Loading...
Correspondence (592) 11/21/2008 nditionr Associated With / 7:25:48AM CCEL/ Case #: SDR2007-00005 `�i :p ✓ Condition Status Updated Code Title Hold Status Changed By Tag Date By 0001 PROVIDE TREE MITIGATION PLAN None Met 5/20/2008 TEP 5/20/2008 EAE 1. Prior to site/building permits, the applicant shall provide a mitigation plan that shows the species, location, and spacing of mitigation trees in relation to buildings, infrastructure, existing trees, street trees, and each other. No planted mitigation trees will be credited against the assurance until mitigation plans are presented in an acceptable format and approved by the City Arborist. 0001 TREE FEE IN LIEU /CASH ASSURANCE None Met 7/18/2008 EAE 7/18/2008 PLN 2. Prior to site/building permits, the applicant shall submit a combination fee -in -lieu of planting and cash assurance for the equivalent value of mitigation required ($125 per caliper inch x 696 viable caliper inches removed = $87,000). The applicant shall submit a cash assurance (letter of credit or cash deposit) for the equivalent value of mitigation shown on the approved Tree Mitigation Plan. Any trees successfully planted on or off -site, in accordance with the approved Tree Mitigation Plan and TDC 18.790.060.D, will be credited against the cash assurance two years after all of the trees are planted. The remaining value of caliper inches not shown on the Tree Mitigation Plan shall be paid as a fee in -lieu of planting at the time of plan approval. After the trees are planted, the project arborist shall submit a letter to the City Arborist to certify that all of the mitigation trees were properly planted per the approved Tree Mitigation Plan in order to set the starting point of the two year tree establishment period. After the two year establishment period, the applicant shall provide a re- inventory of the mitigation trees conducted by a certified arborist in order to document mitigation tree survival, and compliance with the approved Tree Mitigation Plan. 0001 SCREEN ALL SERVICE FACILITIES None NOT MET EAE 1/23/2008 MSB O Prior to a final inspection, the applicant shall submit a plan indicating the location of any service facilities, such as air conditioners and gas meters. Service facilities that would be visible from a public street or parking area shall be screened by a solid wood fence between 5 and 8 feet high. 0001 FINAL WALK THROUGH BY PLANNER None NOT MET EAE 1/23/2008 MSB 28. A member of the planning staff shall walk through the site to ensure that the development is consistent with this ecision. 0001 COMPLETE ALL WORK IN ROW None NOT MET KSM 1/23/2008 MSB O Prior to a final building inspection, the applicant shall complete any work in the public right -of -way (or public easement) and obtain approval from the Engineering Department. 0001 AS BUILTS OF PUBLIC IMPROVEMENTS None NOT MET KSM 1/23/2008 MSB 0 0. Prior to a final building inspection, the applicant shall provide the City with as -built drawings of the public provements as follows: 1) 3 mil mylar, 2) a diskette of the as- builts in "DWG" format, if available; otherwise "DXF" will be acceptable, and 3) the as -built drawings shall be tied to the City's GPS network. The applicant's engineer shall provide the City with an electronic file with points for each structure (manholes, catch basins, water valves, hydrants and other water system features) in the development, and their respective X and Y State Plane Coordinates, referenced to NAD 83 (91). 0001 DEDICATE ROW ALONG PFAFFLE None Met 4/15/2008 KSM 4/15/2008 BRS 31. Additional right -of -way shall be dedicated to the Public along the frontage of SW Pfaffle Street to increase the right -of -way to 31 feet from the centerline. The description shall be tied to the existing right -of -way centerline. The dedication document shall be on City forms. Instructions are available from the Engineering Department. 0001 MAINT AGREE FOR COMMON DRVYWAY None NOT MET KSM 1/23/2008 MSB 37 A joint use and maintenance agreement shall be executed and recorded on City standard forms for all common driveways. The agreement shall be referenced on and become part of all applicable parcel Deeds. The agreement shall be approved by the Engineering Department prior to recording. 