RE: TRIANGLE COMMONS BUILDING ONE - NEW BUILDING - REVIEW
Project Information
Building Permit BUP2006 -00206 Construction Type: III-B
Tenant Name: Pacific Northwest Property Occupancy Type: B
Address: 11850 SW 67 Ave. Occupant Load: 487 ( +/ )
Area 48,667 sq ft Stories: 2
The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition
and 2004 Oregon Fire Code as amended by TVF&R. The submitted plans are approved subject to the
following conditions.
SITE (received 6/5/06)
1. Our files show no site permit was issued. Please submit site plan with permit application along with
valuation of site work. Complete form to show all impervious area, excavation, grading and fill
volumes. Please complete both sides of the form. Forms attached.
2. Provide attached TVF&R form with permit
STRUCTURAL
3. The structural review was completed by Miller Consulting. The plan review #1 dated June 1, 2006, was
E- Mailed to Mildren Design Group for response (review doc. attached).
FIRE LIFE AND SAFETY / GENERAL
4. Suspended ceiling not listed as deferred submittal, please provide design per ch 16 OSSC.
5. Egress path and occupant load 1004, 1013, 1014 (The construction documents shall show in sufficient detail the
location, construction, site and character of all portions of the means of egress in compliance with the jrnvisions of this code.
The construction documents shall designate the number of occupants to be accommodated on very floor, and in all moms
and spaces OSSC 106.1.2)
6. Provide roof assembly design information showing roofing meets performance requirements per
OSSC 1504, chapter 16 and OSSC 2603.
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
7. Provide locations/information on overflow drains or scuppers being used as required by OSSC 1504.
8. Provide lateral load design information.on exterior glazing per OSSC 2404.
9. Fire protection systems (1016.1.1.1 Fire protection system shop drawings. Shop drawings for the fire
protection ystem(s) shall be submitted to indelicate conformance with this code and the construction documents and shall be
*proved to the start of rystem installation. Shop drawings shall contain all information as required by the referenced
installation standards in Chapter 9.)
10. Fire resistive rated structural member locations and assembly 714, 715
11. Deferred submittals such as Truss Joist Shop Drawings, TJI floor joist, Acoustical ceiling suspension
system, Fire stopping, Intercom system, Specialty retaining walls, etc, will be charged a deferred
submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall
be $200.00. This fee is in addition to the project plan review fee based on the total project value. OAR
918 - 050 -0150
`Documents ford deferred submittal items shall be submitted to the registered deign profess ional in responsible charge who shall review
them and forward them to the building ofidal with a notation indicating that the deferred submittal documents bate been mined and
been found to be in general conformance to the design of the bra& ding. The deferred submittal items shall not be installed until the design
and submittal documents hate been dpp wed by the building oidal Oregon Structural Specialty Code Section 1063.42"
Deferred Items: As noted on sheet A0.1
*Steel joist * Joist girders *Steel stairs
*Component anchorage * Block retaining wall
(electrical /mechanical)
NOT PART OF THIS REVIEW:
*Mechanical (HVAC) *Pluming *Fire sprinkler *Electrical *Fire alarm *Low voltage
Please provide an item by item response.
When submitting revised drawings or additional information, please attach a copy of the enclosed City of
Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and
processing the documents.
Respectfully,