Loading...
Correspondence (507) / /ii ✓il flYa 'i \ August 7, 2006 1' review, June 8, 2006 CITY OF TIGARD ORE GON Mildren Design Group, PC Dan Vasquez 1650 SW Beveland St #120 Tigard, OR 97223 RE: OPEN PARKING GARAGE — NEW BUILDING REVIEW Project Information Building Permit: BUP2006 -00207 Construction Type: II -B Tenant Name: Pacific Northwest Property Occupancy Type: S-2 Address: 11850 SW 67 Ave. Occupant Load: 248 Area 49,419 sq ft Stories: 2 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition and 2004 Oregon Fire Code as amended by TVF&R. The following information is required in order to complete the review. STRUCTURAL 1. The structural review was completed by Miller Consulting. The plan review #1 dated June 1,2006, was E -Mailed to Mildren Design Group for response (review doc. attached). ** RESPONSE SENT TO MILLER 7/27/06 FIRE LIFE AND SAFETY / GENERAL 2. Provide information on location of stand pipe. OSSC 905.5.1.2 (406.3.9) & (106.1.1.1) RESPONSE ACCEPTED 8/7/06 3. Provide clarification on fire resistive rated structural member locations and assembly. OSSC Table 602, 704 RESPONSE ACCEPTED 8/7/06 4. Provide clarification on exit stairway being 44" minimum. OSSC 406.3.8, 1009 RESPONSE ACCEPTED 8/7/06 5. Provide clarification on height of building. OSSC 106 RESPONSE ACCEPTED 8/7/06 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 • 6. Provide clarification on location of vehicle barriers. OSSC 406.2.4 RESPONSE ACCEPTED 8/7/06 7. Deferred submittals such as Truss Joist Shop Drawings, TJI floor joist, Acoustical ceiling suspension system, Fire stopping, Intercom system, Specialty retaining walls, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. This fee is in addition to the project plan review fee based on the total project value. OAR 918 - 050-0150 `Documents for deferred submittal items shall be submitted to the registered design professional trrponsible charge who shall t tiew them andfonrrard them to the building offidal with a notation indicating that the deferrrd submittal documents bate been trviewed and been found to be in general corrformrance to the design of the bulling. The deferred submittal items shall not be installed until the design and submittal documents have been approtrd by the building Odd Oregon Structural Special* Code Section 106.3.4.2" Deferred Items: As noted on sheet A0.1 *Steel stairs • NOT PART OF THIS REVIEW: *Mechanical (HVAC) *Pluming *Fire sprinkler *Electrical *Fire alarm *Low voltage NOTE: **Provide 2 complete sets of plans when structural review is approved by Miller Consulting. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectful al Henze Senior Plans Examiner