Loading...
Correspondence (134) I11I1Il 000C( ANKROM MOISAN ASSOCIATED ARCHITECTS October 25, 2002 Mr. Gary Lampella, Building Official City of Tigard 13125 SW Hall Blvd Tigard Oregon 97223 Re: Green Office Building Dear Mr. Lampella: Pursuant to Section 104.8 of the OSSC, we request approval of the design methods described in the attached drawings and below as alternative to and equivalent to the following: 1. Section 1004.2.4, and 1005.2.1, requires the exit accesses to be separated by 1 the length of the overall diagonal of the area being served. The overall diagonal distance of the building is 114'. The present separation between exit enclosure accesses is 32.5' on all floors. We request the distance of separation of exits be as permitted by the IBC, Section 1004.2.2.1 Exception 2, which allows 1/3 the diagonal distance between exits, in lieu of the UBC standard. The distance of 1/3 the building diagonal is to be achieved by constructing an Exit Passageway at the north end of the Hall, on the Second and Third Floors adjacent to the, tenant spaces. This permits direct access to the Stair Enclosure through the passageway from two of the tenant spaces. Doors, located at the north end of the existing Halls, will be pairs of doors held open with magnetic holders. They will release by activation of smoke detectors located in the Halls or the Exit Passageways and closed by automatic closers. The first floor exit access separation will be met by constructing an exit passageway as described in item 2. 2. Section 1005.3.3.3 States that exit enclosures (stairs) shall exit directly to the exterior or shall include and exit enclosure on the ground floor from the enclosure to the exterior. Only one of the two stairs need exit through an exit passageway since 50% of the occupants may exit through a ground level lobby. 6720 s.w. Macadam, Suite too, Portland, Oregon 97219, 503/245 -7100, FAX 503/245 -7710 Principals: Stewart Ankrom, Thomas Moisan, David Vonada, Lorraine Kellow, Jeff Hamilton, Karen Bowery, Chris Dalengas, Jeff Los, Phil Marquis Mr. Gary Lampella 10/25/02 Page 2 The building is presently designed and constructed without an exit passageway from the stairs to the exterior. To correct this code deviation construction of an Exit Passageway is proposed at the north half of the Gallery on the first floor. Doors, located approximately at the center of the building, into this passageway will be listed with a 60- minute fire and S rating. 3. Section 1005.3.4.4 requires openings into exit passageways be limited to those necessary for egress from normally occupied spaces and for egress from the passageway. The restrooms on the first floor enter onto the proposed Exit Passageway. As an alternative to the requirement of 1005.3.4.4, these rooms will be protected by two- hour fire rated wall construction of 2x4 wood studs at 16" O.C. covered with two layers of type X gypsum board (GA File No. WP 4136) and a floor ceiling assembly of T & G sheathing over TJI joists and 5/8" gypsum board ceiling supported by resilient channels (NER -200 ASSEMBLY E -7 and the doors will be 90- minute fire and S rated. (See attached NER Assembly Data Sheet). 4. Section 1004.3.3.5 does not require Elevator openings into Hallways to be provided with Elevator Lobbies. No smoke protection is proposed for the elevators, since it opens onto a Hallway at each floor. The circulation spaces between tenant spaces are halls, since the occupant load is less than 100, and a Corridor is not required. As an additional protective measure, the building is to be protected by an automatic sprinkler system, not otherwise required by code. This measure further adds to the equivalency of the above proposed alternatives. The building is Type V One -Hour, wood frame, steel structure