211 V185592 Ticket No. Cast By: S . HER I GSTAD Cu. Yds. 1 1 Load No OF 2 CLEAR 72 Weather. _ Temp. High: Temp. Low: COLUMNS 1 (A -F), 2 (D -G), 3 (F -3G) AND 1ST 10' OF THE ELEVATOR Location of Placement: SHAFT AT GRID LINE A9. l ::i7 75 Test Time: Concrete Temp: 5000 28 5 1/2" Strength Requirement: PSI @ days Slump Cement Type 5031B Mix NoJNo. Sacks Air Content Max. Aggregate Admix. Amount: Brand: _ Admix. Amount _ Brand: Set Test@ Register Date Date Total Area Unit Report Tested No. Days Number Rec'd Test Load PSI No. By 7 2328 06/03 06/09 160,070 28.25 5670 WR 28 2328 06/03 06/30 186,720 28.26 6610 MS 28 2328 06/03 06/30 179,230 28.26 6340 MS 28 2328 06/03 06/30 187,310 28.26 6630 MS Remarks: cc: LRS ARCHITECTS .� CITY OF TIGARD ``�� 7 - , VLMK / . L•.,: "),R.t.TORY M,ANA.GER Reviewed by: • Carlson Testing, Inc. Construction Inspection & Related Tests Geotechnical Consulting REPORT O F'X 1 CUNCRC_l E TEST SPECIMENS CF.T\TED I �F A P.O. Box 23814 ASTM C172/C1231/C39/C31/C1064/C143 Tigard, Oregon 97281 Test Methods: JUL 1 0 2000 1 Phone (503) 684 -3460 FAX # 684 -0954 Date Molded: 06/05 , 20 00 Job No. T0004403 BYPermit No: BUP2.000�- UU012 Client: SPECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE Address: 12125 SW 69TH TIGARD OR Contractor: X Sub Contractor: Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 212 T185703 Ticket No. Cast By: D. V I C K Cu. Yds. 11 OF 35 Load No' CLOUDY Weather. Temp. High: Temp. Low: BASEMENT WALL A LINE 5 TO 9, 9 LINE A TO D. TEST AT BASEMENT Location of Placement: WALL BETWEEN 4 AND 5 A LINE. 1:50 74 Test Time: Concrete Temp: 3500 28 4" 1 Strength Requirement: PSI @ days Slump Cement Type 3510B Mix NoJNo. Sacks Air Content Max. Aggregate Admix. Amount Brand: — Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested No. Days Number Rec'd Test Load PSI No. By 7 2376 06/06 06/12 97,540 28.26 3450 WR 28 2376 06/06 07/03 112,700 28.25 3990 MS 28 2376 06/06 07/03 109,870 28.25 3890 MS 28 2376 06/06 07/03 112,910 28.25 4000 MS Remarks: ` cc: LRS ARCHITECTS f ; CITY OF TIGARD VLMK ; LA.BCRA.TCRY MANAGER Reviewed by: Construction Inspection & Related Tests Carlson Testing, Inc. Geotechnical Consulting REPORT OF( , X 1 2 CONCRETE TEST SPECIMENS RECEIVED P.O. Box 23814 ASTM C172/C1231/C39/C31/C1064/C143 JUL 1 0 2000 Tigard, Oregon 97281 Test Methods: Phone (503) 684 -3460 FAX # 684 -0954 06/29 20 00 Job No. T0004403 — 0012 Date Molded: , Client: SPECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE Address: 12125 SW 69TH TIGARD OR Contractor: X Sub Contractor: Concrete supplier: ROSS ISLAND SAND & GRAVEL Truck No. 208 T187889 Ticket No. C . S TAS C H Cu. Yds. 11 OF 22 Load N Cast By, SUNNY 70 Weather. _ Temp. High: Temp. Low: POST TENSION SLAB POUR *1 BETWEEN 3.5 TO 4, A TO D LINE Location of Placement: 7 : 45 78 Test Time: Concrete Temp: 5000 28 6" I Strength Requirement: PSI 0 days Slump Cement Type 50318 3/4" Mix NoJNo. Sacks Air Content Max. Aggregate WATER REDUCER POLYHEED Admix. Amount: Brand: _ Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested No. Days Number Rec'd Test Load PSI No. By FCI 4 3109 06/30 07/03 117,550 28.25 4160 MS 28 3109 06/30 07/27 Remarks: cc : LRS ARCHITECTS / �" CITY OF TIGARD VLMK Reviewed by: 1 ^ " � ^ r --n r_ v MA N I ' , r_ v r ... .....