May 17, 2000
T0004403.CTI (Duo k.2_ R�� {-, •�v��
Permit No. BUP2000-0AA�2
INSPECTION REPORT MAY 1 9 2000
BY: I
DATES COVERED: May 15, 2000
PROJECT: Tigard Corporate Center Parking Structure
ADDRESS: 12125 SW 69th, Tigard, OR
INSPECTOR: D. Vick COP#722, OBOA#424
05- 15 -00: Inspected reinforcing in #2 footing between B.5 & E.5/3 line tower crane footing,
spread footings 3B, 4B, 5F, 6F, and continuous footing D/3 -7, 9 /F -G, G/5 -9, and strap beams
5F -5G and 6F -6G. A 3000 psi concrete mix #3000B was placed by pump and concrete was
consolidated by vibrator. Observed placement of (247) cubic yards and cast three sets of (4)
6x12 samples. Reinforcing, placement, and concrete were in compliance with approved plans
and specifications.
Our reports pertain to the materials inspected /tested only. Information contained herein is not
to be reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this
office.
Respectfully submitted,
A• RLSON STING, IN it f
h
CHI!=F E)(ECUTIVE OFFICER
Douglas W. Leach
Chief Executive Officer
DV /Ijm
cc: Specht Development, Inc. — Bob Burns
LRS Architects
City of Tigard
VLMK