October 4, 2000 ASSOCIATES
KEVIN M. KAPLAN, P.F.
•
Darrel Watkins •
City of Tigard v )iO
13125 SW HaII Blvd. I
Tigard, OR 97223 -8199 ,
Re: Tigard Corporate Center — Building A
12123 SW 89 Tigard, OR
Permit No.: BUP1999 -ee Or'd a " -- � a-
Dear Mr. Watkins:
VLMK Consulting Engineers has performed Structural Observations on the above
noted project, as required by the 1998 Oregon Structural Specialty Code (OSSC),
Section 1702 as follows:
1. Observations of footing reinforcing steel,
2. Observation of concrete tilt-wall reinforcing steel.
3. Observation of roof and floor structure.
4, Observation of lateral load- resisting elements.
Observations were performed on the above noted elements and reports of
observations were submitted to the City of Tigard Building (Inspection) Department.
To the best of our knowledge, the work on this project is in conformance with the
approved plans, specifications and Engineers directives.
If you have any additional questions regarding Structural Observations on this project,
please do not hesitate to contact me at (503) 222 -4453.
Best Regards, l Q PROF"'
V K Consulting Engineers 8482 ♦
..- g A,
James E. Knauf, P. . / osava e
Principal
cc: Sec — Kldf K N P).
Specht Development, Inc. Bob Burns
Baugh Construction Company — John Lawrence ��e 4 10 _ Zee,/
LRS Architects
Carlson Testing
r
0 E JEK:jjs
c s
1 ...4&311 1 "' K:1LetterelTCC Bldg. A - 1O- 4.00.doc