Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report
Main Office alem Office Bend Office . • P.O. Box 23814 4060 Hudson Ave.. NE P.O. Box 7918 Carlson Testing, Inc. Thone (503) Oregon 684-3460 Phone (503) 58 9 125 Bond, (541) 330-9155 97708 06.�� Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155 Fax (503) 684 -0954 Fax (503) 589 -1309 Fax (541) 330 -9163 Daily Report of Proprietary Anchors Client: NORTHWEST HANDLING SYSTEMS INC - RICH KELLY Project: ASSOCIATED BUSINESS SYSTEMS - WAREHOUSE PALLET RACKING CTI Job #: T0807840. Address: 7440 SW BONITA ROAD TIGARD OR Jurisdiction: TIGARD CTI representative B. TATMAN OBOA 834 was on site this date Sep. 05, 2008 to perform Special Inspection for: Permit BUP2008 -00238 DFS #(s) PO Number: 03ER080904C SCOPE OF INSPECTION Location of proprietary anchors inspected [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent or client representative. A) CTI ARRIVED AT SITE TO MONITOR INSTALLATION Name: RICH OF HILTI TZ BOLTS 1/2" WEDGE. Company: NW HANDLING B) SEE NCL ATTACHED. NCL 1: ALL ANCHORS INSTALLED WITHOUT PROPER 2. Inspection was "IBC" © Continuous 0 Periodic SPECIAL INSPECTION PER IBC CHAPTER 17. C) TALKED W /RICH KELLY ABOUT GETTING WITH ENGR. PROPRIETARY ANCHORS TO RECTIFY NCL. Yes No N/A 1. Reviewed previous inspection reports? x 2. Reviewed evaluation report? x Verified following items meet manufacturer's REPORT SUMMARY published installation instructions. 3. Verified minimum embedment depth of the 1. Work inspected was: © Completed n In progress anchors. x 4.Verified installation of the anchors. 2. Completed work inspected was not in compliance with © Approved plans and specifications 0 Shop drawings 5. Verified anchor diameter. x 6. Verified steel grade. RFI 0 Design change ❑ Submittal 0 N/A 7. Verified hole diameter. x Document #(s) Dated: 8. Verified type of drill bit used. 9. Verified hole cleaning method. x 3. Noncompliance item(s) were noted this date, details on 0. Verified adhesive application. x following page(s). © Yes ❑ No 0 N/A 11. Verified edge distance. x 4. Noncompliance item(s) were reinspected this date, details 12. Verified spacing. x on following page(s). 0 Yes 0 No ® N/A 13. Verified installation torque. x 0 Conform Remain in progress Evaluation report number & date: Report(s) findings were discussed and left with NONE of Name of product being installed HILTI TZ WEDGE ANCHORS Batch Number N/A Expiration Date N /A Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. 111 See additional report page(s). ❑ Distribute attachments. Page 1 of 2 Daily Report of Proprietary Ancho For: 09/05/2008 "` ll CTI Job #: T0807840. Project: ASSOCIATED BUSINESS SYSTEMS - WAREHOUSE PALLET RACKING Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. James Hietpas Reviewed By: Steven W Leach Project Manager Review Date: 09/08/2008 BT /SB NORTHWEST HANDLING SYSTEMS INC - RICH KELLY TO: CITY OF TIGARD BUILDING DIVISION SEIZMIC INC ASSOCIATED BUSINESS SYSTEMS - PAT KENNEDY Carlson Testing, Inc. Incompleted Items List (NCL) ?+ Sep 09, 2008 T0807840. Project Name: ASSOCIATED BUSINESS SYSTEMS - WAREHOUSE PALLET RACKING Project Address: 7440 SW BONITA ROAD TIGARD OR Permit No: BUP2008 -00238 P.O. No: 03ER080904C Project Manager: JAMES F. HI ET PAS Item # Insp. Date Item Description Compliance CTI Sign -Off Date Corrected 1 BT 09/05/2008 ALL ANCHORS INSTALLED WITHOUT PROPER SPECIAL INSPECTION PER IBC CHAPTER 17. NORTHWEST HANDLING SYSTEMS INC - RICH KELLY TO:CITY OF TIGARD BUILDING DIVISION SEIZMIC INC ASSOCIATED BUSINESS SYSTEMS - PAT KENNEDY Page: 1 • Main Office .alem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, Oregon 97301 Bend, Oregon 97708 Carlson Testing, Inc. Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155 Fax (503) 684 -0954 Fax (503) 589 -1309 Fax (541) 330 -9163 Daily Report of Proprietary Anchors Client: NORTHWEST HANDLING SYSTEMS INC - RICH KELLY Project: ASSOCIATED BUSINESS SYSTEMS - WAREHOUSE PALLET RACKING CTI Job #: T0807840. Address: 7440 SW BON I TA ROAD TIGARD OR Jurisdiction: TIGARD CTI representative B. TATMAN OBOA 834 was on site this date Sep. 10, 2008 to perform Special Inspection for: Permit BUP2008 -00238 DFS #(s) PO Number: 03ER080904C SCOPE OF INSPECTION Location of proprietary anchors inspected [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent or client representative. NCL UPDATE: Name: RICH KELLY * CTI PERFORMED TORQUE INSPECTION BY PROCEDURE Company: NW HANDLING SYSTEMS RECEIVED FROM ENGINEER DATED 09- 09 -08. 