Correspondence Inc. _ „fire Salem Offirr Bend Office
I ari,.7r ®n Testing estin� 30 . 8l30.11Vflwr-iAer 3060 /ludson ,l'r., , \'E Rinds Hi ull
1 8 1. OR 9i d'J .S'afrni. OR 97101 Reud, OH R 97702
Phony: (503)04-3490 1'hnrrr: 1501, 589 -1252 Phone /5!1/ 330 -9/55
For 1503, 684_0954 l rir: /503(539.1309 T r ('511(330.9163
Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER
November 6, 2008
T0807197.A
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Winco Foods Store #23 — Addition (Racking)
7501 Dartmouth Road — Tigard, OR
Permit No.: BUP2008 -00260
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Installation of Proprietary Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best - the work was conformance with the approved - plans - and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
even W. Leach
Project Manager
SWL/eah
cc: Zipper Zeman Associates Inc — Andrea F Kuehnel PE
Stapley Engineering — Greg Leishman
Bruce W Petersen NCARB
ESI Construction — Richard Brien