with brick veneer.. The one -hour construction is being used to construct three stories. The Occupancy Group is B, Professional Office. The building area is 14,256 SF, which is far below the allowable area for this building type and protection. Smoke detection is proposed only for automatic door release and alarm annunciation only as required by NFPA for fire sprinklers. Mr. Gary Lampella 10/25/02 Page 3 Enclosed is drawing A2.1 (4 copies) and NEC -200 Assembly data sheet. Gary, thank you and Daryl Jones for working with us to achieve solutions to the code issues stated above. We are all working for economical solutions to provide a safe code compliant building. If you have any further comments, questions, concerns or suggestions, please call me at 503- 977 -5227. Sincerel , A %'i M MO AN ASSOCIATED ARCHITECTS ' • A. Supern a Consulting Architect Encl C Joe Green Mark Hoyt K: \Green Office Admin\Appeal Letter (/ October 9, o i-jA Greg Lampella 1 City of Tigard Via fax (503) 624 -0752 13125 SW Hall Blvd. and First Class Mail Tigard, OR 97223 ) Mark C. Hoyt RE: Green Office Building Attorney at Law Dear Greg: I write to follow the last portion of our conversation during today's site visit. At that time, I provided you a stamped detail from Ankrum Moisan Associated Architects showing a detail which deleted the sheetrock from the exterior of the building. The deletion of the sheetrock was based upon the fact that the bricks would provide the necessary four inch thick 75% solid material to provide the required one hour firewall. Because the bricks provide the firewall, the sheetrock was not necessary. You reviewed the documentation and materials on -site, and indicated you wished to do some research back at the office, but would let both Mr. Green, and I, know today as to whether the revised plan would be acceptable. As we discussed on site, it is essential that we know whether the sheetrock can be deleted today. As the building currently sits, enough sheetrock is installed on the building to allow the crews to continue to work through the end of today. Starting tomorrow, however, they will reach portions of the building where sheetrock has not been installed. Accordingly, if the addendum is not approved, additional materials and work will have to be performed, which could be unnecessary. Therefore, it essential we know as soon as possible. If there is any further information 1 can provide you to help you evaluate this matter, please let me know. If you have any questions regarding this matter, please feel free to contact me at your convenience. ours t . 1 475 Cottage St. N.E., ; � �� ��' Suite 120 ; Salem, Oregon 97301 i� , Phone: 503- 364 -3302 Mark C. Hoyt Fax: 503- 370 -4308 E -mail: MCH:vmp hoyt @hoytlaw.net cc: Joe Green 10/04/2002 11:10 503 -- 525 - -9266 DL ENGINEERING PAGE 02 October 2, 2002 DESIGN, INC. Mr. Hap Watkins City of Tigard Building Department 13125 SW HaII Blvd. Tigard, Oregon 97223 Re: Green Office Park This letter is to certify that DL Design, Inc. is the engineering firm of record for this project. Gary Darling, Vice President, is the designated project manager. Sincerely, ' 7 4Z DL Design, c. • 9045 SW Barbur Boulevard, Suire 101 • Porrland, Or 97219 • Phone: 503.225.1679 • Fax: 503.525.9266 10/30/02 WED 14:55 FAX 5036243681 CITY OF TIGARD BLDG DEPT LQJ001 *** TX REPORT *** TRANSMISSION OK TX /RX NO 0039 CONNECTION TEL 5032457710 CONNECTION ID ST. TIME 10/30 14:53 USAGE T 01'29 PGS. SENT 5 RESULT OK FAX TRANSMITTAL ANN Date October 30, 2002 Number of pages including cover sheet 5 To: Roger From: Gary Lampella Co: Ankrom Moisan Co: City of Tigard Fax #: 03) 245 -7710 Fax #: (503) 684 -7297 Ph #: (503) 639 -4171, Ext. 2448 Roser I received a letter from Ba and Mentrum on 10/22/01 and called him that da . Sent a letter to Joe Green on 10/23/01 and received res • onse on 12/11/02 identi in • Gary Darling as the engineer of record. Received another letter on 10/4/02 saving DL Design, Inc. is the engineering firm of record. As ou can see from m letter I was • rett clear on what the res • onsibilities of the architect or engineer of record are. We still need to iron out the issue of Mentrum Architecture's stamped drawings and whom is realy responsible. • SUBJECT: October 9, 2002 Greg Lampella City of Tigard Via fax (503) 624 -0752 13125 SW Hall Blvd. and First Class Mail Tigard, OR 97223 Mark C. Hoyt RE: Green Office Building Attorney at Law Dear Greg: I write to follow the last portion of our conversation during today's site visit. At that time, I provided you a stamped detail from Ankrum Moisan Associated Architects showing a detail which deleted the sheetrock from the exterior of the building. The deletion of the sheetrock was based upon the fact that the bricks would provide the necessary four inch thick 75% solid material to provide the required one hour firewall. Because the bricks provide the firewall, the sheetrock was not necessary. You reviewed the documentation and materials on -site, and indicated you wished to do some research back at the office, but would let both Mr. Green, and I, know today as to whether the revised plan would be acceptable. As we discussed on site, it is essential that we know whether the sheetrock can be deleted today. As the building currently sits, enough sheetrock is installed on the building to allow the crews to continue to work through the end of today. Starting tomorrow, however, they will reach portions of the building where sheetrock has not been installed. Accordingly, if the addendum is not approved, additional materials and work will have to be performed, which could be unnecessary. Therefore, it essential we know as soon as possible. If there is any further information I can provide you to help you evaluate this matter, please let me know. If you have any questions regarding this m atter, please feel free to contact me at your convenience. /I' ours t . 1 475 Cottage St. N.E., Suite 120 Salem, Oregon 97301 Phone: 503- 364 -3302 /i Mark C. Hoyt Fax: 503- 370 -4308 E -mail: MCH:vmp hoyt @hoytlaw.net cc: Joe Green • 10/04/2002 11:10 503 -- 525 - -9266 DL ENGINEERING PAGE 02 October 2, 2002 DESIGN, INC. Mr. Hap Watkins City of Tigard Building Department 13125 SW Hall Blvd. Tigard, Oregon 97223 Re: Green Office Park This letter is to certify that DL Design, Inc. is the engineering firm of record for this project. Gary Darling, Vice President, is the designated project manager. Sincerely, d ;7 arling, DL Design, c. 9045 SW l3arbur Boulevard, Suite 101 0 Portland, Orrgon 97219 • Phone: 503.225.1679 • Fax: 503.525 -9266 Update a/o 10/17/02, p. 1 of 4. CHRONOLOGY - BUP2001 -00061 - 11560 SW 67T" AVE -- GREEN OFFICE BUILDING. 2/14/01 -- Application (and original plans) received, permit created. Fax to architect from RDP requesting stamp on 3 floor plans. 3/2/01 -- Plan Review Letter sent to Office Services (and then to Architect) from RDP with specific questions and requests. [Copy in file.] 3/7/01 -- Dated revision of architect's building plans. Plans do not show or refer to sprinkler system or supply. [Latest plans as of 10/4/02.] 3/15/01 -- Dated revision of engineer's civil /site plans. Plans show vault and sprinkler supply line to building. [Latest plans as of 10/4/02.] 3/27/01 -- Revised plans rec'd from applicant; Plans checked /approved by PE (RDP); Approved plans routed to DSTs. [Tidemark entries.] 3/29/01 -- DST post- review completed. (Deb) 3/29/01 -- HOLD for ENG approval of SDR, deferral of TIF. 1 1 /2 mo. -- No data. 5/15/01 -- RELEASE Hold to Ready to Issue, both PLN & ENG OK issue. 