Report (695) eve 2cv 6 2-7
1, /
TNO. � (�"/77e 14:24
1 G1eanWater S €r4 ± ±es ..:.. 0� a •-• • v • •• • • 0
,„ co,•,,,„,,„,ent Is clear
EROSION CONTROL I N S P E C T I O NREPORT
DATE /7 -e? INSPECTOR ',vs.' j SUBDIVISION /04, ‘42 , 0‘ ,0124
OWNER/PERMITEE ®fl
SITE ADDRESS 76 yt Ale
• �, T �
F f
i`8 NAL INs TioN
.,.„ .
,•
•
THIS SITE MEETS THE POST—CONSTRUCTION
EROSION CONTROL REQUIREMENTS SET
FORTH IN CLEAN WATER SERVICES
RESOLUTION AND ORDER
NOTE: IF POST - CONSTRUCTION EROSION CONTROL MEASURES ARE STILL BEING
EMPLOYED ON THIS SITE TO MEET CRITERIA FOR AN APPROVED FINAL INSPECTION,
. THE MEASURE(S) MUST REMAIN IN PLACE UNTIL LANDSCAPING IS COMPLETE
OR PERMANENT GROUND COVER IS ESTABLISHED.
A COPY OF THE FINAL EROSION CONTROL INSPECTION. REPORT MUST BE
FORWARDED TO THE NEW OWNER, AT WHICH TIME NEW OWNER ASSUMES
THE RESPONSIBILITY FOR MAINTENANCE, REPAIR AND REMOVAL.
OTHER
THANK YOU FOR YOUR COOPERATION!
ISPFCTOR PHONE _? �3 �/ �_S� .