0001 UNDERGROUND UTS / PAY FEE None NOT MET KSM 1/23/2008 MSB 33 The applicant shall place the existing overhead utility lines along SW Pfaffle Street underground as a part of this project. If requested in writing by the applicant and approved by the City Engineer they shall pay the fee in -lieu of undergrounding. The fee shall be calculated by the frontage of the site that is parallel to the utility lines and will be $35.00 per lineal foot. If the fee option is chosen, the amount will be $8,820.00 and it shall be paid prior to a final building inspection. 0001 FINAL SIGHT DISTANCE CERT None NOT MET KSM 1/23/2008 MSB Prior to a final building inspection, the applicant's engineer shall provide a final sight distance certification for the shared driveway access. Page 1 of 4 CaseConditions..rpt 11/21/2008 ondition s. A sso;iated With 7:25:48AM �,r�► Case #: SDR2007 -00005 Condition Status Updated Code Title Hold Status Changed By Tag Date By 0001 STORMWATER MAINTENANCE AGREEM None NOT MET KSM 1/23/2008 MSB Prior to a final building inspection, the applicant shall demonstrate that they have entered into a maintenance agreement with Stormwater Management, or another company that demonstrates they can meet the maintenance requirements of the manufacturer, for the proposed onsite storm water treatment facility. 0001 RECORD LOT LINE ADJUSTMENT None Met 4/7/2008 EAE 4/17/2008 EAE 3. Prior to site/building permits, the applicant shall record the lot line adjustment survey map with Washington County. The applicant shall provide the City a copy of the recorded map within 15 days of recording. NOTE: Recorded legal descriptions and deeds submitted. Survey Map will be submitted when applicant receives recording number from County Surveyor's office. 0001 PROTECT EXISTING VEGETATION None Met 4/24/2008 EAE 4/24/2008 TEP 4. Prior to site/building permits, the applicant shall protect the existing vegetation abutting the site. The applicant submit a revised landscape plan showing the accurate location and dimensions of the existing hedges on the landscape plan and provide the methods that will be used to protect the hedge. The City Arborist recommends erecting 6 -foot orange construction fencing outside the perimeter of the hedge in order to create a boundary of no disturbance. 0001 WASTE MGMT STORAGE APPROVAL None Met 3/27/2008 EAE 4/8/2008 EAE 5. Prior to site/building permits, the applicant shall provide written approval of the waste storage area from the franchise hauler, Waste Management (Attn: Teri Carter, (503) 992 - 3007). 0001 MARK THE 3 CARMAN POOL SPACES None Met 3/27/2008 EAE 4/8/2008 EAE 6. Prior to site/building permits, the applicant shall revise the site plan by marking the three carpool /vanpool spaces as such. 0001 TRAFFIC FLOW MARKED ON SITE PLAN None Met 4/3/2007 EAE 4/8/2008 EAE 7. Prior to site/building permits, the applicant shall revise the site plan to show that the direction of traffic flow will be marked. 0001 REVISED LANDSCAPE CALCS None Met 3/27/2008 EAE 4/8/2008 EAE 8. Prior to site/building permits, the applicant shall verify whether the percent of the gross site that is landscaped excludes the parking space overhang area. This area cannot be calculated to meet landscaping or sidewalk requirements. The applicant shall revise plans to reflect any changes. 0001 PROVIDE ADDITIONAL WALKWAY None Met 4/3/2008 EAE 4/8/2008 EAE 9. Prior to site/building permits, the applicant shall revise plans to provide an additional walkway from the site to the public sidewalk. The 20 foot space between Buildings A and B shall include not only landscaping, but also a hard - surface pedestrian path (continuous concrete or pavers). Otherwise, the applicant shall revise the site plan to add a street side entrance to Buildings A and B. 0001 PFI REQUIRED None Met 3/19/2008 KSM 3/19/2008 KSM 10. Prior to issuance of a site permit, a Public Facility Improvement (PFI) permit is required for this project to cover half - street improvements and any other work in the public right -of -way. Six (6) sets of detailed public improvement plans shall be submitted for review to the Engineering Department. NOTE: these plans are in addition to any drawings required by the Building Division and should only include sheets relevant to public improvements. Public Facility Improvement (PFI) permit plans shall conform to City of Tigard Public Improvement Design Standards, which are available at City Hall and the City's web page (www.tigard - or.gov). 