Loading...
Correspondence Z. ` P HREMSHOCK AUG 7 20 10 _ rchilt;t;ls & Engineers P - ® 0130 S. Sunbury Rd. ! Y 1./f 0 1. �t�i tervillc, OH 43081 BUILDING DIVISION! t0145454550 888 373 4130 1 545 4555 ww shrcroshoc k.cum 08/12/2010 City of Tigard Permit Center Building 13125 SW Hall Blvd. Tigard, OR 97223 Attn: Dan Nelson; Senior Plans Examiner RE: Express Washington Square Store #2049 9669 SW Washington Square Rd. Tigard, OR 97223 Arch Project No.: #10163.R01 Dear Mr. Nelson, Itemized below are responses to the review comments for Building Permit # BUP2010- 00157, dated 08- 03 -10: The following correspond with the clouded revision #1 bubbles found on the drawings: Review Comments: Comment 1. Construction requirements for suspended ceiling systems are found in the Oregon Building Codes Division website under Statewide Code interpretations dated 4/20/2007. (see interpretations {structural} at www.bcd.oregon.gov) Response 1. Added a box note on A03.1 and details D & G on Al2.1 for suspended ceiling system seismic designs. Comment 2. Provide calculations and construction details (including seismic bracing details for non full height partitions) for all walls. Note: The roof structure may be • approximately 30' above the finished floor. OSSC 106.1. Response 2. Added notes and adjusted wall framing per different structure heights. Refer to A02.1 for clarification and additional list of details that were affected. See calculations under separate cover. Comment 3. Pease provide calculations and construction details for the soffits and storefront construction. Every structure, and portion thereof, including non structural components that are permanently attached to structures and their supports and attachments, shall be designed and constructed to resist the effects of earthquake motions in accordance with ASCE 7 as modified by Section 1613.7. The seismic design category for a structure is permitted to be determined in accordance with Section 1613 or ASCE 7. OSSC 1613.1. Response 3. See calculations under separate cover. Refer to revised Architectural sheets for framing & bracing per Structural Engineers direction, see sheets A02.1, A02.4, A10.1, A10.1a, A10.4, A10.9, and Al2.1. Comment 4. Please submit plans and calculations for steel storage racks that comply with the design requirements of ASCE 7 (15.5.3). i"xa ' w P • Response 4. Storage rack plans and calculations to be submitted under separate cover. Comment 5. Please provide a permit valuation based on the total work being performed Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment, flooring, ceilings and any fixture attached to the building. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. Response 5. The estimated construction cost of construction is $650,000. Th nk , J' ,•.' / Ja ob E. Brown / Shremshock Architects, Inc. • • • • • •