Correspondence CITY OF TIGARD BUILDING INSPECTION .DIVISION
MST
• 24 -Hour Inspection Line: 639 -4175 Business•Line:.;639.4171
BUP -
Date Requested _ / :1 AM PM • BLD.
•
"` p
Location / S SA/ Suite 4 // • MEC 2 O — Ob
Contact Person Ph PLM
Contractor . Ph SWR
•
a�. Tenant/Owner ELC
Retaining Wall ELR
" Footing . :. Access:
Foundation • FPS
Ftg Drain . SGN
Ciawl Drain Inspection Notes:
Slab SIT
Post & Beam
Ext Sheath/Shear
Int Sheath/Shear
Framing -
Insulation
Drywall Nailing
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof
Misc:
Final
PASS PART FAIL
PLUMBING:
Post & Beam
Under Slab
Top Out
Water Service
Sanitary Sewer
Rain Drains
Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough In
Gas Line
Sm Dampers
rnal
PASS PART FAIL
ELECTRICAL
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm
Final - -
PASS PART FAIL
Backfill/Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
Fire Supply Line
ADA �-T�
Approach/Sidewalk
Oher ra
Date /a 7'6 () Inspector / a ill Ext
Other
Final
PASS PART FAIL DO NOT REMOVE this inspection record from the job site..