Loading...
Report (732) Carlson Testing, Construction Inspection & Related Tests ng, Inc. Geotechnical Consultin3 KEG IT,TVED tti Oc x> - ci ° L REPORT OF1I X 12 CONCRETE TEST SPECIMENS MAY `4 j 2000 P.O. Box 23814 ASTM C 172/C 1231 /C39/C31 /C 10641 C 143 Tigard, Oregon 97281 Test Methods: Phone (503) 684 -3460 BY _ _ FAX # 684 -0954 Date Molded: 05/11 20 00 Job No. TCUU44U i Permit No: BUI'2000 Client: St'ECH F DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE Address: 12125 SW 69TH TIGARD OR - Contractor: X Sub Contractor: Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 207 Ticket No. V 1 83727 Cast By: C . STASCH Cu. Yds. 11 OF 55 Load No OVERCAST Weather: Temp. High: Temp. Low: EOOTINGS BETWEEN 6 TO 9 AND A TO D LINE Location of Placement: 10:30 59 Test Time: Concrete Temp: 3000 28 4 1/2" I Strength Requirement: PSI @ days Slump Cement Type 3000B 3/4" Mix NoJNo. Sacks Air Content Max. Aggregate Admix. Amount: Brand: — Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested rea No. Days Number Rec'd Test Load PSI No. By i 7 1663 05/12 05/18 92,000 28.25 3260 AF 28 1663 05/12 06/08 28 1663 05/12 06/08 HOLD 1663 05/12 Remarks: cc: LRS ARCHITECTS A7 C 1 TY OF TIGARD yi,;:z `�� /!� Reviewed by:' t_glit,Ki.T)RY MANAGER . . .. . .. _. _ .. _ _... -.: -.. .--....:....A 1,......;., ;....r..., tir. evil .rorl ovront in fotll withnut nrinr authorization from thls office. Carlson Testing, Construction Inspection & Related Tests ng, Inc. Geotechnical Consulting E;X1l_ CONCRETE RE' CF.TVED REPORT OF TEST SPECIMENS MAY 2 3 2000 P.O. Box 23814 Tigard, Oregon 97281 Test Methods: ASTM C172/C123.1/C39/C31/C1064/C143 Phone(503)684 - 3460 B Y FAX # 684 -0954 Date Molded: 05/11 20 00 ,lob No. T0004403 • Permit N o: - UUO I Client: SF'ECHT DEVELOPMENT INC - BOB BURNS Project: TIGARD CORPORATE CENTER PARKING STRUCTURE Address: 12125 SW 69TH TIGARD OR - Contractor: Sub Contractor: Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 208 V183747 Ticket No. Cast By: C . STASCH Cu. Yds. 11 OF 115 Load Not I OVERCAST Weather: Temp. High: Temp. Low: FOOTINGS BETWEEN 6 TO 9 AND A TO D LINE Location of Placement: 11 :33 63 Test Time: Concrete Temp: 3000 28 I Strength Requirement: PSI @ days Slump4.. Cement Type 3000B 3/4 Mix NoJNo. Sacks Air Content Max. Aggregate Admix. Amount: Brand: _ _ Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested rea No. Days Number Rec'd Test Load PSI No. By 1 1.. - 7 1662 05/12 05/18 88,790 28.25 3140 AF 28 1662 05/12 06/08 28 1662 05/12 06/08 HOLD 1662 05/12 Remarks: 11 cc: LRS ARCHITECTS �j� CITY OF TIGARD /'/.. i"" VI .MK / ' LABORATORY MANAGER Reviewed by: . . . _ -... .- •- - -.: -_ _ _• . _.• •. • • • • hn ....n•l . nn f in fhdl withnsa nrinr authorization from this office. Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc. Phone (503) 684-3460 Phone (503) 89 -130 Phone (541) 330 -9155 FAX (503) 684-0954 FAX (503) 589 1309 FAX (541) 330 -9163 May 18, 2000 RED''T'T \ T0004403.CTI MAY 2 a ?000 Permit No. BUP2000 -00012 INSPECTION REPORT BY: _ - - - -- DATES COVERED: May 16, 2000 PROJECT: Tigard Corporate Center Parking Structure ADDRESS: 12125 SW 69th, Tigard, OR INSPECTOR: C.M. Yuckert COP#416, WABO #YUC485919, OBOA #387 05- 16 -00: As requested by Fred of Baugh Construction, this CTI representative visited the job site to observe and document epoxying as follows: 1. Grid line 1/A -B.4 at footing, #5 rebar at 24" on center, 4" embedment into 5/8" diameter clean holes. 2. Grid line 1/B.4 and 2/B at footing, level 3, #6 rebar with 8" embedment into 7/8" diameter clean holes. 3. Grid line 1/B at footing, level 6, #7 rebar with 12" embedment into 1" diameter clean holes. Hilti Hy -150 epoxy was utilized per ICBO #E5193. Our reports pertain to the materials inspected /tested only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLS• TESTING, C . 19 = T. , J „,,...,... ”; - EF EXECUTIVE OFPCFP Douglas W. Leach Chief Executive Officer CMY /sab cc: Specht Development, Inc. — Bob Burns LRS Architects City of Tigard VLMK