Correspondence CITY OF TIGARD 24 -Hour
BUILDING Inspection Line: (503) 639 -4175
INSPECTION DIVISION Business Line: (503) 639 - 4171 MST
BUP
Received Date Requested • 3 '7 AM PM BUP
G�
Location -/ 7 d (ace t4-4.-- Suite MEC 3 7
Contact Person . Ph ( ) PLM
Contractor Ph ( ) SWR
BUILDING • Tenant/Owner tL 11) ELC
Footing a �L .S �] 5 ELC
Foundation Access:
Ftg Drain ELR
Crawl Drain
Slab Inspection Notes: SIT
Post & Beam
Shear Anchors -
Ext Sheath/Shear
Int Sheath/Shear
Framing
Insulation
Drywall Nailing
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling 1
Roof
Other: � •
Final
PASS PART FAIL
PLUMBING
Post & Beam
Under Slab
Rough -In
Water Service
Sanitary Sewer
Rain Drains
Catch Basin / Manhole •
Storm Drain
Shower Pan •
Other:
Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough -In
Gas Lin
Smoke TO ampers
tgl i? PART FAIL
TRICAL
Service
Rough -In
UG /Slab
Low Voltage
Fire Alarm
Final ❑ Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
PASS PART FAIL
SITE Please call for reinspection RE: Unable to inspect — no access
Fire Supply Line
ADA
Approach /Sidewalk Date _ w - Inspector 1 37/„. / Ext
Other:
Final DO NOT REMOVE this inspection record from the Job site.
PASS PART FAIL