5/25/01 -- Permit issued 2 1 /2 mo. -- No data. 8/17/01 -- Footing /Foundation Inspection - Pass. (RDP) 8/30/01 -- Footing /Foundation Inspection - Pass. (RDP) [Foundation walls.] 10/8/01 -- Footing Drain - Pass, Dampproofing - Pass. (JF) 10/22/01 -- Slab inspection - Pass. (RB) 10/22/01 -- Received letter from architect Bayard Mentrum (dated 10/18/01) to Oregon State Board of Architect Examiners, City of Tigard, and Joe Green declaring that (1) Green Investment has begun construction on the project without notifying Mentrum Architecture; (2) Green Investment is acting as general contractor and has refused to pay Mentrum; (3) Chronology — Green Office Building Update a/o 10/17/02, p. 2 of 4. Mentrum is not authorized to do any construction observation on the project; (4) Mentrum will take no responsibility for architectural documents or construction observation. 10/23/01 -- Phone call to GaryL from architect Bayard Mentrum saying he was no longer architect of record for project. 10/23/01 -- Letter from GaryL to Joe Green saying we would do no more inspections until a new architect or engineer of record was identified and that no work requiring inspection was to be done until that time. 12/11/01 -- Letter from Joe Green, countersigned by Gary Darling, declaring that "engineer of record for this project will be DL Engineering" and that Gary Darling of DL Engineering "will become the engineer of record for the building. Tim Covert will remain the structural engineer of record on the project." 6 mo. -- No data. 6/10/02 -- Phone call from Bayard Mentrum to GaryL saying that he had talked with Gary Darling and that Darling "did not understand he was to be responsible for the entire design of the building." GL confirmed this with Gary Darling and that Darling would talk with Mr. Green and "get back to us." 6/11/02 -- EMail from GaryL to staff saying there will be no more inspections at this project and "There will most likely be a stop work posted due to the absence of an architect or record for the project." 2 1/2 mo. -- No data. 8/29/02 -- Framing inspection - Fail, Roof nailing Insp. - Pass, Shear Wall Insp. -- Part. (Hap.) 9/9/02 -- Shear Wall Inspection - RECD (RB) [Notes: Engineering received as per HAP inspection notice dtd. 8/29/02 items 3 & 4.] [Stamped detail plans from Tim Covert, Engr., Expir. 12/31/03.] 9/12/02 -- Gyp board inspection - Part. (RB) [Exterior gypsum to 5 ft. level exception front entrance.] 9/18/02 - -' Gyp board inspection - PASS. (TLP). [9 ft. level.] Chronology — Green Office Building Update a/o 10/17/02, p. 3 of 4. 9/26/02 -- EMail GaryL to Hap re GL's 10/23 and 6/10 contacts with architect Mentrum and engineer Darling. 9/27/02 -- Gyp board inspection - PASS. (DWJ). [ext. to 2 floor, front only.] 9/27/02 -- At 4:30pm GaryL ordered Stop Work Order posted: "All Trades. Previously approved plans rescinded by Tigard Building Official as of 9/27/02. Submit new plans." Posted at 5:OOpm. 9/30/02 -- Faxed to Mark Hoyt standard plan review letter re re- assessment of code requirements. 9/30/01 -- Meeting at 2:OOpm with Greens, Sr & Jr, atty. Gary Hoyt, DWJ, Hap, AMS. Stop Work Order changed to allow brick veneer on building front, gyp board on front and center rear, and roof. Revised order posted 5:00 pm. 10/1/02 -- Faxed to Mark Hoyt OSSC Code Sections 106.3.4.1 - 106.3.5 and 106.3.2. 10/1/02 -- Phone call 3:OOpm between JH, GL, Hap. Per GL, re- revised Stop Work Order posted, faxed to Mark Hoyt, Joe Green; "Stop all work except that which provides temporary weather protection of exterior walls" until plans stamped by engineer /architect of record are submitted. 