Loading...
Report (695) eve 2cv 6 2-7 1, / TNO. � (�"/77e 14:24 1 G1eanWater S €r4 ± ±es ..:.. 0� a •-• • v • •• • • 0 ,„ co,•,,,„,,„,ent Is clear EROSION CONTROL I N S P E C T I O NREPORT DATE /7 -e? INSPECTOR ',vs.' j SUBDIVISION /04, ‘42 , 0‘ ,0124 OWNER/PERMITEE ®fl SITE ADDRESS 76 yt Ale • �, T � F f i`8 NAL INs TioN .,.„ . ,• • THIS SITE MEETS THE POST—CONSTRUCTION EROSION CONTROL REQUIREMENTS SET FORTH IN CLEAN WATER SERVICES RESOLUTION AND ORDER NOTE: IF POST - CONSTRUCTION EROSION CONTROL MEASURES ARE STILL BEING EMPLOYED ON THIS SITE TO MEET CRITERIA FOR AN APPROVED FINAL INSPECTION, . THE MEASURE(S) MUST REMAIN IN PLACE UNTIL LANDSCAPING IS COMPLETE OR PERMANENT GROUND COVER IS ESTABLISHED. A COPY OF THE FINAL EROSION CONTROL INSPECTION. REPORT MUST BE FORWARDED TO THE NEW OWNER, AT WHICH TIME NEW OWNER ASSUMES THE RESPONSIBILITY FOR MAINTENANCE, REPAIR AND REMOVAL. OTHER THANK YOU FOR YOUR COOPERATION! ISPFCTOR PHONE _? �3 �/ �_S� .