Loading...
Plans (143) ( 1 .7 1 o (9 8 tx)y, Site Address: Building Division I i Transmittal Letter City of Tigard DATE RECEIVED: TO: N2-14.1 h oc l� DEPT: BUILDING DIVISION EOEI '/� MAY 2 2 2006 1 FROM: a V��� -E1 _ COMPANY: bit Cr-) 4 ) nV -)1' U - 1C7fa j BUTLDINC V VyeToi\I PHONE NO.: Sol 24-4 05 RE: 6i1P0'%05 (PSG (Case number, site address, etc.) (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: _1 Description:. 1 Copies: 1 Description: Additional set(s) of plans. / Revisions: ccD ov 1 Cross section(s) and details. Wall bracing and/or lateral analysis. Floor /roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other (explain): REMARKS: Fe, y ( 2ev FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: 1 ❑ Yes 1 ❑ No Fee Description: Amount Due: • • Special Instructions: Reprint Permit (per PE): ❑ Yes I ❑ No ❑ Done Applicant Notified: Date: Initials: : Building \Forms\LetterTransmittal.doc 01/17/06 r 01* • \ a � �a ■ 9 J�� 1 , r , f " 9 h i.., i , v IA il. Document G714 - 2001 • Construction Change Directive PROJECT: (Name and address) DIRECTIVE NUMBER: 001 OWNER: Tigard Triangle Commons - Building DATE: April 27, 2006 Four ARCHITECT: Ei 11740 SW 68th Parkway CONTRACT FOR: General Construction CONSULTANT:El TO CONTRACTOR: (Name and address) CONTRACT DATED: April 07, 2006 CONTRACTOR: P & C Construction ARCHITECT'S PROJECT NUMBER: P.O. Box 410 101100.04 FIELD: Gresham, OR 97030 OTHER: ❑ You are hereby directed to make the following change(s) in this Contract: (Describe briefly any proposed changes or list any attached information in the alternative) Change to size of structural columns - see attached 8 -1/2 "x11" sheet, R1- S2.1 -1. PROPOSED ADJUSTMENTS 1. The proposed basis of adjustment to the Contract Sum or Guaranteed Maximum Price is: ❑ • Lump Sum (increase) (decrease) of $ • ❑ • Unit Price of $ per ® • As provided in Section 7.3.3 of AIA Document A201 -1997 ❑ • As follows: 2. The Contract Time is proposed to (remain unchanged). The proposed adjustment, if any, is 0 days. When signed by the Owner and Architect and received by the Contractor, this Contractor signature indicates agreement with document becomes effective IMMEDIATELY as a Construction Change Directive the proposed adjustments in Contract Sum and (CCD), and the Contractor shall proceed with the change(s) described above. Contract Time set forth in this CCD. Mildren Design Group, P.C. Pacific N.W. Properties P & C Construction ARCHITECT (Firm name) OWNER (Firm name) CONTRACTOR (Firm name) 7650 S.W. Beveland Street 6600 S.W. 105th Avenue P.O. Box 410 Suite 120 Suite 175 Gresham, OR 97030 Tigard, Oregon 97223 Beaverton, Oregon 97005 ADDRES ADDRESS ADDRESS ignature) BY (Signature) (i uree) Dan Vasquez Paul Gram Les J cobson (Typed me) (Typed name) (Typed name ¥ .2g.06 4 jz8lo(� .4 /i /06 DATE DATE DATE AIA Document G714n — 2001. Copyright ® 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of It, 1 may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 09:31:42 on 04 - 2006 under Order No.1000213441_1 which expires on 2007 01 - 04, and is not for resale. User Notes: (4037439447) • . 0 4 - 1 1 I 18' -3 1/8' 1 1 I C3 1 1 C3 • : I - ;�:'► P. Mi11 1 1 • C ! . J _ (i::.‘1*.o. / \ I 0 1 1 .0. 1 1 1 1 1 C6 P10.0 1 C1 In 1 ® I 1 • 4 1111 111111 _ NORTH • Triangle Commons - Bldg. 4 Date 25 April 2006 AFGHAN ASSOCIATES INC. Drawn by: Checked by: CONSULTING ENGINEERS Structural Foundation Plan CSC SY 6960 6.W. Varga SL sups 2.00. Tigard. Oregon 67223 Revisi on Sheet R 1- S2.1 -1 (60.71 620-3030 Fau 620-6539 AN JOB NO. A05224.04 Job Number: 101100.04