Report (543) 11/07/2006 TUE 16:23 FAX ACS TESTING, INC TIGARD, 0001 /001 r 6 % � '� ' / — C/0 7409 SW Tech Center Dr. Ste. 145 nrn Tigard, OR 97223 Ph: 503 -443 -3799 Fax: 503-620-2748 rtsrtw. nr 3 ECEIVED NOV 0 r 2006 CITY Of Ti A BUNDNO DIVISION SPECIAL INSPECTION FINAL REPORT DATE: November 1, 2001 PROJECT: Joe Green Office ADDRESS: 11565 SW 67 CiP CITY: Tigard STATE: Oregon To Whom It May Concern: ACS Testing, Inc. attests that testing of Reinforced Concrete for footings was performed to the best of our knowledge on the above referenced project, in accordance with approved plans, specifications, RFI's and the applicable codes and standards of section 1701 of the Oregon State Structural Specialty Code. Approved by: 1 1 Bob Br. n President 14 -2001 20:24 P.01 � DAILY FIELD REPORT # 2001-00061 230.006.c REDMOND & TES OHM P.O. BOX 301063 • t 13 2 731) 0 P OT P . ac ri OREGON 072 4 • man= Tel: ( 780.1010 Green Office Rl� MX: (809) 1110-1372 R `Mgt eport # 1 SW 67th, Tigard, OR CRAM TO Joe Green 0001"RACOR Y 80's MOW ORTS Joe Green Jr. THE FOLLONNNG WAS NOTED: As requested, arrived on-site this afternoon to meet with the builder and check the condition of the exposed foundation bearing surfaces for the proposed new office building. observations made at this timr revealed that the exposed foundation bearing surfaces consisted of stiff native clayey silt soils of suitable bearing. However, some basalt r c boulders were observed near the NE corner of the pad within the perimeter footing lines. Foundation contractor stated that the footing could still be fanned to the approved plans dimensions with all required steel even with the rock exposed. As such, found no reason the jackhammer the basalt from the grade as adequate bearing support was present. Contractor plans to pour'footings later this week. Following footing and wall construction, structural fills will be placed and compacted for support of the concrete floor slabs. • Yo City, Architect, Engineer SQNED Daniel Redmond TOTAL P.01