Report (545) ;i 4: FILE COPY DAII.Y FIELD REPOR T AUG 1 7 2001 z -- BUP # 2001 -00061 REDMOND & ASSOCIATES DATE JOB NO. P.O. BOX 301545 August 13, 2001 230.006.0 PORTLAND, OREGON 97294 PROJECT Tel: (503) 760 -1060 Green Office Bldg FAX: (503) 760 -1372 /� `4. 15 SW 67th, Tigard, OR Report # 1 1 /6'6 ./ _.. •R OWNER TO Joe Green suu n Y TEMP. 80 s PRESENT € SITE Joe Green Jr. THE FOLLOWING WAS NOTED: As requested, arrived on -site this afternoon to meet with the builder and check the condition of the exposed foundation bearing surfaces for the proposed new office building. Observations made at this timr revealed that the exposed foundation bearing surfaces consisted of stiff native clayey silt soils of suitable bearing. However, some basalt bedrock boulders were observed near the NE corner of the pad within the perimeter footing lines. Foundation contractor stated that the footing could still be formed to the approved plans dimensions with all required steel even with the rock exposed. As such, found no reason the jackhammer the basalt from the grade as adequate bearing support was present. Contractor plans to pour footings later this week. Following footing and wall construction, structural fills will be placed and compacted for support of the concrete floor slabs. • COPIES TO: City, Architect, Engineer SIGNED Daniel Redmond