Loading...
Permit BUILDING PERMIT - CITY OF TIGARD PERMIT #: BUP2008 -00009 COMMUNITY DEVELOPMENT DATE ISSUED: 1/11/2008 TIGARD 13125 SW Hall Blvd., Tigard, OR 97223 503.639.4171 PARCEL: 2S 101 AD -03200 SITE ADDRESS: 12909 SW 68TH PKWY 350 ZONING: MUE SUBDIVISION: TIGARD TRIANGLE CENTER LOT: JURISDICTION: TIG PROJECT: DELTEK Project Description: Plug (2) sprinkler and relocate (3) heads. REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION CLASS OF WORK: FPS FIRST: sf N: S: E: W: TYPE OF USE: COM SECOND: sf PROJECT OPENINGS? TYPE OF CONST: sf N: S: E: W: OCCUPANCY GRP: TOTAL AREA: 0 sf ROOF CONST: FIRE RET? OCCUPANCY LOAD: BASEMENT: sf AREA SEP. RATED: STOR: HT: ft GARAGE: sf OCCU SEP. RATED: BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED FLOOR LOAD: psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET: DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC: BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING: VALUE: $ 1,155.00 Owner: Contractor: PACIFIC REALTY ASSOCIATES DELTA FIRE INC 15350 SW SEQUOIA PKWY #300 -WMI 14795 SW 72ND AVE PORTLAND, OR 97224 PORTLAND, OR 97224 Contact #: PRI 503 - 620 - 4020 Phone: FAX 503 -620 -1058 Reg #: LIC 64174 FEES Description Date Amount REQUIRED ITEMS AND REPORTS [BUILD] Permit Fee 1/11/2008 $62.50 [TAX] 12% State Surch 1/11/2008 $7.50 Total $70 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0100. You may obtain a copy of these rules or direct questions to OUNC by calling 503.246.6699 or 1.800.332.2344. i Issued By: il j ` . _ Jr Permittee Signatures i,e ' I Call 503.639.4175 by 7:00 a.m. for an inspection that business day. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Fire Ptrotection System EC I` ED Building Permit ApplicaR iot>r G1 V FOR OFFIci, usi•: ONLY City of Tigard JAN 11 2000 Received / i o , ° 13125 SW Hall Blvd., Tigard, OR 97? C prl Plan Review ' Permit • : bi . 40 x01.0 Phone: 503.639.4171 Fax: 503.59 Q` T�A Date /B : Other Permit: T I G A R D Inspection Line: 503.639.4175 BuiwiN GENtstoN Date Ready/By: ® See Page 2 for Internet: www.tigard or.gov Notified/Method: En Supplemental Information TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ® Addition /alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1- and 2- family dwelling ® Commercial/industrial Valuation: $ ❑ Accessory building El Multi-family Number of bedrooms: ❑ Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 12909 SW 68 Parkway New dwelling area: square feet City/State/ZIP: Portland, OR 97224 Garage/carport area: square feet Suite/bldgJapt. no.: #350 Project name: Tigard Triangle - Deltek Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: Lot no.: Permit fees* are based on the value of the work performed. Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. Plug 2 Fire Sprinkler Heads and Relocate 3 Fire Sprinkler Heads Valuation: $$1,155.00 Existing building area: square feet New building area: square feet ❑ PROPERTY OWNER 0 TENANT Number of stories: Name: Type of construction: Address: Occupancy groups: City/State/ZIP: Existing: Phone: ( ) Fax: ( ) New: ® APPLICANT ❑ CONTACT PERSON NOTICE Business name: Delta Fire, Inc. All contractors and subcontractors are required to be Contact name: Heidi Scarbrough/Eric Loewer licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: 14795 SW 72 Ave. jurisdiction in which work is being performed. If the City / State/ZIP: Portland, OR 97224 applicant is exempt from licensing, the following reasons apply: Phone: (503) 620 -4020 Fax: : (503) 602 -1058 E -mail: heidis@ deltafire .com/ericl @deltafire.com CONTRACTOR BUILDING PERMIT FEES* Business name: Delta Fire, Inc. (Please rtjertoleeschedule) Permit fee: Address: 14795 SW 72 Ave City/ State/ZIP: Portland, OR 97224 State surcharge (8% of permit fee): FLS plan review (40% of permit fee): Phone: (503) 620 -4020 Fax: (503) 620 -1058 (Due upon application.) CCB lic.: 