0001 EXACT LEGAL NAME ON PFI None Met 3/11/2008 AED 3/11/2008 AED 11. The PFI permit plan submittal shall include the exact legal name, address and telephone number of the individual or corporate entity who will be designated as the "Permittee ", and who will provide the financial assurance for the public improvements. For example, specify if the entity is a corporation, limited partnership, LLC, etc. Also specify the state within which the entity is incorporated and provide the name of the corporate contact person. Failure to provide accurate information to the Engineering Department will delay processing of project documents. 0001 REVISED PRELIM SIGHT DIST CERT None Met 3/25/2008 AED 3/25/2008 AED 12. Prior to issuance of permits, Lancaster Engineering shall provide a revised preliminary sight distance certification letter for the sight distance to the west of the proposed site access. 0001 REMOVE /RELOCATE OBJECT MARKER None Met 3/11/2008 AED 3/11/2008 AED 13. The PFI Permit plans shall include the removal or relocation of object marker signs to obtain the required site distance to the east of the proposed site access. Page 2 of 4 CaseConditions..rpt 11/24/2008 Conditions Associated With 1:16:28PM CCEL Case #: SDR2007 -00005 Condition Status Updated Code Title Hold Status Changed By Tag Date By 0001 PROVIDE TREE MITIGATION PLAN None Met 5/20/2008 TEP 5/20/2008 EAE 1. Prior to site/building permits, the applicant shall provide a mitigation plan that shows the species, location, and spacing of mitigation trees in relation to buildings, infrastructure, existing trees, street trees, and each other. No planted mitigation trees will be credited against the assurance until mitigation plans are presented in an acceptable format and approved by the City Arborist. 0001 TREE FEE IN LIEU /CASH ASSURANCE None Met 7/18/2008 EAE 7/18/2008 PLN 2. Prior to site/building permits, the applicant shall submit a combination fee -in -lieu of planting and cash assurance for the equivalent value of mitigation required ($125 per caliper inch x 696 viable caliper inches removed = $87,000). The applicant shall submit a cash assurance (letter of credit or cash deposit) for the equivalent value of mitigation shown on the approved Tree Mitigation Plan. Any trees successfully planted on or off -site, in accordance with the approved Tree Mitigation Plan and TDC 18.790.060.D, will be credited against the cash assurance two years after all of the trees are planted. The remaining value of caliper inches not shown on the Tree Mitigation Plan shall be paid as a fee in -lieu of planting at the time of plan approval. After the trees are planted, the project arborist shall submit a letter to the City Arborist to certify that all of the mitigation trees were properly planted per the approved Tree Mitigation Plan in order to set the starting point of the two year tree establishment period. After the two year establishment period, the applicant shall provide a re- inventory of the mitigation trees conducted by a certified arborist in order to document mitigation tree survival, and compliance with the approved Tree Mitigation Plan. 0001 SCREEN ALL SERVICE FACILITIES None NOT MET EAE 1/23/2008 MSB 27. Prior to a final inspection, the applicant shall submit a plan indicating the location of any service facilities, such as air conditioners and gas meters. Service facilities that would be visible from a public street or parking area shall be screened by a solid wood fence between 5 and 8 feet high. 0001 FINAL WALK THROUGH BY PLANNER None NOT MET EAE 1/23/2008 MSB 28. A member of the planning staff shall walk through the site to ensure that the development is consistent with this decision. 0001 COMPLETE ALL WORK IN ROW None NOT MET KSM 1/23/2008 MSB 29. Prior to a final building inspection, the applicant shall complete any work in the public right -of -way (or public easement) and obtain approval from the Engineering Department. 0001 AS BUILTS OF PUBLIC IMPROVEMENTS None NOT MET KSM 1/23/2008 MSB 30. Prior to a final building inspection, the applicant shall provide the City with as -built drawings of the public improvements as follows: 1) 3 mil mylar, 2) a diskette of the as- builts in "DWG" format, if available; otherwise "DXF" will be acceptable, and 3) the as -built drawings shall be tied to the City's GPS network. The applicant's engineer shall provide the City with an electronic file with points for each structure (manholes, catch basins, water valves, hydrants and other water system features) in the development, and their respective X and Y State Plane Coordinates, referenced to NAD 83 (91). 