Correspondence - R
goo,s-z, A
August 31, 2005
CITY OF TIGARD
OREGON
American Heating Inc
Dale Hammett
1339 SE Gideon St
Portland, OR 97202
RE: TI MECHANICAL SYSTEM — CADENCE
Project Information
Building Permit: MEC2005-00522 Occupancy Type: B
Tenant Name: Cadence Construction Type: II- B
Address: 13221 68 Parkway4 /0() Occupant Load: 47
Area: unk Sq Ft Stories:
The plan review was performed under the State of Oregon Mechanical Specialty Code
(OMSC) 2002 edition; The submitted plans are approved subject to the following.
1. The building or structure shall not be weakened by the installation of mechanical systems.
Where floors, walls, ceilings or any other portion of the building or structure are required
to be altered or replaced in the process of installing or repairing any system, the building
or structure shall be left in a safe structural condition in accordance with the Building
Code. The cutting, notching and boring of framing members shall comply with OMSC
302 Sections 302.3.1 through 302.5.3.
2. Ducts shall be supported with approved hangers at intervals not exceeding 10 feet
or by other approved duct support systems designed in accordance with the Building
Code. Flexible and other factory-made ducts shall be supported in accordance with the
manufacturer's installation instructions. 603.10 OMSC
3. Metallic Ducts shall be supported in accordance with Sheet Metal & Air Conditioning
Contractors National Association, Inc. (SMACNA) — Metal and Flexible. OMSC 603.4
4. Equipment and appliances regulated by this code requiring electrical connections shall
have a positive means of disconnect in accordance with the Electrical Code. 301.7 OMSC
5. Appliances shall be accessible for inspection, service, repair or replacement without
removal of permanent construction. 306.1 OMSC
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
Mercury Thermostats. The State of Oregon prohibits the installation of thermostats that
contain mercury in commercial and residential buildings. "In accordance with ORS 455.355,
the disposal of thermostats that contain mercury shall be in accordance with programs
established by thermostat manufacturers, their representative or distributor, or by delivery to
sites that will ensure that the mercury does not become part of the solid waste stream or
wastewater."
Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall
be maintained on the jobsite. The plans shall be available to the Building Division inspectors
throughout all phases of construction. 106.4.2 OSSC
When submitting revised drawings or additional information, please attach a copy of the
enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of
Tigard in tracking and processing the documents.
4. ly,
Val Henzel,
Senior Plans Examiner
�f 1
FIRE ALARM SYSTEM INSPECTION CERTIFICATION
Facility Name: PLAZA WEST Monthly Quarterly
Address: 9600 SW OAR Sent-Annual Annual X
(My/State/Zip: TIGARD, OR 97223
Teat Date 6 -4 -96
Operator: 94 I Panel In test 9:00a 1 Panel out of test NOON
Control Panel:
Type: HARDWIRE It of zones: 6
ModetF FC 72 # of zones used: 6
Non -Reset voltage: 26 # of panel audible circuits: 2
Reset voltage: 26
Battery voltage: 13/13 Communication Circuit(s) voltage: N / A
Verify fuses: # 1 , 2. 3, 4 , 5, AC
Auxiliary Panels: .
Audible circuit expander. Type and size:
N / A Batteries voltage:
Power supplies: Type and size:
N / A Function:
Battery voltage:
Auto Olaier: Type SR 5107
Battery voltage: 13
Devices Tested: (Attach printout if available)
Smoke detector 10
Meet detector 0
Pull Statton7 0
Sprinkler FIT: 0
Duct detector: 0
Audible signals tested: Yes. No-
Panel Outputs Tested:
Auto dialer: # of zones sent off Site 6 Alarm 5
Trouble 1
# of zones received: 6 Alarm 5 Trouble 1
Zones Rested 6 Yes: X Na
Door holder Number 8 Results:
OR
Elevator recall: NO Number of cabs:
Results:
MVAC Shia: Number of NO
• units: Results:
Test Results:
Panel returned to normal: Yes: X
No:
ezneamaimmageommi -asap
System deficiencies: PHONE LINE TWO HAS TALK VOLTAGE, BUT
DIAL TONE DOES NOT APPEAR ON DEMAND.
4 EAST SMOKE DETECTORS ARE STILL DIS-
CONNECTED DUE TO MULTIPLE FALSE ALARMS.
Recommendations: HAVE PHONE COMPANY REPAIR PHONE LINE TWO.
4 SMOKE DETECOTRS ARE DISCONNECTED DUE TO
MALFUNCTION CAUSING MULTIPLE FALSE ALARMS—
' REPLACEMENT OF DETECTORS IS PENDING —
MANAGEMENT APPROVAL FOR UPGRADE.
(PLEASE SEE ATTACHED PROPOSAL)
Technician:
' 1 Date:
T.wsw
Advanced ServicesScooiration
P.O. Box 55608 $ PORT LAY 1R 97238 -5608 + (503)287 -3889 + tax 287.
FAX
Date: August 12, 1996
To: Deborah• ASA Properties .
Fax: 224 -5153
From: Tania Albert
Regarding: Plaza West- Fire Alarm System
Pages Including This Cover: 1
Message: Deborah:
In response to your questions regarding the communication between your
Fire Alarm Control Panel and your Monitoring Company, both of your
phone lines appear to be communicating efficiently. In speaking with
Operator 90 at Alarm Central Station, it was determined that there have
been no reports of Phone Line Trouble or Failure in recent months, and I
was also advised that your panel is sending a test signal consistently. All
test signals are sent via the phone lines, therefore should your phone lines
he in a trouble status, the monitoring company would be receiving no
timer test, or a failure to communicate signal code. If you have any
questions, or if I can be of further assistance, please do not hesitate to
contact me. Thank you.
Sinceroly,
Tania L. Albert
Office Manager