Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report (2)
otk3gop .50a- - oar / ROB l`J�/ EL L EN§OUVEEFAOUV� EIS @OgN rn i P RTLAND, OR. 97216 4-=___= CIVIL - STRUCTURAL ENGINEERS PH: (503) 254 - 6292 FAX: (503) 254 -6761 PLAN REVIEW RESPONSE January 28, 2003 • 8700 Bulding ( 41 ©. e 12505 SW 68th Tigard, Oregon • Permit # BUP2002 -00522 J.T. Roth Construction, Inc • Winstead and Associates Plan Check Service • Phone 503 - 723 -8003 RECEIVED • Fax 503- 723 -8234 Email: codeexpert @msn.com IJAN 31 2003 1. General Requirements: No comment CITY OF TIGARD 2. Plans & Documents: BUILDING DIVISION a. Letter of Supervision attached. b. No Response c. Deferred drawings note added to plans, sheet 6 & 24 d. Tenant improvement plans to be submitted later. Notes on sheet 1 & 24, on deferred submittals. Rev 1/28/03 3. Building Classification No comment 4. Occupancy Requirements: e.1 Toilet room finishes noted on sheet 6 e.2 Noted on sheet 6,7,20 & 21 t;g & h No comment 5. a.1 Fire extinguisher locations noted to sheet 24. b.1 Noted on sheet 2 & 24 6. a. No comment b. Corridor not regd. Revised sheet 1, Sec 4/11. c. Penetrations noted on sheet 11 & 27. d. Revised sheet 11. e. No comment f. See 7a2 below g. No comment h. Noted & specified on sheet 27 i,j No comment 7. Exiting: • a.1 No comment a.2 Sheets 6 & 7 revised to show stairway to be minimum 46' from c/1 of each stairway. b Not reqd do to 1/2 diagonal separation • • c.1 Exit signs noted on sheets 6, 7, 18 &19 c.2 Intensity noted on shet 6, 7, 18 & 19. d Door frame ID noted on sheet 6 e.1 Revised stairway to include a landing. sheets 6, 7, 10, 11, e.2 Handrail detail noted on sheet 6, 7 & 10 Sect 5/10 & 6/10 8.. I Iandicapped accessibility a. No comment b.1 Van accessible signage complied , sheet 2 b.2 Slopes defined, sheet 2 c.1 Threshold heights defined. sheet 6 d.1 Symbols for restrooms noted, sheet 6, 7, @ADA toildt rom. e.1 Striker -side clearances defined. sheet 18 &24 f.1 Lavatory clear floor area revised, sheets 6, 7, @ADA toilet rm. g.1 Closed riser detail on sheet 2 Detail 1/2, sheet 10 Detail 7/10 h. 1 Rescue Assistance room provided to meet 1107. Revised 1st & 2nd fir pin. 9. Energy conservation form 4a provided. 10. Detailed Construction Requirements a.1 Slope of crickets defined. Sheets 15 &16 b.1 Anchorage of HVAC equipment calcs & details enclosed c. Attic draft stops noted to plans, sheets 10, 11, 15 &16. d Tempered glass locations noted sheets 6, 7. e. Suspended ceiling details. See sheet 19. f. Flame spread finishes defined sheets 6, 7, 10 &11. g. Hoistway venting noted, See sheet 11 11. Mechanical Review Comments a. thru 1. Noted on sheets 20, 21 & 26 12. Structural Review Comments a. Letter attached re: truss shop drawing b. HVAC load calculations attached c. Soils report by GeoPacific states an allowable bearing of 2000 psf. d. Seismic load controls the lateral design. Respectfully submitted, Payton Rowell, PE