0001 DEDICATE ROW ALONG PFAFFLE None Met 4/15/2008 KSM 4/15/2008 BRS 31. Additional right -of -way shall be dedicated to the Public along the frontage of SW Pfaffle Street to increase the right -of -way to 31 feet from the centerline. The description shall be tied to the existing right -of -way centerline. The dedication document shall be on City forms. Instructions are available from the Engineering Department. 0001 MAINT AGREE FOR COMMON DRVYWAY None NOT MET KSM 1/23/2008 MSB 32. A joint use and maintenance agreement shall be executed and recorded on City standard forms for all common driveways. The agreement shall be referenced on and become part of all applicable parcel Deeds. The agreement shall be approved by the Engineering Department prior to recording. 0001 UNDERGROUND UTS / PAY FEE None NOT MET KSM 1/23/2008 MSB 33. The applicant shall place the existing overhead utility lines along SW Pfaffle Street underground as a part of this project. If requested in writing by the applicant and approved by the City Engineer they shall pay the fee in -lieu of undergrounding. The fee shall be calculated by the frontage of the site that is parallel to the utility lines and will be $35.00 per lineal foot. If the fee option is chosen, the amount will be $8,820.00 and it shall be paid prior to a final building inspection. 0001 FINAL SIGHT DISTANCE CERT None NOT MET KSM 1/23/2008 MSB 34. Prior to a final building inspection, the applicant's engineer shall provide a final sight distance certification for the shared driveway access. Page 1 of 4 CaseConditions..rpt 11/24/2008 Conditions Associated With 1:16:28PM CCEL/��- ' Case #: SDR2007 -00005 Condition Status Updated Code Title Hold Status Changed By Tag Date By 0001 STORMWATER MAINTENANCE AGREEM None NOT MET KSM 1/23/2008 MSB 35. Prior to a final building inspection, the applicant shall demonstrate that they have entered into a maintenance agreement with Stormwater Management, or another company that demonstrates they can meet the maintenance requirements of the manufacturer, for the proposed onsite storm water treatment facility. 0001 RECORD LOT LINE ADJUSTMENT None Met 4/7/2008 EAE 4/17/2008 EAE 3. Prior to site/building permits, the applicant shall record the lot line adjustment survey map with Washington County. The applicant shall provide the City a copy of the recorded map within 15 days of recording. NOTE: Recorded legal descriptions and deeds submitted. Survey Map will be submitted when applicant receives recording number from County Surveyor's office. 0001 PROTECT EXISTING VEGETATION None Met 4/24/2008 EAE 4/24/2008 TEP 4. Prior to site/building permits, the applicant shall protect the existing vegetation abutting the site. The applicant submit a revised landscape plan showing the accurate location and dimensions of the existing hedges on the landscape plan and provide the methods that will be used to protect the hedge. The City Arborist recommends erecting 6 -foot orange construction fencing outside the perimeter of the hedge in order to create a boundary of no disturbance. 0001 WASTE MGMT STORAGE APPROVAL None Met 3/27/2008 EAE 4/8/2008 EAE 5. Prior to site/building permits, the applicant shall provide written approval of the waste storage area from the franchise hauler, Waste Management (Attn: Teri Carter, (503) 992 - 3007). 0001 MARK THE 3 CARMAN POOL SPACES None Met 3/27/2008 EAE 4/8/2008 EAE 6. Prior to site/building permits, the applicant shall revise the site plan by marking the three carpool /vanpool spaces as such. 0001 TRAFFIC FLOW MARKED ON SITE PLAN None Met 4/3/2007 EAE 4/8/2008 EAE 7. Prior to site/building permits, the applicant shall revise the site plan to show that the direction of traffic flow will be marked. 0001 REVISED LANDSCAPE CALCS None Met 3/27/2008 EAE 4/8/2008 EAE 8. Prior to site/building permits, the applicant shall verify whether the percent of the gross site that is landscaped excludes the parking space overhang area. This area cannot be calculated to meet landscaping or sidewalk requirements. The applicant shall revise plans to reflect any changes. 