�_... - -- .. _ .: .. ..tio a. Carlson Testing, Construction Inspection &Related Tests ng, Inc. Geotechnical Consulting REPORT OFf 12_ CONCRETE TEST SPECIMENS RFCF,TV D P.O. Box 23814 97281 ASTM C172/C1231/C39/C31/C1064/C143 JUL 1 0 2000 Tigard, Oregon Test Methods: Phone (503) 684 -346-346 0 FAX # 684 -0954 06/29 00 T0004403 BY: F-144-12-2-4(40 -000 Date Molded: , 2 0 Job No. t'ermit No: Client: SPECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE Address: 12125 SW 69TH TIGARD OR Contractor: X Sub Contractor: Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 207 T187913 Ticket No. Cast By: C. STASCH Cu. Yds. 11 OF 66 Load N SUNNY Weather. Temp. High: Temp. Low: POST TENSION SLAB POUR *1 BETWEEN 3.5 TO 4, A TO D LINE Location of Placement: 75 Test Time: Concrete Temp: 5000 28 5 1/4" I Strength Requirement: PSI @ days Slump Cement Type 50318 0 3/4" Mix NoJNo. Sacks Air Content Max. Aggregate Admix. Amount: Brand: _ Admix. Amount Brand: Set Test@ Register Date Date Total Area Unit Report Tested rea No. Days Number Rec'd Test Load PSI No. By IIFC 4 3107 06/30 07/03 118,070 28.25 4180 MS 28 3107 06/30 07/27 Remarks: cc: LRS ARCHITECTS CITY OF TIGARD • j' VLMK j , ' -- ^v v. NAGER Reviewed by: • Carlson Testing, Construction Inspection & Related Tests ng, Inc. Geotechnical Consulting RP, -RIVED REPORT OF f ,X 1 2 CONCRETE TEST SPECIMENS JUL 1 0 2 000 P.O. Box 23814 ASTM C172/C1231/C39/C31/C1064/C143 Tigard, Oregon 97281 Test Methods: Phone (503) 684 -3460 B'Y: FAX # 684 -0954 06/29 2 00 Job No. T0004403 Permit No: . 0 - 00012 Date Molded: . Client: SPECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE Address: 12125 SW 69TH TIGARD OR Contractor: X Sub Contractor. Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 208 T187919 Ticket No. Cast By C . STASCH Cu. Yds. 11 OF 117 Load No 11 SUNNY Weather. Temp. High: Temp. Low: POST TENSION SLAB POUR #1 BETWEEN 3.5 TO 4, A TO D LINE Location of Placement: 82 Test Time: Concrete Temp: 5000 28 4 3/4" I Strength Requirement: PSI ® days Slump Cement Type 5031B 3/4" Mix NoJNo. Sacks Air Content Max. Aggregate WATER REDUCER POLYHEED Admix. Amount: Brand _ Admix. Amount Brand: Set Test@ Register Date Date Total A Unit Report Tested No. Days Number Rec'd Test Load PSI No. By 3 FC 4 3105 06/30 07/03 116,780 28.26 4130 MS 28 3105 06/30 07/27 Remarks: / 7 ; / // cc: LRS ARCHITECTS CITY OF TIGARD `// VLMK ` / r ..gr, ?Y MANAGER Reviewed by: • Construction Inspection & Related Tests Carlson Testing, Inc. Geotechnical Consulting . JC ?T V il, , REPORT OF 1 . CONCRETE. TEST SPECIMENS JUL 1 0 2000 P.O. Box 23814 ASTM C172/C1231/C39/C31/C1064/C143 Tigard, Oregon 97281 Test Methods: Phone (503) 684 -3460 FAX # 684 -0954 Date Molded: 06/29 , 20 00 Job No. 1'0004403 Permit No: BU ' - '' -00012 Client: SPECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE Address: 12125 SW 69TH TIGARD OR Contractor: X Sub Contractor: T 187925 Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 207 Ticket