Loading...
Correspondence CITY OF TIGARD 24 -Hour BUILDING Inspection Line: (503) 639 -4175 INSPECTION DIVISION Business Line: (503) 639 - 4171 MST BUP Received Date Requested • 3 '7 AM PM BUP G� Location -/ 7 d (ace t4-4.-- Suite MEC 3 7 Contact Person . Ph ( ) PLM Contractor Ph ( ) SWR BUILDING • Tenant/Owner tL 11) ELC Footing a �L .S �] 5 ELC Foundation Access: Ftg Drain ELR Crawl Drain Slab Inspection Notes: SIT Post & Beam Shear Anchors - Ext Sheath/Shear Int Sheath/Shear Framing Insulation Drywall Nailing Firewall Fire Sprinkler Fire Alarm Susp'd Ceiling 1 Roof Other: � • Final PASS PART FAIL PLUMBING Post & Beam Under Slab Rough -In Water Service Sanitary Sewer Rain Drains Catch Basin / Manhole • Storm Drain Shower Pan • Other: Final PASS PART FAIL MECHANICAL Post & Beam Rough -In Gas Lin Smoke TO ampers tgl i? PART FAIL TRICAL Service Rough -In UG /Slab Low Voltage Fire Alarm Final ❑ Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd. PASS PART FAIL SITE Please call for reinspection RE: Unable to inspect — no access Fire Supply Line ADA Approach /Sidewalk Date _ w - Inspector 1 37/„. / Ext Other: Final DO NOT REMOVE this inspection record from the Job site. PASS PART FAIL