Report (734) RECTVE struction Inspection & Related Tests
Carlson Testing, Inc. JUN 0 9 7nnn Geotechnical Consulting
REPORT O F.0<i 2 CONCRETE TEST SPECIMEN$BY:
P.O. Box 23814
AS
C172/C17.31/C39/C31/C1064/C:143 Tigard, Oregon 97281
Test Methods: - . -Phone (503) 664 -3460
�-' " FAX # 684 -0954
Date Molded: 05/30 20 O() Job No. T0004403 Permit N 46UP2000 -000 122
Client: `:I'ECHT DEVELOPMENT INC - BOB BURNS
Project: TIGARD CORPORATE CENTER PARKING STRUCTURE
Address: 12125 SW 69TH TIGARD OR
Contractor: X Sub Contractor:
Concrete supplier: ROSS ISLAND SAND & GRAVEL Truck No. 211 Ticket No. T 18522 3
Cast By:
0 . S UM I NS K I Cu. Yds. 11 OF 43 Load NoI
OVERCAST 62
Weather: , Temp. High: Temp. Low:
BASEMENT WALL LINE 0 FROM 3 TO 7. TEST AT BASEMENT WALL LINE D
Location of Placement:
AND 0 AND 5
4' 70
Test Time: 1 1 �� Concrete Temp:
3500 28 3 1/2"
Strength Requirement: PSI @ days Slump Cement Type
350.106
Mix NoJNo. Sacks Air Content Max. Aggregate
Admix. Amount: Brand: Admix. Amount: Brand:
Set Test@ Register Date Date Total Area Unit Report Tested
rea
No. Days Number Rec'd Test Load PSI No. By
1 7 2179 05/31 06/06 87,780 28.23 3110 WR
28 2179 05/31 06/27
28 2179 05/31 06/27
HOLD 2179 05/31
1 1
Remarks: • /��
c: c:: I...RS ARCHITECTS � i
C1IY OF / Z,
VLMK � ��
Reviewed by: LABORATORY MAnlAr:FFt
Main Office Salem Office Bend Office
P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
Carlson Testing Inc • Phone (503) 684 -3460
FAX (503) 684 -0954 Phone (503) 589 -1252 Phone (541) 330 -9155
FAX (503) 589 1309 FAX (541) 330 -9163
June 7, 2000 RE {
T0004403.CTI ,JUN 0 9 2000
Permit No. BUP2000 -00012
' FIELD INSPECTION REPORT -BY
DATES COVERED: June 2 and 5, 2000
PROJECT: Tigard Corporate Center Parking Structure
ADDRESS: 12125 SW 69th — Tigard, OR
INSPECTOR: S. Stoner COP#611, WABO#ST0707291, OBOA #337
D. Vick COP#722, OBOA#424 /PG Sanetra COP#686, OBOA #311
06- 02 -00: CTI representative, S. Stoner was onsite and inspected rebar placement at the following locations.
1. 8" CMU walls at building A generator enclosure 4' to 12' (top of wall). Rebar was placed in conformance
with correspondence dated 05 -17 -00 from structural engineer. Clean outs were provided and all cells have
been cleaned of excessive mortar fins. Bond beam reinforcement below 4' was previously inspected by
CTI (per masonry sub - contractor).
2. 8" CMU at C/8 -9 top of footing to 32" bond beam. One bond beam was placed in first course off footing.
Verticals were not in place as of yet. Bond beam steel per specifications.
06- 05 -00: CTI representative, D. Vick, was onsite and inspected reinforcing and embeds in basement wall at
A/5 -9 and 9 /A -D. A 4000 psi concrete mix #3510B was placed by bucket and consolidated by vibrator.
Observed (35) cubic yards being placed. Cast one set of (4) 6x12 samples. Reinforcing, embeds, placement and
concrete were in accordance with approved plans and specifications.
06- 05 -00: CTI representative, PG Sanetra, was onsite and observed grout of CMU walls in lower level of
parking structure (2) storage rooms up 2'8" and generator enclosure full height. Grout was mechanically
vibrated. All reinforcing as per plans. No samples.
Our reports pertain to the materials inspected /tested only. Information contained herein is not to be
reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
spectfull - ubmitted,
• RLSO :1 ST I ,!,
CHIEF F .:
Douglas W. Leach
Chief Executive Officer
SGS /DV /PGS /Ijm
cc: Specht Development, Inc. — Bob Burns
LRS Architects
City of Tigard
VLMK