Loading...
Plans 1 , eop 0 . : WINSTEAD AND ASSOCIATES ARCHITECTURE AND BUILDING CODE SERVICES, PC. P.O. Box 2198 Phone: 503- 723 -8003 Oregon City, Oregon 97045 Fax: 503 -723 -8234 Email: codeexpert(n3msn.com March 20, 2003 Gary Lampella, Building Official ���ENED City of Tigard 13125 SW Hall Blvd. MAR U 2003 Tigard, Oregon 97223 CITY IN � DIVISION I Subject: Winstead & Associates Plan Review: 21 City of Tigard Permit: BUP2002 -00522 Project: 8700 Building 12505 SW 68th TIGARD, OREGON 97223 Dear Gary, The revised drawings and related design documents for the proposed work were REVIEWED AND FOUND TO BE IN SUBSTANTIAL COMPLIANCE with the 2001 edition of the Uniform Building Code with Oregon amendments (OSSC) and the 2002 Oregon Mechanical Specialty Code (OMSC). It is important to note the issuance of a permit shall not authorize the violation of any provisions of the OSSC. Permits presuming to give authority to violate or cancel provisions of the OSSC are not valid. The recommendation for approval and issuance of a permit based on the plans, specifications and related material shall not prevent the building official hereafter from requiring the correction of errors in plans, specifications and related material or from preventing the building from being operated in violation. We recommend approval with conditions. CONDITIONS OF CLEARANCE: 1. Final clearances and permit processing is by the Jurisdiction. 2. A number of redlines have been added to the construction documents for clarification. These include: a. Handrails are required to extend to the first floor. This was a graphic oversight. b. The second restroom on each floor is required to be accessible. This has been marked on the plans. In both cases the door appears to encroach the clear floor space in front of the lavatories. Doors cannot encroach this space so they will need to swing outward. c. The minimum intermediate landing on the straight run is required to be 44 ". d. The room used for "Area of Rescue" has been noted to comply with the provisions of Section 1107.2. DOCUMENTS TRANSMITTED: 1. Two (2) revised sets of plans dated 01/28/03 by Payton Rowell 2. One (1) response letter from Payton Rowell dated 01/28/03. 3. Miscellaneous supporting documents including the structural calculations, and energy forms etc. SENT TO YOU VIA: HAND DELIVERED By: Stephen M. Winstead, Architect Winstead & Associates, Architecture and Building Code Services, PC.