Permit CItYID TIGARD BUILDING INSPECTION DIVISION - MST
24 -Hour Inspection Line: 639 -4175 Business Line: 639 - 41741
BUP f - 2 - 0 0 ( - 00.) - (e,
Date Requested D / / Z3 AM PM BLD
Location / �- �D �f 4 O F b U Suite MEC
Contact Person Ph 3/ cg.( PLM
Contractor Ph SWR
BUILDING Tenant/Owner ELC
Retaining Wall ELR
Footing Access:
Foundation FPS
Ftg Drain SGN
Crawl Drain Inspection Notes:
Slab SIT
Post & Beam
Ext Sheath /Shear
Int Sheath /Shear
Framing 0 �'�/✓� -�� " l��Z��rlil f —
Insulation
rywall Nailin > Ligil Air � / OP • •_
Fire Sprinkler
Fire Alarm , 1
Susp'd Ceiling ^ A A ' 1� - \
Misc
Ata FAIL
WBI
Post & Beam -
Under Slab
Top Out
Water Service 1Ar) re_
Sanitary Sewer - (�
Rain Drains W\ zeLA---1_, Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm
Final
PASS. PART FAIL
SITE
BackfilllGrading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
Fire Supply Line
ADA
Approach /Sidewalk // I.
Other Date '1 l Inspector
Final
PASS PART FAIL DO NOT REMOVE this inspection record from the job site.