Loading...
Report (750) • Construction Inspection & Related Tests Carlson Testing, Inc. Geotechnical Consulting FU X 1 REPORT OF' ('X 1 2 CONCRETE TEST SPECIMENS JUN 0 7 2000 P.O. Box 23814 ASIM C172/C1231/C39/C31/C1064/C)43 Tigard, Oregon 97281 Test Methods: . FAX Phone (503) # 68 684 4 -095 ' � 4 Date Molded: 05/26 20 00 Job No. 1 0004403 Permit o : t IU ecnr( )(.)41 2 Client: Si'L.CHT DEVELOPMENT INC -- BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE 12125 SW 69TH TIGARD OR Address: Contractor: x Sub Contractor: Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 215 T)85187 Ticket No. K. THRALL.. 8 OF 8 1 Cast By: Cu. Yds. Load No. CLOUDY 79 Weather: Temp. High: Temp. Low: COLUMN 3F , 6E , 7E , 8I:::F AND 9EF Location of Placement: 2 : 00 78 Test Time: Concrete Temp: 5000 28 4" 1 Strength Requirement: PSI @ days Slump Cement Type 503113 Mix NoJNo. Sacks Air Content Max. Aggregate Admix. Amount: Brand: — Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested rea No. Days Number Rec'd Test Load PSI No. By 7 2187 05/31 06/02 115,870 28.26 4100 AF 28 2187 05/31 06/23 28 2187 05/31 06/23 HOLD 2187 05/31 , Remarks: cc : I .RS ARCHITECTS �:!< , ', C1TY OF TIGARD �. • VLMK / • Reviewed by: • . Construction Inspection & Related Tests Carlson Testing, Inc. 6 _ mil ,uCir,u1m7 Geotechnical Consulting REPORT 0F 6XI 2 CONCISE IF.. TEST SPECIMENS JUN 0 7 200 P.O. Box 23814 A`•;TM B�' C. Tigard, Oregon 97281 Test Methods: : Phone (503) 684 -3460 FAX # 684 -0954 115/25 20 00 Job No. T0004403 Permit No: BIJP2000- 00012 Date Molded: Client: SI'F.c:I-1I DEVELOPMENT INC -- BOB BURNS Project: T I GARI) CORPORATE CENTER PARKING STRUCTURE 12125 SW 69TH TIGARD OR Address: Contractor: X Sub Contractor: Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 210 T18510 Ticket No. T . KOR NOWSK I 22 OF 44 Cast By: Cu. Yds. Load Nol OVERCAST 67 Weather: Temp. High: Temp. Low: FOOTINGS AT GRIDS E /6, 7, 8 AND 9, F/% ADN 8 AND F/3 Location of Placement: 3:01 7 8 Test Time: Concrete Temp: 3000 28 4 Strength Requirement: PSI ® days Slump Cement Type 30108 Mix NoJNo. Sacks Air Content Max. Aggregate Admix. Amount: Brand: _ Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested rea No. Days Number Rec'd Test Load PSI No. By I 'I. 7 2122 05/26 06/01 65,160 28.27 2300 WR, 28 2122 05/26 06/22 28 2122 05/26 06/22 HOLD 2122 05/26 Remarks: ` c <; : LRS ARCHITECTS � - -' �,"`�', ;, . VI.MK ` / / -- 1/ / Reviewed by: — v A ' '' c- r F1 . • .. • • • Carlson Testing, Inc. Construction Inspection & Related Tests Geotechnical Consulting 6:02 CONCRETE Er AT R TED 1 REPORT OF TEST SPECIMENS JUN 0 7 2000 I P.O. Box 23814 ASTM C172/C1231/C3 Tigard 9/C31/C1064/C143 , Oregon 97281 Test Methods: Phone (503) 684-3460 BY: FAX # 684-0954 Date Molded: 05/25 , 20 Job No. 00 T0004403 ------- illiel)001 '■! Permit No: Client: SVECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE 12125 SW 69TH TIGARD OR Address: Contractor: Sub Contractor: ROSS ISLAND SAND & GRAVEL 208 V185075 Concrete Supplier: Truck No. Ticket No. C.STASCH 11 Load No. Cast By: Cu. Yds. OVERCAST Weather: . Temp. High: Temp. Low: COLUMNS D/8, D/9, F/8, F/9, G/8, G/9, 1/5, F/6, F/2, G/6, G/5, Location of Placement: G/7, G/2, G/3, E/1, E/2, D/1, 1)/2, C/1, 8/1 AND A/1, 1:16 73 Test Time: Concrete Temp: 5000 28 5" 1 Strength Requirement: PSI @ days Slump Cement Type 50318 3/4" Mix No./No. Sacks — Air Content Max. Aggregate Admix. Amount: Brand: _ Admix. Amount: Brand: Set Test@ Register Date Date Total Unit Report Tested No. Days Number Recd Test Load Area PSI No. By 1 7 2126 05/26 06/01 147,080 28.25 5210 WR . . 28 2126 05/26 06/22 28 2126 05/26 06/22 1101_0 2126 05/26 Remarks: --<'` ,-e- ,--- cc: LRS ARCHITECTS ...- .. e ,- , ..._ C 11 Y OF TIGARD / d-' VLMK i ,- / .. / / , ID : Y M /.. r'.! it (7- '; Reviewed by: • . . . . . . Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc. Phone (503) 684 -3460 FAX (503) 684 -0954 Phone (503) 589 -1252 Phone (541) 330 -9155 FAX (503) 589 1309 FAX (541) 330 -9163 June 5, 2000 T0004403.CTI R CT 'TVED Permit No. BUP2000 -00012 JUN 0 7 2000 FIELD INSPECTION REPORT BY: DATES COVERED: June 2, 2000 PROJECT: Tigard Corporate Center Parking Structure ADDRESS: 12125 SW 69th — Tigard, OR INSPECTOR: S. Herigstad COP#745 06- 02 -00: CTI representative was onsite and observed the placement of (14) yards of Ross Island 5000 psi concrete mix #5031B for the columns at grid lines 2 /D -G, 1 /A -F, 3/F and 3/G (12) total and the first 10' of the elevator shaft. The concrete was placed by bucket and mechanically vibrated. One set of (4) 6x12 test cylinders was cast. The rebar was inspected by CTI prior to placing concrete. Our reports pertain to the materials inspected /tested only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, (e ' RLSON TESTING, IN _ g ) ;: D E EXECUTIVE OFFICER Chief Executive Officer SH /Ijm cc: Specht Development, Inc. — Bob Burns LRS Architects City of Tigard VLMK Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc • Phone (503) 684 -3460 FAX (503) 684 -0954 Phone (503) 589 -1252 Phone (541) 330 -9155 FAX (503) 589 -1309 FAX (541) 330 -9163 June 5, 2000 RE(`FT \7FD T0004403.CTI Permit No. BUP2000 -00012 JUN 0 7 2000 INSPECTION REPORT BY: DATES COVERED: May 31, 2000 PROJECT: Tigard Corporate Center Parking Structure ADDRESS: 12125 SW 69th — Tigard, OR INSPECTOR: S. Smith, COP #544 05- 31 -00: CTI visited the shop this date for inspection of two embeds. Visual exam performed of (72 pc) MK1 -H. Visual exam disclosed work to conform to AWS D1.1 structural steel code standard for weld quality and workmanship. Our reports pertain to the materials inspected /tested only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. C pectfully submitted, RLSO TESTING, I at4 c5c6441) CHIEF EXECUTIVE OFFICER Douglas W. Leach Chief Executive Officer SS:eam cc: Specht Development, Inc. — Bob Burns LRS Architects City of Tigard VLMK