No. Cast By: C C . STASCH • Cu. Yds. 11 OF 161 Load No SUNNY Weather: Temp. High: Temp. Low: POST TENSION SLAB POUR #1 BETWEEN 3.5 TO 4, A TO D LINE Location of Placement: 81 Test Time: Concrete Temp: 5000 28 4 1/2" I Strength Requirement: PSI @ days Slump Cement Type 5031B 3/4" Mix NoJNo. Sacks Air Content Max. Aggregate WATER REDUCER POLYHEED Admix. Amount: Brand: _ Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested No. Days Number Rec'd Test Load PSI No. By 4 FC 4 3103 06/30 07/03 123,780 28.25 4380 MS 28 3103 06/30 07/27 Remarks: - emarks: j �` /� cc: LRS ARCHITECTS CITY OF TIGARD - .'/ 7 ,- ;,, , ---- -- VLMK Reviewed by: Carlson Testing, Construction Inspection & Related Tests ng, Inc. Geotechnical Consulting ..... , 4 REPORT OFh 12 CONCRETE_ TEST SPECIMENS JUL 0 2000 P.O. Box 23814 ASTM C172/C1231/C39/C31/C1064/C14 ' Tigard, Oregon 97281 Test Methods: ' B� Phone (503) 684 - 3460 FAX # 684 - 0954 Date Molded: 06/30 20 00 Job No. T0004403 Permit No: :' 000 -00012 Client: SPECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE Address: 12125 SW 69TH TIGARD OR Contractor: X Sub Contractor: Concrete supplier: ROSS ISLAND SAND & GRAVEL Truck No. 208 T188086 Ticket No. Cast By: C . STASCH /T . KORNOWSK I Cu. Yds. 33 OF 270 Load N 3 SUNNY 67 Weather. Temp. High: Temp. Low: POST TENSION SLAB POUR #2 BETWEEN 3.5 TO 9, A TO C AND D TO G, Location of Placement: 6.5 TO 9 LINE. TEST AT E.5/11.5. 8:00 81 Test Time: Concrete Temp: 5000 28 6 1/2" I Strength Requirement: PSI 0 days Slump Cement Type 5031B 3/4" Mix No/No. Sacks Air Content Max. Aggregate Admix. Amount: Brand: _ Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested No. Days Number Rec'd Test Load PSI No. By I FC 3 3192 07/01 07/03 112,180 28.25 3970 MS 28 3192 07/01 07/28 Remarks: % / cc: LRS ARCHITECTS '� - CITY OF TIGARD / , /��` -- VLMK j / Reviewed by: Carlson Testing, onstruction Inspection & Related Tests ng, Inc. Inc . Geotechnical Consulting REPORT O Fi'X 1 CONCRETE TEST SPECIMEN. JUL 1 0 2000 P.O. Box 23814 ASTM C172/C1231/C39/C31/C1064/ '143 Tigard, Oregon 97281 Test Methods: o Phone (503) 684 -3460 FAX # 684 -0954 Date Molded: 06/30 , 20 00 Job No. T00044 UP2000-00012 Permit No: Client: SPECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE 12125 SW 69TH TIGARD OR Address: Contractor: X Sub Contractor. Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 209 T188096 Ticket No. Cast By: C. STASCH /T. KORNOWSKI Cu.Yds. 77 OF 270 Load N o SUNNY 64 Weather: Temp. High: Temp. Low: POST TENSION SLAB POUR *2 BETWEEN 3.5 10 9, A TO C AND D TO G, Location of Placement: 6.5 TO 9 LINE. TEST AT D/2.5. 8:35 81 Test Time: Concrete Temp: 5000 28 6 1/2" I Strength Requirement: PSI @ days Slump Cement Type 5031E 3/4" Mix NoJNo. Sacks Air Content Max. Aggregate Admix. Amount Brand: — Admix. Amount Brand: Set Test@ Register Date Date Total Area Unit Report Tested rea No. Days Number Rec'd Test Load PSI No. By IIFC 3 3191 07/01 07/03 115,210 28.25 4080 MS 28 3191 07/01 07/28 Remarks: / ,,,, cc : I_RS ARCHITECTS - / CITY OF TIGARD �`' % / , /// VLMK /, ''' / LA. .RATORY MANAGER Reviewed by: Carlson Testing