Correspondence CITY OF'TIGARD BUILDING INSPECTION DIVISION MsT ..A
24- Hour Line: 639 -4175 - Business-Line: 639-4171 : -
BUP j►1�
•
Date Requested / PM BLD e'
Location /VC 5SS64.J Suite • „2Q00- w 7�
Contact Person / 147:4 2 6a-d_/E-,6€ Ph ry " PLM
Contractor Ph . SWR
BUILDING : Tenant/Owner ELC
Retaining Wall ELR
Footing Access: ' +JG
Foundation /� FPS
Ftg Drain l SGN
Crawl Drain Inspection Notes:
Slab SIT
Post &Beam /' #./ 1 - 5
Ext Sheath /Shear l / J
Int Sheath /Shear -
Framing
Insulation
Drywall Nailing
Firewall � j
Fire Sprinkler c.
Fire Alarm
Susp'd Ceiling
Roof
- Misc:
Final
-- PASS PART _ . FAIL
PLUMBING •
Post & Beam
•
Under Slab
Top Out
Water Service
Sanitary Sewer
Rain Drains .
Final
P _ FAIL
' osT& Beam
Rough In
Gas Line
•• •ke Dampers
L�
(i•A,'II PART FAIL •
ELECTRICAL
Service
Rough In
UG /Slab
Low Voltage •
Fire Alarm
Final •
•
PASS PART FAIL -
SITE
Backfill /Grading
Sanitary Sewer -
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin
Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
ADA
Approach /Sidewalk Date /� 7y0) /` Inspector - ' ! Ext
Other
Final
PASS PART FAIL DO NOT REMOVE this inspection record from the job site.