Correspondence - CITY OF TIGARD BUILDING INSPECTION DIVISION
MST
24 -Hour Inspection Line: 6394175 Business Line: 6394171
BUP
Date Requested :1 AM PM BLD
Location II _ � / Suite # 3 3 MEC2 2 - a:340-4
Contact Person Ph PLM •
Contractor Ph SWR
B } `: ;:: Tenant/Owner ELC
J1 -
Retaining Wall ELR
Footing Access:
Foundation FPS
Ftg Drain SGN
Crawl Drain Inspection Notes:
Slab SIT
Post & Beam
Ext Sheath/Shear
Int Sheath/Shear
Framing
Insulation
Drywall Nailing
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof
Misc:
Final
PASS PART FAIL
PLUMBI ":
Post & Beam
Under Slab
Top Out
Water Service
Sanitary Sewer
Rain Drains
Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough In
Gas Line
Smoke Dampers
mal
PASS PART FAIL
ELECTRICAL 1
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm
Final
PASS PART FAIL
SITE
Backfill/Grading
Sanitary Sewer
Storm Drain [ ].Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
Fire Supply Line
ADA
Approach/Sidewalk Date h O ? / 74 / Inspector Ext
Other
Final
PASS PART FAIL DO NOT REMOVE this inspection record from the job site.