Loading...
Correspondence (151) July 26, 2006 Val Henzel, Senior Plans Examiner �� �,� t , City of Tigard I V i 13125 SW Hall Blvd. JUL 2 Tigard, OR 97223 2006 CITY OF TIGARD BUILDING DIVISION Re: Checklist Response Letter Triangle Commons - Site Review (Buildings One and Two) Permit #: S1T2006 -00006 Dear Ms. Henzel, This letter is in response to your Permit Review Comments Letter (dated June 13, 2006) for the above - referenced project. The following items have been addressed in the revised drawing submittals (dated July 21, 2006) and have been itemized in this letter below - responses are in italics. GENERAL 1 . Provide geotechnical report .. . Geotechnical report is attached. 2. Sheet C2.0 shows fire hydrant/sprinkler vault located on private property check with TWD for location requirements on private property. Design is per Tualatin Valley Water District standards. RETAINING WALLS 3. Provide location of all retaining walls on site along with design and construction if wall is not a deferred submittal. Retaining walls not identified as deferred (see Site Plan, sheet A1.1) have been incorporated into the Building One permit set of documents- please refer to this set of drawings for additional information. New drawings include: A1.2.3, A1.2.4, A1.4, S7.1, S7.2 and S7.3 (and structural calculations). 4. Drainage f o r retaining walls shall be shown on the plans .. . Drainage piping has been provided - see Building One set sheets C3.0, A1.2.3 and A4.1. Triangle Commons - Site Review (Buildings One and Two) Review Comments Letter Response P:\ 101I00. 01\ wp\ LTR _COTsite- checksheetresponse.wpd Page 2 FIRE REVIEW 5. The submitted hydrant work sheet shows a number of hydrants required ... where are the remaining four hydrants located. See the attached email regarding the design team meeting with John Dalby, Deputy Fire Marshal. Per our meeting, the existing two hydrants are acceptable (see email item #1). 6. Provide standpipe layout for the parking structure. See locations of dry standpipes in Building Two set sheets PA2.1.1 and PA2.1.2 (locations were reviewed and deemed acceptable during the meeting with John Dalby - see email item #3). ( 7. Underground Fire Fighting Water Supply ... � � \JC Sprinkler configuration is a design build item - coordination and detailing will be provided at the time of the deferred submittal. ACCESSIBILITY 8. Provide site accessibility information as required per section 1103 and 1104. See Building One sheets A1.1 and C2.0 for exterior routes of travel meeting OSSC section 1103. Accessible parking areas (surface parking to the north of Building One) have been designed in accordance with OSSC section 1104 - see details on sheet A1.3 for additional accessible parking information. 9. Deferred submittals such as Truss Joist Shop Drawings, TJI floor joists, Acoustical ceiling suspension system, Fire stopping, Intercom system, Specialty retaining walls, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. This fee is in addition to the project plan review fee based on the total project value. OAR 918- 050 -0150 "Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building. The deferred submittal items shall not ve installed until the design and submittal documents have been approved by the building official. Oregon Structural Specialty Code Section 106.3.4.2" Triangle Commons - Site Review (Buildings One and Two) Review Comments Letter Response P: 101100.01 \ wp \LTR _COT - site- checksheetresponse.wpd Page 3 Deferred Items: As noted on sheet PA0.1 *Block retaining wall End of Review Comments Please do not hesitate to contact me with any comments or questions. Cordially, •. Dan Vasquez Project Manager DAV /dav Attachments: • Revised set of drawings (full sets, Building One and Building Two) • Geotechnical Report • John Dalby email dated June 19, 2006 (1 page)