0001 PROVIDE ADDITIONAL WALKWAY None Met 4/3/2008 EAE 4/8/2008 EAE 9. Prior to site/building permits, the applicant shall revise plans to provide an additional walkway from the site to the public sidewalk. The 20 foot space between Buildings A and B shall include not only landscaping, but also a hard - surface pedestrian path (continuous concrete or pavers). Otherwise, the applicant shall revise the site plan to add a street side entrance to Buildings A and B. 0001 PFI REQUIRED None Met 3/19/2008 KSM 3/19/2008 KSM 10. Prior to issuance of a site permit, a Public Facility Improvement (PFI) permit is required for this project to cover half - street improvements and any other work in the public right -of -way. Six (6) sets of detailed public improvement plans shall be submitted for review to the Engineering Department. NOTE: these plans are in addition to any drawings required by the Building Division and should only include sheets relevant to public improvements. Public Facility Improvement (PFI) permit plans shall conform to City of Tigard Public Improvement Design Standards, which are available at City Hall and the City's web page (www.tigard - or.gov). 0001 EXACT LEGAL NAME ON PFI None Met 3/11/2008 AED 3/11/2008 AED 11. The PFI permit plan submittal shall include the exact legal name, address and telephone number of the individual or corporate entity who will be designated as the "Permittee ", and who will provide the financial assurance for the public improvements. For example, specify if the entity is a corporation, limited partnership, LLC, etc. Also specify the state within which the entity is incorporated and provide the name of the corporate contact person. Failure to provide accurate information to the Engineering Department will delay processing of project documents. 0001 REVISED PRELIM SIGHT DIST CERT None Met 3/25/2008 AED 3/25/2008 AED 12. Prior to issuance of permits, Lancaster Engineering shall provide a revised preliminary sight distance certification letter for the sight distance to the west of the proposed site access. 0001 REMOVE /RELOCATE OBJECT MARKER None Met 3/11/2008 AED 3/11/2008 AED 13. The PFI Permit plans shall include the removal or relocation of object marker signs to obtain the required site distance to the east of the proposed site access. Page 2 of 4 CaseConditions..rpt 11/24/2008 Conditions Associated With 1:16:28PM CCEL Case #: SDR2007 -00005 Condition Status Updated Code Title Hold Status Changed By Tag Date By 0001 ACCESS /PKING PLAN - PFI PHASE None Met 3/11/2008 AED 3/11/2008 AED 14. The applicant shall provide a construction vehicle access and parking plan for approval by the City Engineer. The purpose of this plan is for parking and traffic control during the public improvement construction phase. 0001 TVF &R APPROVAL None Met 3/25/2008 AED 3/25/2008 AED 15. The applicant shall provide approval from Tualatin Valley Fire and Rescue (TVF &R) for access and hydrant placement prior to issuance of the PFI Permit. 0001 ACCESS/PKG PLAN - BLDG PHASE None Met 4/28/2008 AED 4/28/2008 AED 16. The City Engineer may determine the necessity for, and require submittal and approval of, a construction access and parking plan for the building phase. If the City Engineer deems such a plan necessary, the applicant shall provide the plan prior to issuance of building permits. 0001 PAY ADDRESSING FEE None Met 2/15/2008 KSM 2/19/2008 BRS 17. Prior to issuance of the Site Permit, the applicant shall pay the addressing fee. (STAFF CONTACT: Bethany Stewart, Engineering). 0001 SUBMIT SUITE LAYOUT MAP None Met 3/25/2008 KSM 3/25/2008 BRS 18. Prior to issuance of the site permit, the applicant shall submit a suite layout map to Bethany Stewart, Engineering Department. If the applicant is not sure how many suites will be used, they must estimate a number. The City will then assign suite numbers and the address fee will then be calculated. The fee must be paid by the applicant prior to issuance of the site permit. (STAFF CONTACT: Bethany Stewart, Engineering). 