10/2/02 -- Phone call from GL to Hap, 12:15pm. Per GL, Green to be allowed to continue all exterior work but only upon receipt of confirmation from Gary Darling of his acceptance of position and responsibility as Engineer of Record. Hap called and advised Green Investment, Gary Hoyt, and Gary Darling of this. Gary Darling agreed to provide above confirmation to Hap by FAX if and when agreed upon. 10/4/02 -- FAX from Gary Darling, DL Design, received at 1:OOpm confirming that DL Design is the engineering firm of record for the project and that Gary Darling is project manager. Stop Work Order modified to note violation as "exiting system does not comply with code requirements" and "work may continue on exterior only per Gary Lampella, Building Official," posted at 3:OOpm. 10/15/02 -- Letter dated 10/11/02 received from attorney Mark Hoyt setting forth his version of the sequence of events similar to this chronology. % .. Chronology — Green Office Building Update a/o 10/17/02, p. 4 of 4. 10/16/02 -- Call from Gary Locke( ?), roofing contractor, asking if he could work inside the building running rain drain connectors. Referred to Gary L for contact 10/17 on his return. 10/17/02 -- Gary L advised AMS that Stop Work Order is lifted on the building and and that he has an understanding with the Greens that no work will be done on or affecting the exit stairwells until plans concerning them are submitted and approved. MEMORANDUM / TO ary Lampella, Hap Watkins, Daryl Jones FROM: Albert Shields RE: Chronology – Green Office Building CC: Jim Hendryx, Gary Smalling, Gary Firestone DATE: Friday, October 04, 2002 Attached is a chronology of contacts and documents concerning the Green Office Building, 11560 SW 67 Ave., BUP2- 1- 00061. ( CHRONOLOGY - BUP2001 -00061 - 11560 SW 67TH AVE GREEN OFFICE BUILDING. 2/14/01 -- Application (and original plans) received, permit created. Fax to architect from RDP requesting stamp on 3` floor plans. 3/2/01 -- Plan Review Letter sent to Office Services (and then to Architect) from RDP with specific questions and requests. [Copy in file.] 3/7/01 -- Dated revision of architect's building plans. Plans do not show or refer to sprinkler system or supply. [Latest plans as of 10/4/02.] 3/15/01 -- Dated revision of engineer's civil /site plans. Plans show vault and sprinkler supply line to building. [Latest plans as of 10/4/02.] 3/27/01 -- Revised plans rec'd from applicant; Plans checked /approved by PE (RDP); Approved plans routed to DSTs. [Tidemark entries.] 3/29/01 -- DST post- review completed. (Deb) 3/29/01 -- HOLD for ENG approval of SDR, deferral of TIF. 1 '/a mo. -- No data. 5/15/01 -- RELEASE Hold to Ready to Issue, both PLN & ENG OK issue. 5/25/01 -- Permit issued 2 ' mo. -- No data. 8/17/01 -- Footing /Foundation Inspection - Pass. (RDP) 8/30/01 -- Footing /Foundation Inspection - Pass. (RDP) [Foundation walls.] 10/8/01 -- Footing Drain - Pass, Dampproofing - Pass. (JF) 10/22/01 -- Slab inspection - Pass. (RB) 10/22/01 -- Received letter from architect Bayard Mentrum (dated 10/18/01) to Oregon State Board of Architect Examiners, City of Tigard, and Joe Green declaring that (1) Green Investment has begun construction on the project without notifying Mentrum Architecture; (2) Green Investment is acting as general contractor and has refused to pay Mentrum; (3) • Chronology — Green Office Building 10/04/02, p. 2 of 3. Mentrum is not authorized to do any construction observation on the project; (4) Mentrum will take no responsibility for architectural documents or construction observation. 10/23/01 -- Phone call to GaryL from architect Bayard Mentrum saying he was no longer architect of record for project. 