Loading...
Report (735) • Carlson Testing, Inc. Construction Inspection & Related Tests Geotechnical Consulting i T'C`.FTVED r,X i L . CONCRETE REPORT OF ' TEST SPECIMENS JUN 1 3 P.O. Box 23814 200 T i Tigard, Oregon 97281 Test Methods: A l "M C172/C1231/C39/C31/C1064/C14 i Phone (503) 684 - 3460 ' D FAX # 684 -0954 Date Molded: ( ' J( ' /U 1 , 20 0 Job No. T0004403 Permi o ()(�. • Client: :I'F.CH'1 DEVELOPMENT INC -- BOB BURNS Project: TIGARI) CORPORATE CENTER PARKING STRUCTURE Address: 1212.5 SW 69TH T.IGARI) OR Contractor: X Sub Contractor: Concrete Supplier: ROSS ISLAND SAND & GRAVEL. Truck No. 21 �'' 1 185 Ticket No. Cast By: 3 • R I: YA N I" Cu. Yds. 10 OI '+ `' Load No. SUNNY 68 Weather: Temp. High: Temp. Low: WALI..S LINES 3 AND 7 FROM C TO L. TEST" AT WALL LINt. Location of Placement: 1) [ROM 7 TO 9 1 : 20 13 Test Time: Concrete Temp: 3500 28 4 1/2" 1 Strength Requirement: PSI @ days Slump Cement Type 3 5100 Mix NoJNo. Sacks Air Content Max. Aggregate Admix. Amount: Brand: Admix. Amount: Brand: Set Test@ Register Date Date Total Area Unit Report Tested rea No. Days Number Rec'd Test Load PSI No. By 7 2275 06/02 06/08 89,260 28.26 3160 AF 28 2275 06/02 06/29 28 2275 06/02 06/29 HOLI) 2275 06/02 Remarks: / ,, c:c : I.RS ARCIl1 I'EC:TS .. ,,i C1IY Of TIGARD .,`:i VLMK Reviewed by: - ' ' r ' • • . - Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc • Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 9155 FAX (503) 684 -0954 g F � AX (503) 589-1309 FAX (541) 330 -9163 RECETVED June 9, 2000 JUN 1 3 T0004403.CTI 2000 Permit No. BUP2000 -00012 BY: FIELD INSPECTION REPORT DATES COVERED: June 7, 2000 PROJECT: Tigard Corporate Center Parking Structure ADDRESS: 12125 SW 69th — Tigard, OR INSPECTOR: B. Perry COP#741 06- 07 -00: CTI representative was on site and inspected the reinforcing steel for column footings Type-A at E/4 -5 and cast -in -place column B /4. Observed the placement of (20) cubic yards of Ross Island 5031B mix concrete placed by bucket in the column and by truck chute in the footings. Concrete was mechanically vibrated for consolidation. Cast (1) set of (4) cylinders and tested for slump and temperature. Above work conforms to the approved project documents. 06- 07 -00: CTI representative was on site and inspected the reinforcing steel for cast -in -place wall prior to form closure at 1 /A -F.4, A/1 -2, and A/3 -5. CTI representative will inspect for clearances prior to placement of concrete. Above noted work conforms to the approved project documents. Our reports pertain to the materials inspected /tested only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, ii) CARLSON TESTING, p. •-sutc -r.' r-rt--r) .In. �)PFICFP Douglas W. Leach Chief Executive Officer BP /sab cc: Specht Development, Inc. — Bob Burns LRS Architects City of Tigard VLMK