Loading...
Report Si /- 2cu ss -6000 f Roger Stalick Cedar Hills Development Company NW Torreyview Lane 7 Portland, OR 97229 15 November 2008 Re: Final Summary Report 7920/8000 SW Pfaffle Street Pacific Crossroads Corporate Center Dear Mr. Stalick, Rapid Soil Solutions (RSS) is writing this letter to document that in accordance with the geotechnical report by RSS and the City of Tigard the following has been performed during the construction for the following project: Permit No. SIT2008 -00004 Owner: Cedar Hills Development Company Project Address: 7920/8000 SW Pfaffle Street Project Description: Building foundation pads and roadways Our project file indicates that Rapid Soil Solutions Special Inspection activities listed below were completed on October 24, 2008 with the paving of the parking lot and entrances. This letter represents a summary of work observation and reported by Rapid Soil Solutions representative. - Foundations sub - grades and final grades prior to placement of concrete in building A, B and C - Parking lot sub - grade, final grade and asphalt compaction To the best of our knowledge, the special inspections reference herein were performed by Rapid Soil Solutions in general accordance with the requirements of the Administrative Rules and the Geotechnical Report prepared by RSS on 7 July 2007. Attached are the field reports for the project. If you have any questions or if we can be of further assistance, please don not hesitate to call Mia Mahedy- Sexton, PE at 503 -816- 3689. \ , \ GINF F p. 19244 9 OREGON • 8 4 H ED`S S !EXPIRES /A- 3/- Ug Rapid Mia Mahedy- Sexton, PE. Soi S 91,C n ,c 3915 SW Plum Street Portland, OR 97219 C: 503 -816 -3689 F: 503-285-1636 mia @rapidsoilsolutions.com