10/23/01 -- Letter from GaryL to Joe Green saying we would do no more inspections until a new architect or engineer of record was identified and that no work requiring inspection was to be done until that time. 12/11/01 -- Letter from Joe Green, countersigned by Gary Darling, declaring that "engineer of record for this project will be DL Engineering" and that Gary Darling of DL Engineering "will become the engineer of record for the building. Tim Covert will remain the structural engineer of record on the project." 6 mo. -- No data. 6/10/02 -- Phone call from Bayard Mentrum to GaryL saying that he had talked with Gary Darling and that Darling "did not understand he was to be responsible for the entire design of the building." GL confirmed this with Gary Darling and that Darling would talk with Mr. Green and "get back to us." 6/11/02 -- EMail from GaryL to staff saying there will be no more inspections at this project and "There will most likely be a stop work posted due to the absence of an architect or record for the project." 2 1 /2 mo. -- No data. 8/29/02 -- Framing inspection - Fail, Roof nailing Insp. - Pass, Shear Wall Insp. -- Part. (Hap.) 9/9/02 -- Shear Wall Inspection - RECD (RB) [Notes: Engineering received as per HAP inspection notice dtd. 8/29/02 items 3 & 4.1 [Stamped detail plans from Tim Covert, Engr., Expir. 12/31/03.] 9/12/02 -- Gyp board inspection - Part. (RB) [Exterior gypsum to 5 ft. level exception front entrance.] 9/18/02 -- Gyp board inspection - PASS. (TLP). [9 ft. level.] Chronology — Green Office Building 10/04/02, p. 3 of 3. 9/26/02 -- EMail GaryL to Hap re GL's 10/23 and 6/10 contacts with architect Mentrum and engineer Darling. 9/27/02 -- Gyp board inspection - PASS. (DWJ). [ext. to 2 ❑ floor, front only.] 9/27/02 -- At 4:30pm GaryL ordered Stop Work Order posted: "All Trades. Previously approved plans rescinded by Tigard Building Official as of 9/27/02. Submit new plans." Posted at 5:OOpm. 9/30/02 -- Faxed to Mark Hoyt standard plan review letter re re- assessment of code requirements. 9/30/01 -- Meeting at 11:00am with Greens, Sr & Jr, atty. Gary Hoyt, DLJ, Hap, AMS. Stop Work Order changed to allow brick veneer on building front, gyp board on front and center rear, and roof. 10/1/02 -- Faxed to Mark Hoyt OSSC Code Sections 106.3.4.1 - 106.3.5 and 106.3.2. 10/1/02 -- Phone call 3:OOpm between JH, GL, Hap. Per GL, re- revised Stop Work Order posted, faxed to Mark Hoyt, Joe Green; "Stop all work except that which provides temporary weather protection of exterior walls" until plans stamped by engineer/architect of record are submitted. 10/2/02 -- Phone call from GL to Hap, 12:15pm. Per GL, Green to be allowed to continue all exterior work but only upon receipt of confirmation from Gary Darling of his acceptance of position and responsibility as Engineer of Record. Hap called and advised Green Investment, Gary Hoyt, and Gary Darling of this. Gary Darling agreed to provide above confirmation to Hap by FAX if and when agreed upon. 10/4/02 -- No contact or further communication as of 10:OOam. AMS. 2/24/03 ____..#-.......01.0.....a. Case Activity Listing 9:51:29AM T I D E M A R K Case #: BUP2001 -00061 COMPUTER SYSTEMS. INC. ... ,. ..... .,,,.,. .. ... .. . - \... .,.:., ... \.ao-"z> - -.: ': _ :'""\C. -..< a ,.., < ':.: ,..� .� .. ... .. .. ....,, h ..:. � � Z u \ D ` ne,h, >.,e U dated. .., _ ..,._ .,., a. �, � .. � ,,.. � . �:r � ...�,� .Ass ned ,.,, o e, -�� � k, � . ...,._tee_ �. .,. . .: . ro.�p :.:..d -.,, .... "� \- ....r..... ....,, .� .... „. .. ,1.,`.. ,. ,..., ..0 r�,. „wy .. v .� .. .,, , � � ., � ,e � 3..•,.,.. �. .,,� ; ...Notes �s. ,:Acttv - .D tton ,� � � : Date, i ;.���,,. Date 2�,, �, � , � � :• Date 3 � Hold . , , . a,. �,�y , ,, ,. �..,,� ,� ,.,,. Y . . a�� ,,, .., .X� ,. a ., , .w, � . ^ BUPCOI S Plan Review � Ltr. � to , r: �, ., �.,,_�, . _,., . ,�., 3/2/O ,.A,:\..._ p� , � s. >. 