Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT . COMMUNITY DEVELOPMENT Permit #: MEC2010 -00403 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.639.4171 Date Issued: 08/11/2010 Parcel: 2S102BB00300 Jurisdiction: Tigard Site address: 10080 SW KATHERINE ST Subdivision: Lot: 0 Project: King Project Description: Wood stove installation. Owner: FEES KING, JEFFREY H & SUSAN E Description Date Amount 10080 SW KATHERINE ST TIGARD, OR 97223 Wood /Pellet Stove 08/11/2010 $33.39 12% State Surcharge - Mechanical 08/11/2010 $10.80 PHONE: Minimum Fee Adjustment - Mechanical 08/11/2010 $56.61 Contractor: AMERCIAN HOMEFIRES LTD PO BOX 1717 OREGON CITY, OR 97045 PHONE: 503 - 632 -7674 FAX: Type of Use: SF Class of Work: ALT Type of Const: Occupancy Grp: Stories: Fuel Fuel Types: Gas Pressue: Total $100.80 Required Items and Reports (Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0100. You may obtain a copy of the rules or direct questions to OUNC by calling 503.246.6699 • = e g." 344. Issued By: ✓ , �� Permittee Signature: / /^ ir Call 503.639.4175 by 7:00 a.m. for an inspection that business day. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Application I OIZ c l IC '..1 Sl ()NIA City of Tigard Received l�� t� Date/By: 0 /1 0 /3 Permit No.: V e co(to1 IIII ° 13125 SW Hall Blvd., Tigard, OR 97223 ®g Plan Review ' a Phone: 503.639.4171 Fax: 503.598.196 DateBy: Other Permit: •I "1 c:; A RD Inspection Line: 503.639.4175 2 �1 � Q Date ReadyBy: ® See Page 2 for • Internet: www.tigard Fall ,, 1 Notified Method: ffl Supplemental Information T YPE OF WORT 1 ® ��� �� � V D 1 FEE* COMMERCIAL FEE SCHEDULE —USE CHECKLIST ❑ New construction ›ddition/alteratioO�lnent Mechanical permit fees' are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ❑ Demolition ❑ Other: mechanical materials, equipment, labor, overhead, and profit. CATEGORY OF CONSTRUCTION • Value: $ • RESIDENTIAL EQUIPMENT / SYSTEMS FEES* l- and 2- family dwelling ❑ Commercial/industrial ❑ Accessory building For special information use checklist. ❑ Multi - family ❑ Master builder ❑ Other: Description Qty. 1 Ea. I Total JOB SITE INFORMATION AND LOCATION. • Heating/cooling po _ Air conditioning Job site address: .O SW ���-� Sr, (requires site plan showing placement) 46.75 City /State /ZIP: --T c. RD i D R g 7 Z Z 3 Furnace 100,000 BTU (ducts/vents) 46.75 Furnace 100,000+ BTU (ducts/vents) 54.91 Suite/bldg. /apt. no.: Project name: W S }d./ •e Vhf) Heat pump 61.06 Cross street/directions to job site: Duct work 23.32 � l Hydronic hot water system 23.32 �:/ ow- S u-) j l eo, p t ? £ t f WX . 3 rcL tl c+ t, S •e e r. (_ Residential boiler (radiator or hydronic) 23.32 (0 0 8 (7 S w V.: w TH g 11--f. ST . Unit heaters (fuel -type, not electric), in -wall, in -duct, suspended, etc. 46.75 Flue /vent for any of above 23.32 Subdivision: Lot no.: Other: 23.32 Tax map /parcel no.: Other fuel appliances DESCRIPTION OF WORK ' . Water heater 23.32 Gas fireplace 33.39 in- I vt G.t e'' 'P;G..nc. W e t S ' 'P_ / Flv- boX Flue vent for water heater or gas J fireplace 23.32 '✓1 CX iS Tin al / — / re p144Zr . Log lighter (gas) 23.32 ✓ Wood/pellet stove 33.39 Wood fireplace /insert ( 23.32 )-3 , 31.. Chimney /liner /flue /vent 23.32 PROPERTY OWNER I ❑ TENANT Other: 23.32 Name: Sse Fp J'D� 0 � Environmental exhaust and ventilation / 4,4-A `/ Range hood/other kitchen Address: to D 8 0 S w v- i ti >r S T • equipment 33.39 City /State /ZIP: fi t' a r.d 6g_ q 7Z� 3 Clothes dryer exhaust 33.39 I Single -duct exhaust (bathrooms, Phone: (953 ) 66 c(— ( 6 5 ' Fax: ( ) toilet compartments, utility rooms) _ 23.32 XAPPLICANT • ' ,CONTACT .PERSON Attic /crawlspace fans 23.32 Other: 23.32 Business name: Fuel piping Contact name: $14.15 for first four; $4.03 for each additional Address: Furnace, etc. Gas heat pump City /State /ZIP: Wall/suspended/unit heater Phone: ( ) Fax:: ( ) Water heater Fireplace E -mail: Range CONTRACTOR ' ' , Barbecue Business / Clothes dryer (gas) usiness name: 9C 1 t I 0 rt-- Ai ✓ brM `Chit,. 1- I -9 Other: Address: Z ( 'S 3 3 Pa '3 ( -7 1 "7 MECHANICAL PERMIT FEES* City /State /ZIP: One c a :n c; 6e , C,• s Subtotal Minimum permit fee ($90.00) 9 Phone: (5 [9 3Z — 7�0 Fax: ( ) Plan review (25% of permit fee) CCB lic.: pt 09 y 3.3 ?-1/1' State surcharge (12% of permit fee) L (1,,kr) TOTAL PERMIT FEE l (JO,. Set) This permit application expires if a permit is not obtained within 180 Authorized signature: days after it has been accepted as complete. Print name: �/iv i D As, Date: 8y, r i 1 p ' Fee methodology set by Tri- County Building Industry Service Board I: \ Building \Permits\MEC- PermitApp.doc 10/01/09 440-46I7T(11 /02/COM/WEB) Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial & Multi- Family Fee Schedule: Total Valuation: " Permit Fee: $0.00 to $500.00 Minimum fee $69.06 $500.01 to $5,000.00 $69.06 for the first $500.00 and $3.07 for each additional $100.00 or fraction thereof, to and including $5,000.00. $5,000.01 to $10,000.00 $207.21 for the first $5,000.00 and $2.81 for each additional $100.00 or fraction thereof, to and including $10,000.00. $10,000.01 to $50,000.00 $347.71 for the first $10,000.00 and $2.54 for each additional $100.00 or fraction thereof, to and including $50,000.00. $50,000.01 to $100,000.00 $1,363.71 for the first $50,000.00 and $2.49 for each additional $100.00 or fraction thereof, to and including , $100,000.00. $100,000.01 and up $2,608.71 for the first $100,000.00 and $2.92 for each additional $100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. 1: \Building\Permits\MEC- PermitApp.doc 10/01/09 2