FINAL SUMMARY LETTER
October 14, 2008
T0807197
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Winco Foods Store #23 — Addition
7501 Dartmouth Road — Tigard, OR
Permit No.: BUP2008 -00079
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
Installation of Cast in Place Anchors and Adhesive Anchors
Structural Masonry
Structural Welding- Shop & Field
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
teven W. L ach
Project Manager
SW L/rc
cc: Zipper Zeman Associates Inc — Andrea F Kuehnel PE
City of Tigard Building Division — Hap Watkins
Stapley Engineering — Greg Leishman
Bruce W Petersen Ncarb
ESI Construction - Richard Brien
4
October 20, 2008 r erracon
Consulting Engineers & Scientists
12400 SE Freeman Way, Suite 102
Portland, Oregon 97222
503 659.3281
WinCo Foods LLC Ph Fax 503.659.1287
650 North Armstrong Place www.terracon com
Boise, Idaho 83704
Attn: Mr. David Van Etten, Vice President
Re: WinCo Foods Store #23 — Building Addition
7501 Dartmouth Avenue
Tigard, Oregon
Terracon Project No. 82081002
Permit # BUP- 2008 -00079
Terracon Consultants, Inc. provided geotechnical observation during construction of the building
addition for the WinCo Foods Store addition project in Tigard, Oregon. A representative of
Terracon was on -site periodically to observe the construction. Our site observations have been
documented in daily field reports, and a brief summary follows. The geotechnical report was
prepared by Terracon Consultants, Inc. and dated May 11, 2005. The project plans prepared by
Bruce W. Peterson NCARB Architect (Sheet S1 dated March 7, 2008) reference the
geotechnical report recommended soil improvements below foundations.
Foundation Bearing Soil Observation and Testing
A Terracon representative was onsite to observe Geopier rammed aggregate piers constructed
at the site under Permit # BUP- 2008 - 00169. As documented in our field observation reports
and in our Summary Letter dated June 17, 2008, the geopiers appeared to be constructed in
general accordance with the project plans and the recommendations in the geotechnical report.
Foundation subgrades were observed and tested by a Terracon representative and consisted of
a combination of native silty clay soils or sandy gravel with clay fill. In our opinion, the bearing
soil we observed was prepared in general accordance with the project specifications and the
recommendations in the geotechnical report.
In addition to the foundation bearing subgrades, we observed and tested the grade beam and
floor slab subgrade areas. Limited areas that were observed to be loose or disturbed were re-
compacted by the contractor. Based on our observations, it is our opinion that the floor slab and
grade beam subgrade areas were prepared in general accordance with the project
specifications and the geotechnical report.
Delivering Success for Clients and Employees Since 1965
More Than 95 Offices Nationwide
WinCo Foods Store #23 1T!rr7COn
Tigard, Oregon
Project No. 82081002 /Permit #BUP- 2008 -00079
October 20, 2008
Structural Fill Observation and Testing
A Terracon representative was periodically on -site for observation and testing of backfill of
foundations, grade beams, foundation walls, and utility trenches. Structural fill materials placed
for floor slab base course materials were also observed and tested. Backfill materials within the
building pad generally consisted of the excavated silt or silty gravel fill. Fill was compacted with
one of the following: a smooth -drum vibratory roller; vibratory plate compactor; or a backhoe-
mounted compactor in limited access areas. The base course materials consisted of imported
crushed rock fill that was compacted using the similar methods as for backfill materials. Based
on our testing and observations, it is our opinion that the structural fill observed was placed and
compacted in general accordance with project specifications.
We trust this letter meets your current needs. Please do not hesitate to contact us should you
have any questions. �� co pR pFec,s
Sincerely, � 5 �N('IIV� iO�`
TERRACON CONSULT
-04, IN9.. . -7
0 - p r
. LOREGON ��p°�� /
' 14
Andrea F. Kuehnel, P.E. Q ` DER A A �. Kris opher T. Hauck, P.E.
Senior Engineer F. F. 10 Office Manager
Distribution: Addressee P.ii=WAi (WE: b
WinCo Foods --Jack Clo T Fd (1)
Stapley Engineers - Greg Leishman, PE
Bruce W. Peterson, NCARB - Lee Lizama, AIA
City of Tigard - Building Permits - Walter Bennett IV (1)
ESI Construction - Richard Brien (1)
ESI Construction - Mike Tsu (e -mail only)
2
OCT -14 -2008 TUE 04:45 PM CARLSON TESTING INC. FAX NO. 5036840954 P. 02/02
Mtn
dI3nS /06A g 10 SI. lie 63 OyRArvFJd1! PAanc Send Carlson Testing, Inc. ,6 >v<� F " � ,� ° „m ; 136
Construction Materials Testing & rns action v ,
Special Inspection
FINAL SUMMARY LETTER
October 14, 2008
T0807197
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Winco Foods Store #23 — Addition
7501 Dartmouth Road — Tigard, OR
Permit No.: BUP2008 -00079
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
Installation of Cast in Place Anchors and Adhesive Anchors
Structural Masonry
Structural Welding- Shop & Field
All inspections and tests were performed and reported according to the requirements of Protect Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
teven W. ach
Project Manager
SWL/rc
cc: Zipper Zeman Associates Inc — Andrea F Kuehnel PE
City of Tigard Building Division — Hap Watkins
Stapley Engineering — Greg Leishman
Bruce W Petersen Ncarb
ESI Construction — Richard Brien
OCT -14 -2008 TUE 04:45 PM CARLSON TESTING INC. . FAX NO. 5036840954 P. 01/02
•
CARLSON TESTING, INC.
Phone: 503 - 684-3460 /Fax 503 -684 -0954
PO Box 23814 Tigard, OR 97223
FAX TRANSMITTAL
To: City of Tigard
Attn: Building Department
Fax: 503 - 624-3681
From: Carlson Testing, Inc. — Rachel Cuteri
Date: October 14, 2008
Re: FINAL SUMMARY LETTER Total Pages: 2
This is the Final Summary Letter for:
Project: Win= Foods Store #23 - Addition
Permit # BUP2008 -00079
Please call if you have any questions. 503-684-3460.
Thank You,