Loading...
Correspondence From 09/07/2007 15:44 #010 P.010 /011 trot v'V Luu t un:4L raa %Amul/AJ1' Ij uu4 r te 5/ ` cPCIC) 600 0-C. G EO ESIGNz OFFICE COPY �, �� September 4, 2007 E W • 0 L007 crry Of Pacific Northwest Properties B hLOING D9i6! S%ON P.O. Box 2Z06 Beaverton, OR 97075 • Attention: Mr. Paul Cram • Letter of Compliance Geotechnical Engineering Construction • Tigard Triangle Commons, Building 3 Southeast Corner of SW 67 Avenue and SW Clinton Street Tigard, Oregon GeoDesign Project PNWP -30-05 Permit No. SIT-2006-00006 • This letter provides CeoDesign, Ines summary comments on the geotechnical construction observation services completed for Building 3 at the Tigard Triangle Commons project in Tigard, Oregon. We previously performed a geotechnical evaluation of the site Our study was performed in two phases, with the results provided in our September Z8, Z001' and July 19, 2005 reports. GeoDesign observed the mass grading operations, which included site cuts and fills_ We observed all foundation subgrades prior to concrete placement Crushed rock material for utility trench and retaining wall back were evaluated by completing in -place density testing. Members of our geotechnical staff observed geotechnical- related tasks identified above on a part- - time and on -call basis: The results of our site visits were summarized in daily field reports, which have been provided to the design /construction team members. Areas where test results Indicated inadequate relative compaction were reworked and re- compacted until the specified compaction was achieved. Within the limits of work observed and reported during the requested site visits, the above - referenced tasks were completed in general accordance with the plans and specifications and the geotechnical recommendations. GeoOadmicof &gingering Services, 13rudford Office Building, 7 Egon, dated September 28, 2001. CeoDesign Project PNWP -30-01 ! Report pf CreCad nica! Engineering Services, 77gard Triangle Commons, Tigard, Oregon, dated July 19.2005, CeaDesrgn Project PNWP -30.02 h:c-os Vr pksiy-su3e ISO: I P6n'elsni]. Cx 9772 - i dffS03969.87SY F rex 5D3955.*1,1 From: 09/07/2007 15:45 ,#010 P.011/011 1- 09/04/2007 09:43 FAX GEODESIGN VI 005 • We appreciate the opportunity to work with you on this project. Please call if you have questions concerning the information provided. Sincerely, GeoDesign, Inc 4 s A F� . it 16 ; act42/4 11310 4 0 _ 1? Scott P. M. - ". P.E Project ne sr r s �'��• P lliz�' • �� DOS: L 11 �� George dens, P.E., G.E Principal Engineer cc Mr. Randy Peterson, P&C Construction Ma fax only SRA:GP5Am Two copies submitted Document 1D: PIONP- 30.05- 090407- BW3-geoioc,doc ® 2007 GeoDesign, Inc An rights reserved. • ®ESIGM 2 PMWP- 30-05:090407