Loading...
Report Y = VLMK Consulting Engineers PRINCIPALS 3933 SW KELLY AVENUE / PORTLAND, OREGON 97201 -4393 ALFRED H. VAN DOMELEN, P.E. JAMES E. KNAUF, P.E. (503) 222 / FAX (503) 248 / email: vlmk ®vl _ GREGORY J. BLEFGEN, P.E. HAVLIN G. KEMP P.E. � � JOHN T. BROOKS RECEIVED ASSOCIATES KEVIN M. KAPLAN, P.E. JUN u 5 2000 \ _ - -THOMAS CAMERO, P.E. t Date: June 1, 2000 Job No: 99277 2c.A.20.�03,¢ Project: TCC Garage Permit No: Address: . Contractor: Baugh Construction Location: Tigard, Oregon Owner: Specht Development Weather: Sunny Temp/Time: Approx. 75° at 2:30 p.m. Present at Site: Marvin Van Blericom, Baugh Construction Trent Nagele, VLMK Engineers A visit was made to the site at the request of Baugh Construction to review the column at grid B-4 which had been hit by construction equipment. The column sustained minor damage that amounted to some spalled concrete in the area of impact and a very small hairline crack which extended around the-column perimeter. From observation, it is my opinion that the column's structural integrity should not be adversely affected and that the damage sustained is essentially cosmetic. The small area of spelled concrete did not expose any reinforcing and can be patched. The hairline crack will become all but imperceptible with load on the column. Concrete was being placed for the basement portion of the wall along grid D between 7 and 8. Placement of reinforcing for walls along grid 9 between A and D and along grid A between 6 and 9 was in progress. Dowels along grid 9 into the PT deck were placed incorrectly and will need to be removed. Marvin and I reviewed the application of details 2, 3 and 4/S5.2 to allow for deck movement at the ends. If you have any questions or concerns regarding these items, please do not hesitate to contact me. Submitted By: Trent C. Nagele, PE VLMK Engineers cc: Bob Burns, Specht Development Mike Gorman, LRS Architects Chris Hartson, Baugh Construction Bob Poskin, City of Tigard ♦� I B C ^ o a u, M K: \Field Reports \TCC Garage 6 -1.Doc COUM 6 \� MEMBER • Construction Inspection & Related Tests Carlson Testing, Inc. Geotechnical Consulting REPORT OF f..X 1 CONCItF.. l F TEST SPECIMENS JUN 0 5 2000 P.O. Box 23814 ASTM 0177 _ /C12.31/C39/C31/C1064/C:143 Tigard, Oregon 97281 Test Methods: BY: Phone (503) 684 -3460 FAX # 684 -0954 05/22 20 00 Job No. T0004403 Permit No: BUP20(T5- .3001 ! Date Molded: Client: SI'FCHT DEVELOPMENT INC - BOB BURNS TIGARD CORPORATE CENTER PARKING STRUCTURE Project: 12.125 SW 69TH TIGARD OR Address: • Contractor: X Sub Contractor: ROSS ISLAND SAND & GRAVEL 96 184744 Concrete Supplier: Truck No. Ticket No. J.BLACK 9 OF 23 Cast By: Cu. Yds. Load No. SUNNY 71.i Weather: Temp. High: Temp. Low: COLUMN SPREAD FOOTINGS GRID C AT 4 ANt) 5 II AT 3. TFCS1 AT B AT Location of Placement: 3 2: O 77 Test Time: Concrete Temp: 3000 28 1 Strength Requirement: PSI @ days Slump — Cement Type 300013 Mix NoJNo. Sacks Air Content Max. Aggregate Admix. Amount: Brand: _ Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested No. Days Number Rec'd Test Load PSI No. By I 7 1990 05/23 05/29 107,410 28.26 3800 WR 28 1990 05/23 06/19 28 1990 05/23 06/19 HOLD 1990 05/23 Remarks: l r cc : I_RS ARCHITECTS CITY OF TIGARD ! VLMK - / Reviewed by: • Carlson Testing, Inc. Construction Inspection 4 Related Tests Geotechnical Consulting RECEIVED REPORT OF 1 CONCRETE TEST SPECIMENS JUN 0 5 2000 P.O. Box 23814 ASIM C172/C1231/C39/C3)/C1064/C143 Tigard, Oregon 97281 Test Methods: BY Phone (503) 684 -3460 FAX # 684 -0954 05/23 20 00 Job No. T0004403 Permit No: DUP2000 - 000) 2 Date Molded: Client: SI'E'cI•IT DEVELOPMENT INC - 1308 BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE 121.2.5 SW 69T1.1 TIGARD OR Address: Contractor: X Sub Contractor: ROSS ISLAND SAND & GRAVEL 212 V184851 Concrete Supplier: Truck No. Ticket No. J. BLACK 11 OF 16 1 Cast By: . Cu. Yds. Load No. SUNNY 70 . Weather: Temp. High: Temp. Low: COLUMNS 1ST I...EVEL GRID A AT 2 , 3 , 4 , 5, 6 , 7 AND 8 , GR ID 13. 5 Location of Placement: Al 9, GRID B AT 2, 3, 4, 5, 6, 7, 8 AND 9, GRID t. :. AT 2, 4, 5, 6, 8 AND 9. 1.: A!..i 76 Test Time: Concrete Temp: 5000 28 3 3/4" 1 Strength Requirement: PSI @ days Slump Cement Type 503113 (5K) Mix NoJNo. Sacks Air Content Max. Aggregate HRWRA Admix. Amount: Brand: _ _ Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested rea No. Days Number Rec'd Test Load PSI No. By I 7 2053 05/24 05/30 151,880 28.26 5370 AF 28 2053 05/24 06/20 28 2053 05/24 06/20 HOLD 2053 05/24 Remarks: cc : 1.. R S AR C H I P ECT S — CITY OF TIGARD VLMK , • L. Reviewed by: . .. .. - _ ......---. -----.._ s.... ...:.a.....• .._.......•.....�..•in.. Irnm $hic , ffIt A Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc • Phone (503) 684-3460 FAX (503) 684 -0954 Phone (503) 589 -1252 Phone (541) 330 -9155 FAX (503) 589 1309 FAX (541) 330 -9163 June 1, 2000 REC iF._TVE:I7 T0004403.CTI JUN 0 5 2000 Permit No. BUP2000 -00012 BY: FIELD INSPECTION REPORT DATES COVERED: May 31, 2000 PROJECT: Tigard Corporate Center Parking Structure ADDRESS: 12125 SW 69th, Tigard, OR INSPECTOR: J. Bryant COP#586, OBOA #137, WABO #BRY523915 05- 31 -00: Inspected rebar placed at boundary elements and walls, lines 3 and 7 between C and E. Wall line D from 7 to 9. All rebar was placed in compliance with approved plans. Our reports pertain to the materials inspected /tested only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, i 4. • RLSON TESTING, IN) N Douglas W. Leach Chief Executive Officer JB:tkf cc: Specht Development, Inc. — Bob Burns LRS Architects City of Tigard VLMK