0001 PFAFFLE ST / 1/2 ST IMPROV None Met 3/25/2008 AED 3/25/2008 AED 19. The applicant shall submit construction plans to the Engineering Department as a part of the Public Facility Improvement permit, which indicate that they will construct a half - street improvement along the frontage of SW Pfaffle Street. The improvements adjacent to this site shall include: A. City standard pavement section for a Collector street from curb to centerline equal to 17 feet (however, in this case the pavement will match the existing curb at each end, tapering between the east and west ends of the project frontage); B. pavement tapers needed to tie the new improvement back into the existing edge of pavement shall be built beyond the site frontage; C. concrete curb, or curb and gutter as needed; D. storm drainage, including any off -site storm drainage necessary to convey surface and/or subsurface runoff; E. 6 -8 foot concrete sidewalk (6 foot at the west end and 8 foot at the east end, tapering between the east and west ends of the project frontage) with a planter strip; F. street trees in the planter strip spaced per TDC requirements; G. street striping; H. streetlight layout by applicant's engineer, to be approved by City Engineer; I. underground utilities; J. street signs (if applicable); K. driveway apron (if applicable); and L. adjustments in vertical and/or horizontal alignment to construct SW Pfaffle Street in a safe manner, as approved by the Engineering Department. 0001 PROFILE OF PFAFFLE STREET None Met 3/11/2008 AED 3/11/2008 AED 20. A profile of SW Pfaffle Street shall be required, extending 300 feet either side of the subject site showing the existing grade and proposed future grade. 0001 PAY BIKE STRIPING FEE None Met 7/18/2008 KSM 7/18/2008 PLN 21. Prior to issuance of permits, the applicant shall pay $1,1 54.00 to the City for the striping of the bike lane along the frontage of Pfaffle Street. 0001 CONNECT TO SANITARY SEWER None Met 3/25/2008 AED 3/25/2008 AED 22. The applicant shall provide connection of proposed buildings to the public sanitary sewerage system. A connection permit is required to connect to the existing public sanitary sewer system. 0001 TUALATIN VALLEY WATER DIST APPRO None Met 4/29/2008 AED 4/28/2008 AED 23. The applicant shall obtain approval from the Tualatin Valley Water District for the proposed water connection prior to issuance of the City's Public Facility Improvement permit. Page 3 of 4 CaseConditions..rpt 11/24/2008 Conditions Associated With 1:16:28PM Case #: SDR2007 -00005 Condition Status Updated Code Title Hold Status Changed By Tag Date By 0001 WATER QUALITY FACILITY REQUIRE None Met 3/19/2008 KSM 3/19/2008 KSM 24. The applicant shall provide an on -site water quality facility as required by Clean Water Services Design and Construction Standards (adopted by Resolution and Order No. 00 -7). Final plans and calculations shall be submitted to the Engineering Department (Kim McMillan) for review and approval prior to issuance of the site permit. In addition, a proposed maintenance plan shall be submitted along with the plans and calculations for review and approval. 0001 EROSION CONTROL PLAN REQUIRED None Met 3/11/2008 AED 3/11/2008 AED 25. An erosion control plan shall be provided as part of the Public Facility Improvement (PFI) permit drawings. The plan shall conform to the "Erosion Prevention and Sediment Control Design and Planning Manual, February 2003 edition." 0001 1200 -C GENERAL PERMIT None Met 12/24/2008 KSM 1/24/2008 DMJ 26. The applicant shall obtain a 1200 -C General Permit issued by the City of Tigard pursuant to ORS 468.740 and the Federal Clean Water Act. Page 4 of 4 CaseConditions..rpt 11/21/2008 Ct nditions Associated With 7:25:48AM CCEL Case #: SDR2007 -00005 Condition Status Updated Code Title Hold Status Changed By Tag Date By 0001 ACCESS /PKING PLAN - PFI PHASE None Met 3/11/2008 AED 3/11/2008 AED 14. The applicant shall provide a construction vehicle access and parking plan for approval by the City Engineer. The purpose of this plan is for parking and traffic control during the public improvement construction phase. 0001 TVF &R APPROVAL None Met 3/25/2008 AED 3/25/2008 AED 15. The applicant shall provide approval from Tualatin Valley Fire and Rescue (TVF &R) for access and hydrant placement prior to issuance of the PFI Permit. 0001 ACCESS/PKG PLAN - BLDG PHASE None Met 4/28/2008 AED 4/28/2008 AED 16. The City Engineer may determine the necessity for, and require submittal and approval of, a construction access and parking plan for the building phase. If the City Engineer deems such a plan necessary, the applicant shall provide the plan prior to issuance of building permits. 