Loading...
Report (617) _ VLMK Consulting Engineers PRINCIPALS -- _ - ^ 3933 SW KELLY AVENUE / PORTLAND, OREGON 97201 -4393 ALFRED H. VAN DOMELEN, P.E. - _ JAMES E. KNAUF, P.E. — (503) 222 - 4453 / FAX (503) 248 - 9263 / email: vlmk @vlmk.com GREGORY J. BLEFGEN, P.E. HAVLIN G. KEMP, P.E. A X E JOHN T. BROOKS t'. ctober 4, 2 ® ASSOCIATES KEVIN M. KAPLAN, P.E. RECEIVED 60 194 5 _ bG 2-3 a OCT - 920'00 FILE COPY Darrel Watkins City of Tigard COMMUNITY DEVELOPMEN; A�O�L A -61/V� 13125 SW Hall Blvd. Y Tigard, OR 97223 -8199 Re: Tigard Corporate Center — Building A 12123 SW 69 Tigard, OR Permit No.: BUP1999 -O9— 00Z 3.7— Dear Mr. Watkins: VLMK Consulting Engineers has performed Structural Observations on the above noted project, as required by the 1998 Oregon Structural Specialty Code (OSSC), Section 1702 as follows: 1. Observations of footing reinforcing steel. 2. Observation of concrete tilt -wall reinforcing steel. 3. Observation of roof and floor structure. 4. Observation of lateral load- resisting elements. Observations were performed on the above noted elements and reports of observations were submitted to the City of Tigard Building (Inspection) Department. To the best of our knowledge, the work on this project is in conformance with the approved plans, specifications and Engineers directives. If you have any additional questions regarding Structural Observations on this project, please do not hesitate to contact me at (503) 222 -4453. Best Regards, A.D.Iiisae■\ V K Consulting Engineers �._ � �'° � ` / 5 r , y James E. Knauf, P. P.E. / Principal ■ 7 i �o, AO' 4 e8 E.KN P J , cc: Specht Development, Inc. Bob Burns ' Baugh Construction Company — John Lawrence t".)ce 60, 10- ZOc)/ LRS Architects Carlson Testing e G R Ns o c 0 E a JEK:jjs Y 4 caoN,,` K:\Letters \TCC Bldg. A - 10- 4- 00.doc MEMBER