To: Al Shields, City of Tigard
Fax No: (503) 624 -3681
From: Steve Kenworthy
Date: Aug. 19, 2004
Subject: Gettysburg Apts
Pages: 4 (including cover sheet)
Al,
Here is my current proposal in contract form, to Camille Krichmar, owner of Gettysburg Apts.
Attached also please find a preliminary plan of the project. Before giving me the go ahead Camille
wants to know from you if the proposal appears satisfactory to the City of Tigard as to meeting
your requirements.
As soon as she is OK I will apply for the permit. It is my goal to start the project as early as
possible next week. You had stated previously that you would help expedite the permit and help
manage a smooth inspection process. We are ready to go at any time so the sooner we can
proceed the better. Thanks for your assistance.
Steve K.
Stephen V. Kenworthy
P 0 Box 533
Ridgefield, WA 98642
(360) 887-1149
FAX: (360) 887 -9322
E- MAIL :drainagemasters @comcast.net
., Aug 19 04 02:55p Steve Kenworth 694-5847 }y C ?\ p.2
Drainage Masters /NW Raingardens CONTRACT
PO Box 533, Ridgefield, WA 98642 Date Contract #
(360) 887- 1149/Toll Free (877)887 -1149 t /2G/2tnw 2004-25
WA. Contractor Lic. No. NWRAIDM044PZ
OR. Contractor Lic. No. (CCB #)126506
Name 1 Address
For: Gettysburg Apartments
10735 SW 69th Ave.
Tigard. OR 97223
DESCRIPTION
Install new roof drain collection system for all units. Connect to existing 8" storm drains located along north and west
(north half of lot) property lines)
Materials:
3" ABS pipe, 480 ft
3" ABS pipe fittings, (120)
Subtotal
Install 24" Belco Steel catch basin at low end of parking lot and install new 6" pipe to west end of property to connect to
existing 8" storm sewer.
Materials:
6" ABS Pipe (or D -3034)
6" ABS Fittings (10)
24" BELCO Steel Catch Basin with 6" outlet
Excavator
Subtotal
Remove strip of asphalt along lower end of parking area and install new asphalt curb from NW comer to SW corner
approx. 55 ft long x 1 ft wide.
Materials:
Hot Asphalt Mix, 1 ton
Asphalt Saw rental
Disposal of asphalt, .5 ton
Subtotal
Permit fee
Subtotal
Page 1
Rug,,19 04 02:55p Steve Kenworth 694 -5847 p -3
Drainage Masters /NW Raingardens CONTRACT
PO Box 533, Ridgefield, WA 98642 Date Contract #
(360) 887- 1149/Toll Free (877)887 -1149
WA. Contractor Lic. No. NWRAIDM044PZ 1/26/2004 2004 -25
OR. Contractor Lic. No. (CCB #)126506
Name / Address
For: Gettysburg Apartments
10735 SW 69th Ave.
Tigard, OR 97223
DESCRIPTION
Subtotal
CONTINGENCIES:
Covers circumstances such as unknown underground (waterlines, concrete, etc.), extraordinary utility conflicts, poor
existing roof drain connections to the main pipes, and other unforeseen circumstances that significantly impact the ability
to complete the work as proposed.
1 .Payment of $3000 is due in advance. Payment in full on completion.
2. General Contractor arranges utility locate. Subtotal 516,240.80
3.A11 work to be performed as specified above.
4. Any alterations or deviations from this contract shall be approved in writing by both
parties and may include additional costs. Sales Tax (0.0%) 50.00
Signatures Total 516,240.80
Page 2
•