1 None SENT 3/2/01 S Ofc. Svcs. RDP BUPCO24 Plans 3/27/01 None DONE RDP 3/27/01 checked /approved by RDP PE BUPCO26 Approved plans 3/27/01 None DONE RDP 3/27/01 routed to DSTs RDP BUPC018 Revised plans rec'd 3/27/01 None DONE RDP 3/27/01 from appl RDP BUPC520 Mechanical Permit None 3/27/01 Required RDP BUPC530 Electrical Permit None 3/27/01 Required RDP BUPC540 Sprinkler Permit None 3/27/01 Required RDP BUPC565 Plumbing Permit None 3/27/01 Required RDP BUPC705 Foot/Found Insp 8/17/01 None PASS RDP 8/17/01 RDP BUPC7I6 Reinf Steel Insp None 3/27/01 RDP BUPC725 Slab Insp 10/22/01 None PASS RB 10/22/01 • RB Page 1 of 4 CaseActivity..rpt 2/24/03 ��� Case Activity Listing 9:51:31 AM TIDEMARK Case #: BUP2001 -00061 COMPUTER SYSTEMS. INC ., K _' >'re s As Done (Ipciat -• iptio 1. , ? , x� B ; B <Notes , rv�tye:�Desc : r�pt�on - � . - � :, D ate 1- � ._ . ,.�� � Date2 ., y Date 3 � �Aold °' D�sp To - � �,�,,.. . ��.� _..._. � . _ -_ . - - _ . . _ _ . - - _ _ y _. y BUPC740 Framing Insp 8/29/02 None FAIL HAP 8/29/02 HAP BUPC742 Roof naiing Insp 8/29/02 None PASS HAP 8/29/02 HAP BUPC750 Insulation Insp 1/24/03 None PART TLP 1/24/03 c TLP BUPC757 Shear Wall Insp 8/29/02 None PART HAP 8/29/02 E HAP BUPC760 Gyp Board Insp 9/12/02 None PART RB 9/12/02 E RB BUPC762 Susp Ceilng Insp None 3/27/01 RDP BUPC763 Reinforced concrete None 3/27/01 final rept RDP BUPC769 High strength bolts None 3/27/01 final rept RDP BUPC776 Structural observ. None 3/27/01 final reprt RDP BUPC799 Final Inspection None 3/27/01 RDP BUPCO29 DST post- review 3/29/01 None DONE DEB 3/29/01 completed DEB Page 2 of 4 CaseActivity..rpt __�� 2/24/03 Case Activity Listing 9:51:31AM TIDEMARK Case #: BUP2001 -00061 COMPUTER SYSTEMS. INC. ............ �::,.. >...._�. ,.. _..... ... ,..a� .. .... _.. .: �x� ._.. �,.,_... +`�. .°�'4> „__.� -• r, -,:. <,�:;...:.� �,..::,. , c= :W ,:..., � _„ � � y.< , .,w _., , >., � >. _ :, �. .. � .,, _ :.. - , �� - .. _ .,. . ,�:.�..,,< � n -Done U da . _�., � � r , �. ..,v _ .,� . � . .,�.�, ,, _� . Ass ed < ;� ,.: �< .. : . ,. : Note . ,,.� ,. ...... � .., �� � ;�Hold ; .; Des _� To � :B.,� ��� �B � s s �.;��� . .. �. � _ �;, � D � - � Date 1�,�. , � ��., Date 2 �. Dater3� �... .__ - ...�,.� <,. . ,, P < =^ a.v._�...._ _ �,���,Y.�, ,�_ti.._ ._Y�� _ y . __., , ..�___ �. _ _ .. __ BUPC070 HOLD for (note in 3/29/01 None DONE DEB 3/29/01 0 activity) DEB BUPC074 Hold release to Ready 5/15/01 None DONE DEB 5/15/01 B DEB BUPC100 (F) Issue permit 5/25/01 None DONE BB 5/25/01 BLD BUPC705 Foot/Found Insp 8/30/01 None PASS RDP 8/30/01 F RDP BUPC707 Footing Drain 10/8/01 None PASS JAF 10/8/01 P RB BUPC798 Misc. lnspection 10/8/01 None PASS JAF 10/8/01 D RB BUPC105 (F) Reprint permit 10/11/01 None DONE DLH 10/11/01 T DLH BUPA005 Application received 2/14/01 None DONE DEB 11/14/01 JMT BUPA010 Permit created 2/14/01 None DONE DEB 11/14/01 JMT BUPC757 Shear Wall Insp 9/9/02 None RECD 9/9/02 E RB BUPC760 Gyp Board Insp 9/18/02 None PASS TLP 9/18/02 9 TLP Page 3 of 4 CaseActivity..rpt Case Activity Listing 2/24/03 9:51:29AM TIDEMARK Case #: BUP2001-00061 COMPUTER SYSTEMS. INC. �. � ,,. ...,, ,.. . >. �, , � , : � {� $,, V .., � �. ..t�.... ��. , �._Date3:, <.. :Hold ,:• Dis � ��. � ..., � Notes ,",._. _..,.._�°��.�.. �- �:�:: ActivJty� Descriptuon ... . : ....... �.. �, ,. � ��, .ate 2_..:�. s��.,« �. .�:,..,��: � � . _.. <__ e� > >._ � _ _ ..._. �._ . �,_ Y =r..,? BUPC760 Gyp Board Insp 9/27/02 None PASS DWJ 9/27/02 e DWJ BUPC760 Gyp Board Insp None 9/27/02 DWJ BUPC760 Gyp Board Insp None 9/27/02 DWJ BUPC792 Misc. inspection 10/16/02 None PASS TLP 10/16/02 p TLP BUPA040 Revisions rec'd /routed 11/14/02 None BB 11/23/02 R to PE GWL BUPA045 Plans 11/23/02 None DONE GWL 11/23/02 N checked/approved by GWL PE BUPC768 Structural welding None 1/2/03 final reprt HAP BUPC740 Framing Insp 1/24/03 None PART TLP 1/24/03 f TLP BUPC792 Misc. Inspection 2/3/03 None PART TLP 2/3/03 e TLP Page 4 of 4 CaseActivity..rpt