Loading...
Correspondence D A S.SC O IAT . __......... 1904 NE 60th Avenue January 8, 1998 Portland, OR 97213 Tel: 503 - 282 -7815 Fax: 503 -282 -3454 Pager: 503- 940 -5517 DABassoc@aol.com Mr. Robert Poskin, CBO — City of Tigard - Building Department. 13125 SW Hall Blvd. Tigard, Oregon 97223 Re: Providence Tigard Facility 11308 SW 68th Parkway Building Plan Review BUP#: 97 -0561 PC #: 12 -67c Dear Robert, The following document is a response to your Building Plan Review letter dated December 24, 1997. This project will conform with the applicable 1996 Oregon Specialty Codes and other applicable codes and standards. ENERGY COMPLIANCE: All lighting moved or replaced will meet all requirements of the Oregon Non - Residential Energy Code. The signed electrical drawings have a note confirming that this will be done. (The electrical drawings have been submitted separately by Oregon Electric Group.) ACCESSIBILITY: Item #1 and #2: The proposed barrier removal scope of work for this project will complete all required A.D.A accessibility requirements. (This facility has/will have approved A.D.A. accessible Men's and Women's restrooms, drinking fountains, public phone area, door hardware, maneuvering clearances, entry, parking stalls, etc.) (Refer to the Revised Barrier Removal Cost Breakdown) FIRE & LIFE SAFETY: Item #1: The lower level corridor will be constructed per the attached "Revised Option B" detail drawing BPR -1. Note: In order to reduce the '\ conflicts of existing conditions the new sheet rock lid will be below the Licensed • existing ductwork.) Oregon California Washington Providence Tigard Facility City of Tigard - Building Plan Review January 8, 1998 Page 2 of 2 Item #2: The existing 1 -HR Corridor 223 will provide a smoke -tight vestibule for the Freight Elevator in lieu of providing a new smoke -tight door in Elevator Vestibule 113. Item #3: A new smoke - tight, 20 min. rated door will be provided on the 2nd Floor Elevator /Stair 239 in lieu of Corridor 140. (There is not enough clearance in the lower level corridor.) Refer to the attached drawing BPR -2. This door will be on a magnetic hold -open activated by the alarm system. Item #4: The following doors have been site verified to have 20 minute labels: Doors 113B, 109, 142A, 133 and 112B. ENVIRONMENTAL AIR: The outside air requirements from OSSC, Chapter 12 will be addressed by the Mechanical Contractor. MECHANICAL /SPRINKLER SYSTEM: Separate mechanical and sprinkler system applications and plans will be submitted. (The mechanical drawings have been submitted separately by Fullman Company. The fire protection system drawings will be submitted by 3 -D Protection and Basic Fire Protection.) Attached are two sets of the revised submittal documents for your use in issuing the Building Permit. We are anxious to complete the review process and obtain our building permit. If you have any additional questions or concerns please do not hesitate to call. Si ce ely, I My / / la 'e a . bra 4 . In Association w. • . Jurgens, Inc. DISTRIBUTION: Ken Zinsli, Providence Facilities Services Warren Simpson, Providence Facilities Services Jeff Stanton, In -Line Construction Dennis McCarty, Oregon Electric Group Paul Lukes, Fullman Company Emily Nudelman, Providence Information Services Dabrowski & Associates