0001 PAY ADDRESSING FEE None Met 2/15/2008 KSM 2/19/2008 BRS 17. Prior to issuance of the Site Permit, the applicant shall pay the addressing fee. (STAFF CONTACT: Bethany Stewart, Engineering). 0001 SUBMIT SUITE LAYOUT MAP None Met 3/25/2008 KSM 3/25/2008 BRS 18. Prior to issuance of the site permit, the applicant shall submit a suite layout map to Bethany Stewart, Engineering Department. If the applicant is not sure how many suites will be used, they must estimate a number. The City will then assign suite numbers and the address fee will then be calculated. The fee must be paid by the applicant prior to issuance of the site permit. (STAFF CONTACT: Bethany Stewart, Engineering). 0001 PFAFFLE ST / 1/2 ST IMPROV None Met 3/25/2008 AED 3/25/2008 AED 19. The applicant shall submit construction plans to the Engineering Department as a part of the Public Facility Improvement permit, which indicate that they will construct a half - street improvement along the frontage of SW Pfaffle Street. The improvements adjacent to this site shall include: A. City standard pavement section for a Collector street from curb to centerline equal to 17 feet (however, in this case the pavement will match the existing curb at each end, tapering between the east and west ends of the project frontage); B. pavement tapers needed to tie the new improvement back into the existing edge of pavement shall be built beyond the site frontage; C. concrete curb, or curb and gutter as needed; D. storm drainage, including any off -site storm drainage necessary to convey surface and/or subsurface runoff; E. 6 -8 foot concrete sidewalk (6 foot at the west end and 8 foot at the east end, tapering between the east and west ends of the project frontage) with a planter strip; F. street trees in the planter strip spaced per TDC requirements; G. street striping; H. streetlight layout by applicant's engineer, to be approved by City Engineer; I. underground utilities; J. street signs (if applicable); K. driveway apron (if applicable); and L. adjustments in vertical and/or horizontal alignment to construct SW Pfaffle Street in a safe manner, as approved by the Engineering Department. 0001 PROFILE OF PFAFFLE STREET None Met 3/11/2008 AED 3/11/2008 AED 20. A profile of SW Pfaffle Street shall be required, extending 300 feet either side of the subject site showing the existing grade and proposed future grade. 0001 PAY BIKE STRIPING FEE None Met 7/18/2008 KSM 7/18/2008 PLN 21. Prior to issuance of permits, the applicant shall pay $1,154.00 to the City for the striping of the bike lane along the frontage of Pfaffle Street. 0001 CONNECT TO SANITARY SEWER None Met 3/25/2008 AED 3/25/2008 AED 22. The applicant shall provide connection of proposed buildings to the public sanitary sewerage system. A connection permit is required to connect to the existing public sanitary sewer system. 0001 TUALATIN VALLEY WATER DIST APPRO None Met 4/29/2008 AED 4/28/2008 AED 23. The applicant shall obtain approval from the Tualatin Valley Water District for the proposed water connection prior to issuance of the City's Public Facility Improvement permit. Page 3 of 4 CaseConditions..rpt 11/21/2008 C CEL ry J�. Conditions Associated With 7:25:48AM Case #: SDR2007 -00005 Condition Status Updated Code Title Hold Status Changed By Tag Date By 0001 WATER QUALITY FACILITY REQUIRE None Met 3/19/2008 KSM 3/19/2008 KSM 24. The applicant shall provide an on -site water quality facility as required by Clean Water Services Design and Construction Standards (adopted by Resolution and Order No. 00 -7). Final plans and calculations shall be submitted to the Engineering Department (Kim McMillan) for review and approval prior to issuance of the site permit. In addition, a proposed maintenance plan shall be submitted along with the plans and calculations for review and approval. 0001 EROSION CONTROL PLAN REQUIRED None Met 3/11/2008 AED 3/11/2008 AED 25. An erosion control plan shall be provided as part of the Public Facility Improvement (PFI) permit drawings. The plan shall conform to the "Erosion Prevention and Sediment Control Design and Planning Manual, February 2003 edition." 0001 1200 -C GENERAL PERMIT None Met 12/24/2008 KSM 1/24/2008 DMJ 26. The applicant shall obtain a 1200 -C General Permit issued by the City of Tigard pursuant to ORS 468.740 and the Federal Clean Water Act. Page 4 of 4 CaseConditions..rpt