Loading...
Report R err , r g 45 S.E. 102nd RE W ER30:3 LSIJVgONEE4zSOl1V@ A DLS @PUV DUVO. PORTLAND, OR. 97216 4F-T, CIVIL — STRUCTURAL ENGINEERS PH: (503) 254 -6292 FAX: (503) 254 -6761 FINAL PERIODIC INSPECTION REPORT BEVELAND BUILDING • g_5" l .SSW 68th Ave Tigard, Oregon COPY Permit # BUP2002 -00522 FILE J.T. Roth Construction Co. December 8, 2003 City of Tigard Building Dept. 13125 SW Hall Blvd Tigard, Oregon 97223 Fax 503- 684 -7297 This is to certify that in accordance with the provisions of the State Building Code, Section 307, and to the best of my knowledge, the work has been done in accordance with the approved plans, specifications, approved change order and applicable workmanship provisions of the State Building Codes and Standards. Special inspections were completed by Carlson Testing, Inc. and have been reviewed and approved. Respectfully submitted, C 1M «@ PR t Payton Rowell, PE a. T& cc: J.T. Roth @ 503-624-0239 cc: PDW @ 503- 257 -1892 (�; ,� . - . `�gy�3r F EiC;='S; r.:s: 3t Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc. Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155 FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163 Special Inspection FINAL SUMMARY LETTER December 9, 2003 T0302948 City of Tigard 13125 SW Hall Blvd., FILE C Tigard, OR 97223 -8199 Attn: Building Department ias II Re: Bevels Building 5 SW 68 Avenue - Tigard, OR Permit No.: BUP2002 -00522 Dear Sir or Madam: This is to certify that in accordance with Section 1701 of the Uniform Building Code, Title 24, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Epoxy Anchors Structural Steel — Shop, includes verification of welder certifications, weld procedures and material certifications. All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Budding Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. James F. Hietpas Operations Manager Is cc: JT Roth Construction Company — Richard Myrick Rowell Engineering & Desigrinc Pacific Design Works — Peter Waslil- Northwest Construction Management-Inc