2. Inspection was "IBC" © Continuous El Periodic DURING TORQUE INSPECTION, FOUND NO FAULTS WHILE TORQUE TESTING AND STICK -OUT APPEARED TO BE NORMAL. PROCEDURE ATTACHED CLEARS NCL #1 PROPRIETARY ANCHORS OF REPORT DATED 09-05-08. Yes No N/A 1. Reviewed previous inspection reports? x 2. Reviewed evaluation report? Verified following items meet manufacturer's REPORT SUMMARY published installation instructions. 3. Verified minimum embedment depth of the 1. Work inspected was: © Completed fl In progress anchors. x 4.Verified installation of the anchors. x 2. Completed work inspected was in compliance with 5. Verified anchor diameter. 0 Approved plans and specifications Shop drawings 6. Verified steel grade. ❑ RFI fl Design change ❑ Submittal El N/A 7. Verified hole diameter. 8. Verified type of drill bit used. X Document #(s) ATTACHED PROCEDURE Dated: 09 -09 -08 9. Verified hole cleaning method. X 3. Noncompliance item(s) were noted this date, details on 10. Verified adhesive application. X following page(s). Yes No N/A 11. Verified edge distance. x 4. Noncompliance item(s) were reinspected this date, details 12. Verified spacing. on following page(s). ® Yes No ❑ N/A 13. Verified installation torque. x © Conform l=1 Remain in progress Evaluation report number & date: Report(s) findings were discussed and left with ESR -1917 (09/01/07) RICH KELLY of NW HANDLING Name of product being installed HILTI KWIK BOLT TZ Batch Number N/A Expiration Date Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. ® See additional report page(s). ® Distribute attachments. Page 1 of 2 For: 0 9/ l o/ 2 0 0 8 Daily Report of Proprietary Ancho► CTI Job #: T0807840. Project: ASSOCIATED BUSINESS SYSTEMS - WAREHOUSE PALLET RACKING Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. James Hietpas Reviewed By: Steven W Leach Project Manager Review Date: 09/12/2008 BT /CK CC: NORTHWEST HANDLING SYSTEMS INC - RICH KELLY CITY OF TIGARD BUILDING DIVISION SEIZMIC INC ASSOCIATED BUSINESS SYSTEMS - PAT KENNEDY Carlson Testing, Inc. Incompleted Items List (NCL) Sep 15, 2008 T0807840. Project Name: ASSOCIATED BUSINESS SYSTEMS - WAREHOUSE PALLET RACKING Project Address: 7440 SW BONITA ROAD TIGARD OR Permit No: BUP2008 -00238 P.O. No: 03ER080904C Project Manager: JAMES F. HIETPAS Item # Insp. Date Item Description Compliance CTI Sign -Off Date Corrected 1 BT 09/05/2008 ALL ANCHORS INSTALLED WITHOUT PROPER SPECIAL RESOLVED PER PROCEDURE B. TATMAN 09/10/2008 INSPECTION PER IBC CHAPTER 17. FROM ENGINEER DATED 09 -09 -08 CC:NORTHWEST HANDLING SYSTEMS INC - RICH KELLY CITY OF TIGARD BUILDING DIVISION SEIZMIC INC ASSOCIATED BUSINESS SYSTEMS - PAT KENNEDY Page: 1 503 -La I - 6 , p `ac4 SEIZMIC 60 p ` , Op INC. MATERIAL HANDLING ENGINEERING EST. 1985 TEL : (909) 869 -0989 FAX : (909) 869 -0981 September 9, 2008 City of Tigard Building Deptartrnent Tigard, OR Re: Associated Business Systems 7440 S.W. Bonita Road Tigard. OR 97224 As requested , below are the guidlines for the torque test on the 1/2" Hiiti Kwik Bolt TZ Wedge (ICC ESR -1917) anchorage for the above project: General: Subject to the acceptance of the building official, anchors that were to be installed under the supervision of a Deputy Inspector and were not, or poorly installed anchors. may be tested by a testing lab to qualify for special inspection values. Anchor: - Hilti Kwik Bolt TZ Wedge Anchor (ICC ESR- 1 1/2 "0 x 3 -1/2" min. embedment, installation torque = 40 FT -LBS (there may be a torque release for previously installed anchors of 5 - 10 %) Procedure: Starting at any selected mw. 20% of the anchors installed in that row shall be tested. if the anchors test positive without failure, the procedure can be repeated at the next row, with only 10% of the anchors to be tested. The success of the second row will lead to 5% of the remaining rows. in case an anchor failure occurs in a row, it is to be replaced and the remaining anchors are to be tested at a percenrage that is twice that used at the start of that row. For example: Starting at row #4, if 20% of the anchors are to be tested, and no failure occurs, proceed to row #5 at 10% of the anchors to be tested. If an anchor fails, the remainder of that row is to be tested to 20%. If another failure occurs. 40% of the remaining anchors are to he tested and so on. N •F Sincerely , c,N �'! ' Marci Castro�� Seizmic Inc. fr „ %.14 f {/7 11 y f E ! F is• ' a j l MRATION DATE: 1 ° ` df