Correspondence 0 r,
r
r O
a`
� �r�`HVAC 99
Date: August 31, 2010 Revision P y
H E A T 1 N G
To: Anthony Trapani — SD Deacon
From: Diane Gardner 5188 SE International Way
Milwaukie, OR 97222
Subject: ACS — Triangle Point (503) 462-4822
Sub
J (503) 462 -6555 FAX
CCB # 50897
HVAC Proposal to furnish and install the following:
1 7.5 ton cooling only split system with low ambient control — no humidity control for LAN
Room (tenant to verify tonnage and if humidity controls are required) includes refrigerant
and condensate piping, programmable thermostat, smoke detector
1 VAV box to be utilized as redundancy system for LAN room (will not be on a generator)
Demolition of existing ductwork and diffusers as needed in areas of new tenant space
Installation of new ductwork and insulation for new tenant space as required
Re -using existing supply and return diffusers (take from vacant areas if necessary)
2 Fire smoke dampers at first floor shaft
Air balance
Permit
Engineered drawings
Crane