Permit CITY OF TIGARD 24 -Hour
BUILDING Inspection Line: (503) 639 -4175
INSPECTION DIVISION Business Line: (503) 639 - 4171 MST
1 / BUP
Received Date Requested 7 n / ' T AM PM BUP
Location / �� 03 7 - I °� — Suite MEC
Contact Person Ph ( ) D 7 `" 0 3 - rd =o 3
Contractor � Ph ( ) SWR
BUILDING Tenant/Owne d"i— "i // > ELC
Footing ELC
Foundation Access:
Ftg Drain ELR
Crawl Drain
Slab Inspection Notes: S111:7700 17— a
Post & Beam
Shear Anchors
Ext Sheath /Shear
Int Sheath/Shear
Framing
Insulation
Drywall Nailing — - /__..
Firewall
Fire Sprinkler • - �
Fire Alarm O s
Susp'd Ceiling
Roof
Other:
Final
PASS PART FAIL
PLUMBING �'-
Post & Beam ;i _ay
Under Slab
Rough -In
Water Service
Sanitary Sewer
Rain Drains
':a Basin Manhole
Storm grain
Shower Pan
Other:
Fier)
PART FAIL
CHANICAL
Post& Beam
Rough -In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough -In
UG/Slab
Low Voltage
Fire Alarm
Final n Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
PASS PART FAIL
SITE Please call for reinspection RE: 111 Unable to inspect — no access
Fire Supply Line
ADA
Approach /Sidewalk Date /I/fit Inspector Ext
Other:
Final DO NOT REMOVE this inspection record from the job site.
PASS PART FAIL