Loading...
Report (616) Y v Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc. Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330-9155 FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163 et) A ?-c6 Z May 2 36.0 RECEIVED T9902536.CTI Permit No. BUP1999- 00232/00440 MAY 0 9 2Q00 INSPECTION REPORT BY: DATES COVERED: May 4; 2000 PROJECT: Tigard Corporate Center — Building A ADDRESS: 12123 SW 69th, Tigard, OR INSPECTOR: G. Seamster ICBO #5006921 -85 05- 04 -00: CTI representative was onsite and the following was noted. 1. Reviewed WPS and welder qualifications for Joe Taylor SSN# 537 -76 -7001 and William Sasse SSN# 282 -54 -5553, with Glu Lam Structures (see attached for welder qualifications). 2. Verified torque value after installation of (6) 3 /4" diameter x 6" long Ramset wedge anchors at 175 ft/Ibs per ICBO report #1372. Anchors were installed at grid line N3-4 roof line into existing tilt up wall for angel iron joist ledger. Two wedge anchors, one at each ledger plate were unable to meet required torque value. Re- inspection to follow once re- installed. All anchors achieved 4" minimum embedment per detail 5 of fax received from Jim Riemenschneider with VLMK Engineering (see attached). Our reports pertain to the materials inspected /tested only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. i) Respectfully submitted i. CARLS !,. TESTING, 1 . _ j CHIEF EXECUTIVE OFFICER Douglas W. Leach Chief Executive Officer GS /Ijm Attachments cc: Specht Development, Inc. — Bob Burns City of Tigard Building Department Baugh Construction Co. . LRS Architects VLMK Consulting Engineers .. 3933 SW KELLY AVENUE, PORTLAND, OREGON 97201 -4393 7 (503) 222 -4453 / FAX (503) 248.9263 FAX TRANSMITTAL (Please call 222 -4453 if all pages are not received) TO: Baugh Construction - Ste DATE: May 3 2000 ATTN: Chris Hartson, John .Lawrence FROM: Jim Riemenschnelder PROJECT: Tigard Corporate Center T.I NO. OF PAGES TO FOLLOW: 7 URGENT, PLEASE HAND DELIVER Yes COPY TO FOLLOW IN MAIL — COMMENTS: 443 -2291, 221 -2077, 239 -8174 RE: TCC bldg. A roof reinforcement for Unit WITH concrete curb and concrete pad. REVISED 5/03/2000 John, Chris, Mike and Mike: Here's what needs to be done to reinforce the roof per the meeting on May 2nd, for building A, under the new mechanical unit PAY SPECIAL ATTENTION TO THE LOCATION OF THE UNIT AND THE CURB OUTLINE. THE CURB MUST No EXTEND SOUTH OF THE EXISTING JOIST THAT IS 10' NORTH OF GRID "3 ", NOR EXTEND NORTH OF THE EXISTING JOIST THAT IS 10' NORTH OF GRID "4 ". Questions or comments, give us a call ASAP. Thanks, Jim Riemenschnelder Structural Designer jimr @vimk.com cc: Mike Jones - LRS Architects, Mike Dyer - Wood - Lam Structures. \ \VLMKISYS\USERSUIMIWLMS W ORDFILES199459FAX05.doc 6/"I'd S833IJ19N3 NW1A WH : RA AM, FA l.HU