Loading...
Correspondence (572) From: 09/10/2007 13:29 #011 P.002/002 • AA] Edit= asselats, int Zcub —062-4/1— i � ENGINEERING • September 10, 2007 MEWED Dan. Vasquez S EP 1 0 l!11 Mildren Design Group, P.C. 7650 SW Beveland Street, Suite 120 CITY OF I Writ) Portland, OR 97223 BUILDING DIVISION RE: Tigard Triangle Commons Buildings No.: 1,2 and 3 Permit No.: BP2006 00206 Copy BP 2006 00207 11850 SW 67"' Avenue, Tigard, OR AAI Project No.: A05224.01, A05224.02 and A05224.03 " Dear pan: in accordance with the 2003 International Building Code and the 2004 OSSC requirements, representatives of AAI Engineering performed structural observations • for the Tigard Triangle Commons Buildings No. 1, 2, and 3 as outlined In the project . construction documents. A final compliance walk through was performed on August 1, 2007 at which time no non-compliant issues were observed. We have also reviewed inspection reports by ACS Testing Inc. of Tigard, OR and structural shop. drawings as submitted by the contractor. Based on the final reports for Tigard Triangle Buildings 1, 2 and 3, dated September 5, 2007, provided by ACS Testing and our final observation, it is our opinion that the construction of the subject projects is generally In accordance with the structural plans and specifications. If there are any questions, please do not hesitate to call. Sincerely, Chemelle Stark, EIT Structural Designer CC: Paul Gram/Tom Stem — Pacific NW Properties Randy Peterson — P &C Construction • 4875 SW Griffith Drive I Suite 300 I Beaverton, OR 1 97005 . 503.620.30301 Eel 503.620.55391 f a x w w w. a a i e n g. c o m •