Correspondence . 6010 P S' ,d • January 15, 2009 . �� Mr. Kevin Shannon M I L L E A Shannon Construction C O N S U L T I N G 18335 NE West Union Rd, F N G I N F E R S Portland, Oregon 97229 Subject: Special Inspection Office Rebuild, Autumn Oaks Apts 11200 SW Grccnburg, Tigard, OR MCE Project Number: 080621 Date: January 15, 2009 Temperature: 49 degrees F Inspection: Anchors Dear Mr. Shannon: Miller Consulting Engineers provided special inspection of the epoxy anchor installation for the ten holdown anchor bolts per the alternate holdown to the structural drawings. The contractor placed (10) 5/8" threaded rods at the locations per plan. All the holes were drilled to proper depth, cleaned and blown out. The contractor discarded any epoxy not fully mixed at the start of each tube and used an adequate amount of epoxy in each hole. The expiration date of the epoxy was 9/30/10. The '6" x 8" Titan 11D shear anchors were also installed per the plans. The two holdowns that required the 3 /4" shim to attach to the double stud had 3 1/2" SDS screws instead of the 2 1/2" provided with the holdown bracket to engage both studs. The work was performed satisfactorily. Respectfully, Qp V` tor th Miller Consulting Engineers, Inc. stew m 4AY 23. 2e, Kenneth Safe, P.E. . S Principal p EXPIRES: 06 - 20/0 c: Building Official — City of Tigard 9570 SW Barber Blvd., Suite 100 Portland, Oregon 97219 -5412 Phone (503) 246-1250 Fax (503) 246 -1395 www.millerengrs.com American Consulting Engineers :ouncit •