Inc. �� ' ' � r,struct ion Ins pection & Related Tests g, 'UL 1 o z000 Geotechnical Consulting REPORT OF X . I 2 CONCRETE TEST SPECIMENS ]3'y; P.O. Box 23814 ASTM C172/C1231/C39/C31/C1064/C143 Tigard, Oregon 97281 Test Methods: Phone (503) 684 -3460 FAX # 684 -0954 Date Molded: 06/30 20 00 Job No. T0004403 BUP2000 -00012 Permit No: Client: SPECHT DEVELOPMENT INC -- BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE Address: 12125 SW 69TH TIGARD OR Contractor: X Sub Contractor: Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 215 1 5 T188109 Ticket No. Cast By: C . STASCH /T . KORNOWSK I Cu. Yds. 126 OF 270 Load No1 SUNNY 65 Weather: Temp. High: Temp. Low: POST TENSION SLAB POUR #2 BETWEEN 3.5 TO 9, A TO C AND D TO G, Location of Placement: 6.5 TO 9 LINE. TEST AT F /3. 9 :30 80 Test Time: Concrete Temp: 5000 28 6 1/2" I Strength Requirement: PSI @ days Slump Cement Type 50316 3/4" Mix No/No. Sacks Air Content Max. Aggregate Admix. Amount: Brand: — Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested No. Days Number Rec'd Test Load PSI No. By FC 3 3 3190 07/01 07/03 116,920 28.25 4140 MS 28 3190 07/01 07/28 Remarks: -e cc: LRS ARCHITECTS CITY OF TIGARD / `" fl , /� VLMK 7 7 L' F3 RA.TORY MANAGER Reviewed by: • (�`P:IVED Construction Inspection & Related Tests Carlson Testing, Inc. Geotechnical Consulting REPORT OF6 X12 CONCRETE TEST SPECIM;,t__ - P.O. Box 23814 ASTM C172/C1231/C39/C31/C1064/C143 Tigard, Oregon 97281 Test Methods: Phone (503) 684 -3460 FAX # 684 -0954 Date Molded: 06/30 20 00 Job No. T0004403 BUP2000 - 00012 Permit No: Client: SPECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE 12125 SW 69TH TIGARD OR Address: Contractor: X Sub Contractor: Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 20 7 T188120 Ticket No. Cast By C . STASCH /T . KORNOWSK I Cu. Yds. 170 OF 270 Load No 170 SUNNY 69 Weather: Temp. High: Temp. Low: POST TENSION SLAB POUR *2 BETWEEN 3.5 TO 9, A TO C AND D TO G Location of Placement: 6.5 TO 9 LINE. TEST AT E /4. 10:20 82 Test Time: Concrete Temp: 5000 28 5 3/4" I Strength Requirement: PSI @ days Slump Cement Type 5031E 3/4" Mix NoJNo. Sacks Air Content Max. Aggregate WATER REDUCER POLYHEED Admix. Amount: Brand: Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested No. Days Number Rec'd Test Load PSI No. By 4 FC 3 3189 07/01 07/03 106,810 78.25 3780 MS 28 3189 07/01 07/28 Remarks: / /.- cc : LRS ARCHITECTS ! �•f —� CITY OF TIGARD / VLMK ' LABORATORY MANAGER Reviewed by: • RFC.FWED truction Inspection & Related Tests Carlson Testing, Inc. Jul 1 o 2onn Geotechnical Consulting REPORT OF TEST 1 CONCRETE TEST SPECIMENS $; - P.O. Box 23814 ASTM C172/C1231/C39/C31/C1064/C143 Tigard, Oregon 97281 Test Methods: Phone (503) 684 -3460 FAX # 684 -0954 Date Molded: 06/30 20 00 Job No. T0004403 BUP2000 -00012 Permit No: Client: SF'ECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE Address: 12125 SW 69TH TIGARD OR Contractor: X Rub Contractor: Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 93 T188131 Ticket No. Cast By: C . STASCH /T . KORNOWSK I Cu. Yds. 21 OF 270 Load N o 0 SUNNY 73 Weather: Temp. High: Temp. Low: POST