Loading...
Specifications it j p i a l `� "�', 1 SHREMSHOCK 'i 2010 AUG 1 Architects & Engineers 6130 S. Sunbury Rd. cm kir 'ti'" T!(, Westerville, OH 43081 BUILDING DIVISICP1 t 614 545 4550 888 373 4130 f 614 545 4555 www. shremshock.com REVISION DOCUMENT PROJECT BULLETIN No. 1 j 08/12/10 Express Washington Square Store #2049 9669 S.W. Washington Square Rd. Tigard, OR 97223 ARCH PROJECT No.: 10163.R01 To the Contractor: This bulletin, issued after the execution of the contract, describes proposed revisions of the contract documents and requests from contractor the amount of change, if any, in contract sum to accomplish the work described. It is assumed no change in contract time will be necessary unless contractor submits written request for time extension, including justification, with his proposal . for work described in this bulletin. Except, as otherwise described herein, or as shown on drawings issued with this, current contract documents apply to proposed work. This bulletin is not an order to do work. After receipt and review of the proposal requested, a change order will be issued toiauthorize execution of the work, or portion thereof, if the owner so directs. , REASON FOR REVISION: L & Building Department Comments Submit proposals for the change described herein on Contractor's letterhead. List each item individually as listed below. I I DRAWINGS INCLUDED WITH THIS BULLETIN: A00.0, A01.1, A02.1, A02.4, A03.1, A05.1, A06.1, A08.1, A08.2a, A08.2b,'' A10.1, A10.1 a, A10.4, A10.9, Al2.1, E02.1, E02.2, E04.3, E05.1 M03.1, and P02.1. I DRAWING REVISION PROPOSALS: All Sheets • Revised Address per Address Change per Landlord revising physical address. A00.0 Cover Sheet • Added Revision Information • Added Landlord Comments • Added Mall Operations Manager's Info. • Revised sheet name of sheet A10.1 in sheet index • Added sheet A10.1 a to sheet index A01.1 Demolition Plan • Added Landlord Comment Box Notes • Updated Keynote #22 • Added note to (E) demising wall for plenum air opening to remain open A02.1 Construction Floor Plan • Added notes and indicator markers for stud heights changing due to mezzanine and roof structure above changing within space and affected details • Added box note to refer to structural engineers drawings for storefront framing. • Revised extent of 6" stud wall behind "(5) Puck Focal Wall" A02.4 Framing Details • Revised details 'A', `,P, `L', & 'M' for seismic wall framing A03.1 Reflected Ceiling Plan • Added Building Department Comment Box Note for Suspended Ceiling System • Revised detail callouts for wall section on high roof side of denim room • Updated plan per changes to A02.1 A05.1 Floor & Wall Finish Plan • Added Landlord Comment Box Notes • Updated plan per changes to A02.1 'I. A06.1 Presentation & Fixture Plan • Updated plan per changes to A02.1 A08.1 Storefront Plan & Elevation • Added Landlord Comment Box Notes • Added seam detail callout for clarification A08.2a Storefront Sections & Details • Added Landlord Comment Box Note A08.2b Storefront Sections & Details • Added Landlord Comment Box Note A10.1 Denim Wall (Cabinet) Mezz. Fir. • Revised height of duplex outlet on elevation `B' (Master Update) • Revised details `A' & 'G' and section `H' for seismic wall framing • Revised sheet name A10.1a Denim Wall (Cabinet) High Roof • Sheet Added A10.4 Puck Focal Wall Details • Revised detail `E' for seismic wall framing A10.9 Cabinet Details • Sheet Replaced (Master Updates and Seismic Wall Framing) Al2.1 Partition Details • Added new details `D & `G' for seismic suspended ceiling system • Removed details `K' & `M' for seismic wall framing • Revised detail `L' for seismic wall framing 2 of 3 • E02.1 Electrical Power Plan ,I • Revised receptacle locations in cabinets E02.2 Electrical Power Plan 8 Coded Notes • Revised coded note 30 E04.3 Electrical Details • Added Landlord Comment Note E05.1 Electrical Panels and Riser Diagram • Added Landlord Comment Note • Revised breaker and wire sizes of FPVAV -1 -4 • Revised "Electrical Load Summary. M03.1 Mechanical Details u • Added landlord VAV detail • •P02.1 Plumbing Notes and Details • Added Landlord comment END OF REVISIONS INITIALS: JEB, SLH, RP ' . . 3 of 3 ��