Correspondence (407) ✓ 6,2006' ° 607 August 28, 2006 gP CO CITY OF TIG OREGON Mildren Design Group, PC Dan Vasquez 1650 SW 105 Ave, Suite 175 r �. n Tigard, OR 97223 f( RE: TRIANGLE COMMONS BUILDING ONE - NEW BUILDING - RE VIEW r .. Project Information $:'''<.-,: , 7 . Building Permit BUP2006 -00206 Construction Type : \( III B Tenant Name: Pacific Northwest Property Occupanry , '‘ Address: 11850 SW 67t Ave. Oc r t Load: ) 487 Area: 7 48,667 sq ft Stones• `�. 2 The plan review was performed under the State of Oregon Structural Spec Code (OSSC) 2004 edition and 2004 Oregon Fire Code as amended by TVF&R. The'subiitted plans are approved subject to the following conditions. s';,- . 1. The structural review was approved by Miller-;Consultmg Engineers August 25, 2006. (review doc. attached). , 2. Special inspection is required for ciga ere w reinforcing stee4 bolting, welded studs, embed plates, bolts in concrete masonry, sor7s, structural steel fabrication and erection, adhesive and expansion anchor installation, (as items listed on sheet A0.1 and Miller Consulting Engineers approved review letter)_The special inspection agency of record shall furnish inspection reports to the Engineer of Record;�`Afghan Associates, the General Contractor, and the City of Tigard, Building Division, attention Hap Watkins. All discrepancies shall be brought to the immediate attention of the generar on for correction. The special inspector shall submit a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance with the approved plans and specifications and the applicable workmanship provisions. Of the co'de.1704, 1705, 1707, 1708 OSSC 3. Structural Observations is required per section 1709 Oregon Structural Specialty Code (OSSC). The.owner shall employ a registered design professional to perform structural observations as defined in Sectior OSSC. Structural observations is required for concrete foundation, retaining walls'reinforcing, reinforcing steel in tilt -up panels, before concrete placement at second floor, placement of floor joist and girders, and roof deck welding (as items listed on Miller Consulting Engineers approved review letter). Deficiencies shall be reported in writing to the owner and to the City of Tigard, Building Division, attention Hap Watkins. FYI The structural observations do not waive the framing inspection required by code. 4. Live Loads Posted: The live loads for which each floor has been designed to exceed 50 psf shall 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 be conspicuously posted by the owner in that part of each story in which they apply, using durable metal signs, and it shall be unlawful to remove or deface such notices. The occupant of the building shall be responsible for keeping the actual load below the allowable limits. 1603.3 OSSC FIRE LIFE AND SAFETY / GENERAL 5. The main exterior door or doors are permitted to be equipped with key- operated locking devices from the egress side provided: 1. The locking device is readily distinguishable as locked, A 2. A readily visible durable sign is posted on the egress side on or adjacent to the door: stating. THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING=IS<OCCUPIED. The sign shall be in letters 1 inch (25 mm) high on a contrasting background._ Sec. 10081.8.3 6. All exit doors shall be openable from the inside without the use of a key or any4ecsal knowledge or effort Sec. 1008.1.8 y i f 7. Exits and exit access doors shall be marked by an approved exit•signn readily :visible from any direction of egress travel. Access to exits shall be marked by readily-visible exit signs in cases where the exit or the path of egress travel is not immediately visible tg.-the occupants. Sec. 1011.1 8. Exit signs shall be illuminated at all times and shal�-be.provn led with a second source of power that will provide 1 1/2 hours of illumination in case'of pnmary loss. Sec. 1006.3 FYI aty Additional exit signs may be required by the, field`inspector to clearly indicate the path of egress. • » 4 ' t t� � )" j 9. The means of egress shall be provided vithAumination of not less than 1 foot candle at the floor level anytime the building is occupied.':Tbe means of egress illumination shall be provided with a second source of power in case of primaryrpower loss. Sec. 1006.2 10. All elevators, required or provided, shall be located on an accessible route and shall be designed and constructed to comply with 30 and the Oregon Elevator Specialty Code. 1108.3.2 OSSC 11. Floor drains shall rot be.located within the clear floor space at a lavatory, water closet, urinal, or bathtub oc shower Floors shall not slope in excess of 1 unit vertical in 50 units horizontal (2 % slope). Floor drains shall comply with Section 1109.4.5 and be without abrupt changes of level. Exception: Floor drains be located within a clear floor space at a fixtwr pmvided the openings in the drain corner shall not exceed % inch (12.7 mm) in any direction and the drain cover shall be no more than 118 inch below the level of the surrounding - f niched floor surface. 1109.10.1 OSSC 12. Safety glazing including but not limited to: the following locations: Each unit of glazing shall be permanently identified by the manufacturer. Sec. 2406. Some of these locations are as follows: a. Glazing in ingress and means of egress doors. b. Glazing in an individual fixed or operable panel adjacent to a door where the nearest vertical edge is within a 24" arc of the door in a closed position and whose bottom edge is less than • t; 60" above the floor or walking surface except when there is an intervening wall or other permanent barrier between the door and the glazing. 13. Deferred Items: As noted on Miller Consulting Structural review document dated 8/8/06 & sheet A0.1 * Steel open web joist and girders * Steel decking *Steel stairs *Component anchorage * Calculations & details for canopy * Calculations & details for glazed storefront system The minimum fee shall be $200.00. This fee is in addition to the project plan review fee,bas d th`e total project value. OAR 918-050-0150 `Documents for deferred submittal items shall be submitted to the registered design pmfessional'inr� ii _ sir i e who shall review them and fonvanl them to the bui /ding official with a notation indicating that the d f6`irr d submittal documentr have been reviewed and been found to be in general conformance to the design /&iildi g The defend submittal items shall not be installed until the design and submittal documents have been #a the building official Oregon Structural Specialty Code Section 1063.4.2" 0 (electdca1 /methanua0 NOT PART OF THIS REVIEW:. * Electrical * Fire Sprinklers * Mec System.,( * Plumbing A ti American with Disabilities Act (ADA): It shall be ihe;tesponsibility of the Architect, Engineer, Designer, Contractor, Owner and Lessee to researchtlie app$cabty of the ADA requirements for the structure. The City of Tigard reviews the plans and;ii pects the,structure only for compliance with Chapter 11 of the OSSC, which may not include'all of the,requ ements of the ADA. Approved Plans: 1 set of approved plans; bearing e,City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available tp the,Building Division inspectors throughout all phases of construction. 106.3.1 OSSC Certificate of Occupancy: No' budding or structure shall be used or occupied until the Building Official has issued a certificate of occupancy OSSC Premises Identification: Approved numbers or addresses shall be provided for all new buildings in such a position as to be•,plainly visible nd legible from the street or road fronting the property. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. ii Respe soy, 17/t/ Val Henzel, Senior Plans Examiner