Loading...
Report (738) Carlson Testing, Construction Inspection & Related Tests ng, Inc. Geotechnical Consulting ttiX 1 J CONCRETE k �` CT REPORT OF TEST SPECIMENS P.O. Box 23814 JU N' 2 0 2000 Tigard, Oregon 97281 Test Methods: AS TM i"I C 172/G 1231 /C39/C31 /C 1064 /C 1 4:T i - hone (503) 684 - 3460 ': _ — FAX # 684 -0954 i ��Y• Date Molded: 06/08 00 - f000440a-- - - -- . 0 - (1001 20 Job No. Permit o: Client: SPUCHT DEVELOPMENT INC -. BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE 12125 SW 69TH TIGARD OR Address: Contractor: X Sub Contractor: ROSS ISLAND SAND & GRAVEL 216 V186029 Concrete Supplier: Truck No. Ticket No. Cast By: D . V J G K Cu. Yds. 11 OF •; 3 Load No 1 CLOUDY 6 Weather: Temp. High: Temp. Low: WAI..LS 9 LINE D TO E, 1 LINE A TO F. TEST A f WALL FOUNDATION Location of Placement: BETWEEN 4 AND 5 A .LINE 2:20 71. Test Time: Concrete Temp: 3500 28 4 1/2" I Strength Requirement: PSI @ days Slump Cement Type 3510B Mix NoJNo. Sacks Air Content Max. Aggregate Admix. Amount Brand: _ Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested rea No. Days Number Recd Test Load PSI No. By II - /' 2461 06/09 06/15 92,800 28.27 3280 AF 28 2461 06/09 07/06 28 2461 06/09 07/06 HOLD 2461 06/09 - Remarks: '- - cc: LRS ARCHITECTS CITY OF TIGARD _ � %''' VI..MK r' Reviewed by: Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc • Phone (503) 684 -3460 Phone (503) 589 -1252 FAX (503) 589 -1309 Phone (541) 330 9155 FAX (503) 684 -0954 FAX (541) 330 -9163 ev,7 - -v 00/ Z_. ' � :ayr� TAT June 16, 2000 ED T0004403.CTI I JUN 2 0 20Q Permit No. BUP2000 -00012 BY: FIELD INSPECTION REPORT DATES COVERED: June 15, 2000 PROJECT: Tigard Corporate Center Parking Structure ADDRESS: 12125 SW 69th — Tigard, OR INSPECTOR: K. Thrall COP#657, WABO #THR545689, OBOA #347 06- 15 -00: CTI representative was onsite and inspected rebar in slab on grade at D -G/1 -9 first floor and end shear wall first floor to second floor at 3 /C -E for compliance to City approved plans. All grade, size, and placement met City approved plans. Observed placement and vibration of (175) cubic yards of Ross Island mix #3510AVR 3500 psi concrete in slab, shear wall not poured. Two sets of test cylinders were cast with slump of 5" and temperature of 77 °F. Our reports pertain to the materials inspected /tested only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, ARLSO:TESTING, I 4 . ' . Y . - r CHIEF EXECUTIVE OFFICER Douglas W. Leach Chief Executive Officer KT /Ijm cc: Specht Development, Inc. — Bob Bums LRS Architects City of Tigard VLMK