TENSION SLAB POUR #2 BETWEEN 3.5 'F0 9, A TO C AND D TO G Location of Placement: 6.5 TO 9 LINE. TEST AT D.5/5 11:25 84 Test Time: Concrete Temp: 5000 28 5 1/2" 1 Strength Requirement: PSI 4 days Slump Cement Type 5031B 3/4" Mix NoJNo. Sacks Air Content Max. Aggregate WATER REDUCER POLYHEED Admix. Amount: Brand _ Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested No. Days Number Rec'd Test Load PSI No. By 5 FC 3 3188 07/01 07/03 96,580 28.25 3420 MS 28 3188 07/01 07/28 Remarks: �, cc: LRS ARCHITECTS CITY OF TIGARD /,' '' VLMK 4 ` " Wes^ r / !_ A 7C'R STORY MANAGER Reviewed by: iRpc.P, Inspection & Related Tests Carlson Testing, Inc. Geotechnical Consulting JUL i 0 2000 REPORT OFt 'X 1 2 CONCRETE TEST SPECIM ter ►" P.O. Box 23814 ASTM C172/C1231/C39/C31/C1064/C143 Tigard, Oregon 97281 Test Methods: Phone (503) 6843460 FAX # 684 -0954 Date Molded: 06/30 , 20 00 Job No. T0004403 BUP2000 - 00012 Permit No: Client: SPECHT DEVELOPMENT INC •- BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE 12125 SW 69TH TIGARD OR Address: Contractor: X Sub Contractor: Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 216 T188145 Ticket No. Cast By: C . STASCH /T. KORNOWSKI Cu. Yds. 252 OF 270 Load N o 4 SUNNY 75 Weather. Temp. High: Temp. Low: POST TENSION SLAB POUR *2 BETWEEN 3.5 TO 9, A TO C AND D TO G Location of Placement: 6.5 TO 9 LINE COLUMN D /8, D/9 AND SHEAR WALL ON 7 LINE. TEST AT F /6. 12 :40 75 Test Time: Concrete Temp: 5000 28 5" I Strength Requirement: PSI @ days Slump Cement Type 5031B 3/4" Mix No/No. Sacks Air Content Max. Aggregate WATER REDUCER POLYHEED Admix. Amount: Brand: — Admix. Amount Brand: Set Test@ Register Date Date Total A Unit Report Tested rea No. Days Number Rec'd Test Load PSI No. By 6 FC 3 3187 07/01 07/03 98,390 28.25 3480 MS 28 3187 07/01 07/28 Remarks: cc: I._RS ARCHITECTS / f CITY OF TIGARD / / �/'� VLMK LABORATORY MANAGER Reviewed by: Carlson Testing, Construction Inspection & Related Tests ng, Inc. RVCF,TVED Geotechnical Consulting 6X12 CONCRETE JUL 1 U 2000 REPORT OF TEST SPECIMENS P.O. Box 23814 ASTM C172/C1231/C39/C31/C1064/C143 BY: Tigard, Oregon 97281 Test Methods: — Phone (503) 684 -3460 FAX # 684 -0954 Date Molded: 06/07 20 00 Job No. T0004403 BUP2000 - 00012 Permit No: Client: SPECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE 12125 SW 69TH TIGARD OR Address: Contractor: X Sub Contractor: Concrete supplier: ROSS ISLAND SAND & GRAVEL Truck No. 212 A185832 Ticket No. Cast By: B. PERRY Cu. Yds. 11 OF 20 Load No CLOUDY 65 Weather: Temp. High: Temp. Low: COLUMN FOOTINGS E/4 AND 5 Location of Placement: 11 : 00 73 Test Time: Concrete Temp: 3000 28 4 1/4" I & I1 Strength Requirement: PSI @ days Slump Cement Type 5031B Mix NoJNo. Sacks Air Content Max. Aggregate Admix. Amount: Brand: _ Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested No. Days Number Rec'd Test Load PSI No. By 7 2438 06/08 06/14 148,980 28.18 5290 WR 28 2438 06/08 07/05 181,410 28.26 6420 MS 28 2438 06/08 07/05 182,420 28.26 6460 MS 28 2438 06/08 07/05 182,180 28.26 6450 MS Remarks: cc: LRS ARCHITECTS CITY OF TIGARD . � ""� VLMK • LA 'ORA.TORY MANAGER Reviewed by: