Loading...
Correspondence (557) 08/24/06 THU 11:22 FAX 503 684 0954 CARLSON TESTING zz el001 C arlson Geoteehnical Maln Office Salem Office Bend ice P.O. Box 23814 4060 Hudson Ave., NE Po_ Box 7918 A Division of Carlson Testing, Inc. Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Geotechnical Consulting Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155 Construction Inspection and Related Tests FAX (503) 670 -%147 FAX (503) 589-1309 FAX (541) 330 -9163 Geotechnical Observations FINAL SUMMARY LETTER August 24, 2006 Triplett Wellman Contractors PO BOX 160 Woodburn, Oregon 97071 Attn: Robb Moser PROJECT: Howard (Cascade) Veterinary Clinic - COS F copy ADDRESS: SW 68th Parkway — Tigard, Oregon CGT No. G0402317.A Dear Mr. Moser: At your request, this letter is provided to summarize Carlson Geotechnical (CGT) services and conclusions regarding the geotechnical construction observations and testing for the referenced project. This letter confirms that in accordance with Section 1704 of the 2003 International Building Code, we have performed observations and testing of the following items. Site stripping Removal of existing poor quality fill and replacement with controlled structural fill Proctor (moisture - density) evaluation of fill material Footing subgrade observations Pavement subgrade and base rock proof rolls To the best of our knowledge, the work was in conformance with the recommendations of CGT's Report of Geotechnical Engineering Services (geotechnical report) dated May 20, 2004, and approved plans and specifications. All observations and tests were performed on an on -call basis by the contractor and reported between July 7, 2005 and February 3, 2006. CGT is not responsible for portions of the construction that it did not observe or evaluate by testing. One 30 foot by 30 foot portion of soft pavement subgrade, approximately 40 feet from the northeast building corner, identified during our December 14, 2005 site visit, was overexcavated and replaced with structural fill without CGT confirming that the soft subgrade material had been removed or compaction testing of the fill placed therein. However, the base rock in this area was proof rolled on February 3, 2006 along with other areas of the pavement and showed no significant deflection. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Copies of CGT reports are available in our office for further review if des .ere are any further questions regarding this matter, please do riot hesitate to contact this office.ao P '� t iv Respectfully submitted, + " # ` ,, C` 4 15,764 4 CARLSON GEOTECHNICAL P C.---• 4 y A y4 � 21. William M. Weyrauch, PE YY y y „�, Principal Geotechnical Engineer - *D . 0 4 Distribution: Triplett Wellman Contractors, Inc, Robb Moser — Fax: 503 - 982 -0390 City of Tigard, Attn: Hap — Fax: 503,41 -3681 hi G:1GE0TECH\PROJECTS12004 ProjectslHowara Vet Clinic - C0S1FInal Letter 06 - 24 - 06 wmw.DOC • Albert Shields - FW: Cascade Vet Page 1 ode V � / W / ` Y From: "Leonard Lodder" < leonard @studio3architecture.com> To: "Albert Shields" <albert@tigard- or.gov >, "Carl Springer" <cds @dkspdx.com >, "Chris Maciejewski" <csm @dkspdx.com >, "David Waterman" < DavidW @etcenvironmental.net >, "Gary Lampella" <gary@tigard- or.gov >, "Gary Pagenstecher" <garyp @tigard- or.gov >, "John Dalby" <john.dalby @tvfr.com >, "Kim McMillan" <kim @tigard- or.gov >, "Robb Moser" <rob @triplettwellman.com >, "Tim Gaschke" <tgaschke @cesnw.com> Date: 8/10/2006 8:34:30 PM Subject: FW: Cascade Vet To ensure the widest circulation possible, here is the letter that took the design team 10 days to produce from point of receiving instruction to delivery. Please note, this resolves the issue that would otherwise have been carried out by the City of Tigard as a part of the interagency agreement between CWS and Tigard. You can imagine the conclusion I come to as a result of this experience. • Leonard Lodder, AIA, LEED AP Studio 3 Architecture, Inc. 222 Commercial St. NE Salem, OR 97301 -3410 P: 503.390.6500 C: 503.949.3301 , F: 503.390.6501 E: leonard @studio3architecture.com From: David Waterman [mailto :DavidW @etcenvironmental.net] Sent: Thursday, August 10, 2006 9:19 AM To: Leonard Lodder Subject: RE: Cascade Vet Leonard, I just listened to your voicemail - here is a .pdf of the letter. -David rt Shields - FW: Cascade Vet Page 2 From: Leonard Lodder [mailto: Ieonard @studio3architecture.com] Sent: Wednesday, August 09, 2006 10:38 AM To: David Waterman Subject: Cascade Vet Found the fax. Resent it to Bob Engle although it was sent to him on the 4th. He'II sign and fax to you. Your fax refers to a draft letter, but it wasn't included in what came here. Leonard Lodder, AIA, LEED AP Studio 3 Architecture, Inc. 222 Commercial St. NE Salem, OR 97301 -3410 P: 503.390.6500 C: 503.949.3301 F: 503.390.6501 E: Ieonard @studio3architecture.com