64174 Total permit fees: Authorized signature: This Amount received: 2 s permit application expires if a permit is not obtained Print name: Heidi Scarbrough Date: 1 -11 -2008 within 180 days after it has been accepted as complete. * Fee methodology set by Tri-County Building Industry Service Board. I: \BuildmglPermits \FPS- PermitApp.doc 03 /23/06 440- 46I3T(II /02/COM/WEB) City of Tigard: Fire Protection Permit Checklist Page 2 - Supplemental Information Describe work to be done: 1.) ❑ New 2.) Modification to sprinkler heads only. ❑ Addition ® 1 -10 heads: No plan review required. ® Alteration ❑ 11+ heads: Plan review required. ❑ Repair Number of sprinkler heads: 5 Additional description of work Type of System (Complete A, B, C or D as applicable): A.) Commercial Sprinkler ® Wet ❑ Dry Additional Standpipes NA Information: Hazard Group Ord. Group II Density 1500 Design Area 0.10 K. Factor 5.62 Sprinkler Project Valuation: $ 1,155.00 B.) Type I - Hood Fire Suppression System Hood Project Valuation: 1 $ N/A C.) Fire Alarm Submittal shall Battery Calculations ❑ Yes include: Individual Component ❑ Yes Cut Sheets Fire Alarm Project Valuation: $ N/A D.) Residential Sprinlder (Stand Alone System) Square Footage: Permit Fee: 0 to 2,000 $187.50 2,001 to 3,600 $232.50 3,601 to 7,200 $292.50 7,201 and greater $381.50 Sprinkler Project Square Footage: N/A sq. ft. Fire Protection Permit Fees Project valuation subtotal (see A, B & C above): $ 1,155.00 Permit fee based on project valuation (see fee schedule): $ 62.50 Permit fee b ed on square footage ee D above): $ N/A t State Surcharge (N's of permit fee): $ 7.50 FLS Plan Review (40% of permit fee): $ N/A TOTAL: $ 70.00 Plan review requires a completed application and 2 sets of plans at submittal. Plan review fees are required at submittal. "New" fire protection systems require that plans bear the original seal of an Oregon licensed fire suppression engineer, or NICET level "3" technicians. http: / /wwwcitigard.or.us /city_ hall /departments/cd/docs /FPS- PermitApp.doc 2 CITY OF TIGARD BUILDING DIVISION _. PERMIT #: SUP20t: 00009 13125 SW Hall Blvd., Tigard, OR 97223 DATE ISSUED: 1/11/200f3 Phone: (503) 639 -4171 14'111 � Inspection Requests (24 Hrs.): (503) 639 -4175 :•. !. INSPECTION WORKSHEET FOR DATE: 214/200 TIME: 7 :01AM PAGE: 36 SITE ADDRESS: 12909 SW 68TH PKWY 350 CLASS OF WORK: SUBDIVISION: TIGARD TRIANGLE CENTER LOT #: TYPE OF USE: PROJECT NAME: DELTEK DESCRIPTION: plug (2) sprinkler and relocate (3) heads. OWNER: PACIFIC REALTY ASSOCIATES, PHONE #: CONTRACTOR: DELTA FIRE INC PHONE #: J03.62U - 4020 Inspection Request Scheduled For: Date: 2/14/2008 Pour Time: Code # Inspection Description Confirm # Contact # Message 299 Final inspection 064975 -01 503-620-4020 N Corrections /Comments/ Instructions: 40 :ARTIAL APPROVAL ❑ CANCEL ❑ NO ACCESS • FAIL . LL FOR INSPECTION ❑ ADDITIONAL FEES ASSESSED Inspector: AMP Date: 2 / `f U_ Phone #: (503) 718 - v CITY OF TIGARD A , _ BUILDING DIVISION w PERMIT #: Bl)P2009 -00009 13125 SW Hall Blvd., Tigard, OR 97223 D ATE ISSUED: 1/11/200; Phone: (503) 639 -4171 s mu � Inspection Requests (24 Hrs.): (503) 639 -4175 ..' �I I.. INSPECTION WORKSHEET FOR DATE: 2/1312008 TIME: 7:01AM PAGE: 4 SITE ADDRESS: 12909 SW GOTH PKWY 350 CLASS OF WORK: SUBDIVISION: TIGARD TRIANGLE CENTER LOT #: TYPE OF USE: PROJECT NAME: DELTEK DESCRIPTION: Plug (2) sprinkler and relocate (3) heads. OWNER: PACIFIC REALTY ASSOCIATES, PHONE #: CONTRACTOR: DELTA FIRE INC PHONE #: 50-610 - 4020 Inspection Request Scheduled For: Date: 7/13/2009 Pour Time: Code # Inspection Description Confirm # Contact # Message '.- '°°° :4 910 SprinFdc3r rough -in /test 0E1969-01 503-956-6290 Corrections /Comments/ Instructions: 1 41111trriliall■ mf. RTIAL APPROVAL ❑ CANCEL ❑ NO ACCESS ❑ FAIL I1, CALL FOR INSPECTION ❑ ADDITIONAL FEES ASSESSED Inspector: ∎_ - ■ Date: dv Phone #: (503) 718 - r .„..