Loading...
Correspondence (154) Blank 5 I'f .2o0( b ° °d(° � c),.\b\‘ Page 1 of Return -Path: <KKoroch @tmrippey.com> , Content- class: urn:content - classes:message /10 Subject: Tigard Triangle Buildings One and Two Ef Disposition- Notification -To: "Karl Koroch" <KKoroch @tmrippey. • > Date: Mon, 19 Jun 2006 08:56:42 -0700 Jul 2 7uu6 Thread - Topic: Tigard Triangle Buildings One and Two Thread - Index: AcaTuL0x9tIGgmHITHGtG2ShsVn1UA __ 4' CITY O+ TiGAJ From "Karl Koroch" <KKoroch @tmrippey.com> �,� �, v „% � BUILDING DIVISION To: <john.dalby @tvfr.com >, ` Cc: "Dan Vasquez” <dan @mdgpc.com> ® VVIC �+, ®� John, thank you for meeting with Dan and I last week. Below I have summarized the main points of our discussion: 1. The existing public hydrants hydrants are acceptable to serve the building and parking structure. The hydrants within 600 feet of the buildings are located at the northeast comer of Clinton and 68th, at the southwest comer of Clinton and 67th, approximately 200 feet north on the east side of 67th, at the southeast corner of Baylor and 67th, and on both sides of 68th at Baylor. 2. Apparatus access to Building One and to the parking structure (Building Two) are acceptable. 3. A dry stand pipe system is required for the parking structure. Ports are to be placed near the northwest and southeast corners of the structures. 4. Both the building FDC and the parking FDC are to be located near the existing public hydrant on the south side of Clinton at 67th. Each FDC is to have "Auto Sprinkler" cast into the top of the fitting for Building One and "Standpipe" cast into the top of the fitting for the parking structure. Please let me know if I have missed or incorrectly stated anything. A .pdf of the site utility plan we looked at, the fire flow work sheets, and the results of the hydrant flows from 1999 and 2001 are attached. Thank you again for your help. Karl