Loading...
Report (734) RECTVE struction Inspection & Related Tests Carlson Testing, Inc. JUN 0 9 7nnn Geotechnical Consulting REPORT O F.0<i 2 CONCRETE TEST SPECIMEN$BY: P.O. Box 23814 AS C172/C17.31/C39/C31/C1064/C:143 Tigard, Oregon 97281 Test Methods: - . -Phone (503) 664 -3460 �-' " FAX # 684 -0954 Date Molded: 05/30 20 O() Job No. T0004403 Permit N 46UP2000 -000 122 Client: `:I'ECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE Address: 12125 SW 69TH TIGARD OR Contractor: X Sub Contractor: Concrete supplier: ROSS ISLAND SAND & GRAVEL Truck No. 211 Ticket No. T 18522 3 Cast By: 0 . S UM I NS K I Cu. Yds. 11 OF 43 Load NoI OVERCAST 62 Weather: , Temp. High: Temp. Low: BASEMENT WALL LINE 0 FROM 3 TO 7. TEST AT BASEMENT WALL LINE D Location of Placement: AND 0 AND 5 4' 70 Test Time: 1 1 �� Concrete Temp: 3500 28 3 1/2" Strength Requirement: PSI @ days Slump Cement Type 350.106 Mix NoJNo. Sacks Air Content Max. Aggregate Admix. Amount: Brand: Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested rea No. Days Number Rec'd Test Load PSI No. By 1 7 2179 05/31 06/06 87,780 28.23 3110 WR 28 2179 05/31 06/27 28 2179 05/31 06/27 HOLD 2179 05/31 1 1 Remarks: • /�� c: c:: I...RS ARCHITECTS � i C1IY OF / Z, VLMK � �� Reviewed by: LABORATORY MAnlAr:FFt Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc • Phone (503) 684 -3460 FAX (503) 684 -0954 Phone (503) 589 -1252 Phone (541) 330 -9155 FAX (503) 589 1309 FAX (541) 330 -9163 June 7, 2000 RE { T0004403.CTI ,JUN 0 9 2000 Permit No. BUP2000 -00012 ' FIELD INSPECTION REPORT -BY DATES COVERED: June 2 and 5, 2000 PROJECT: Tigard Corporate Center Parking Structure ADDRESS: 12125 SW 69th — Tigard, OR INSPECTOR: S. Stoner COP#611, WABO#ST0707291, OBOA #337 D. Vick COP#722, OBOA#424 /PG Sanetra COP#686, OBOA #311 06- 02 -00: CTI representative, S. Stoner was onsite and inspected rebar placement at the following locations. 1. 8" CMU walls at building A generator enclosure 4' to 12' (top of wall). Rebar was placed in conformance with correspondence dated 05 -17 -00 from structural engineer. Clean outs were provided and all cells have been cleaned of excessive mortar fins. Bond beam reinforcement below 4' was previously inspected by CTI (per masonry sub - contractor). 2. 8" CMU at C/8 -9 top of footing to 32" bond beam. One bond beam was placed in first course off footing. Verticals were not in place as of yet. Bond beam steel per specifications. 06- 05 -00: CTI representative, D. Vick, was onsite and inspected reinforcing and embeds in basement wall at A/5 -9 and 9 /A -D. A 4000 psi concrete mix #3510B was placed by bucket and consolidated by vibrator. Observed (35) cubic yards being placed. Cast one set of (4) 6x12 samples. Reinforcing, embeds, placement and concrete were in accordance with approved plans and specifications. 06- 05 -00: CTI representative, PG Sanetra, was onsite and observed grout of CMU walls in lower level of parking structure (2) storage rooms up 2'8" and generator enclosure full height. Grout was mechanically vibrated. All reinforcing as per plans. No samples. Our reports pertain to the materials inspected /tested only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. spectfull - ubmitted, • RLSO :1 ST I ,!, CHIEF F .: Douglas W. Leach Chief Executive Officer SGS /DV /PGS /Ijm cc: Specht Development, Inc. — Bob Burns LRS Architects City of Tigard VLMK P : \WORD\REPORTS\FI E LD \T0004403. doc