Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Correspondence
City of Tigard, Oregon' • 13125 SW Hall Blvd. a Tigard, UR 97223 ; ` 'F } ''` , V e QQ'' o UV.� y 4 S /v 3 � m January 28, 2009 , t, ; RECEIVED ® �� JAN 2 8 2009 IGA ADO Cedar Hills Development ; ` s F 4 915 NW Torryview Ln. CITY OF TIGARD Portland, OR 97220 PLANNING/ENGINEERING Re: BUP2008- 00057, New 5,050 sq ft office building, shell only. Pacific Crossroads Corporate Center — Building C 8050 SW Pfaffle St. Tigard, OR 97223 To whom it may concern: This letter certifies that all requirements of building permit BUP2008- 00057, issued for construction of a building shell at the location above, have been completed. The final inspection was performed and approved on 11/25/08 by inspectors from the City of Tigard. No tenant spaces are included in this permit, nor shall any tenant improvement be occupied until such time as each space is approved by final inspection of its specific permits, approved for the use intended, and provided with a Certificate of Occupancy. The City neither guarantees nor warrants to the owner, occupant or any other person that this letter evidences strict and complete compliance with each and every ordinance or regulation of the City or the State of Oregon affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and /or occupant of the premises. This letter certifies only that the work covered under the permit number listed above has been completed. It is not permission to occupy tenant spaces. Sincerely, lbe • 'elds ermits /Projects Coordinator cc: Property File, Kim McMillan, Cheryl Caines, Brian Blalock, Roger Stalick. Phone: 503.639.4171 © Fax: 503.684.7297 ® www.tigard- or.gov ® TTY Relay: 503.684.2772 NOV -21 -2008 FRI 12 24 PM CARLSON TESTING INC. . FAX NO. 5038840954 P. 02/02 ,SakrnRRk'e Raid Oka u+rs O�Rw Carlson Testing Inc. SalmOS9730 MOMODRikr&1011 , o uQ� � s m F . u;; i fs Construction Materials Testing & inspection Special Inspection FINAL SUMMARY LETTER November 21, 2008 T0807928.0 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department • Re: Pacific Crossroads Corporate Center — Building C 8050 SW Pfaffle Street — Tigard, OR Permit No,: BUP2008 -00057 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following itern(s) per our inspection reports only: Reinforced Concrete Installation of Cast in Place Anchors Structural Masonry Structural Welding- Shop & Field All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans'and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. ;;?.Z—L==a Steven W. Leach Project Manager SW tiro cc: Pfaffle Office LLC & PCCC LLC — Roger Stalick City of Tigard Building Division Afghan Associates Inc -- Craig Harris Mildren Design Group — Betty Sheppard Commercial Contractors Inc — Eric Money • ENGINEERING MEMORANDUM DATE: 11 - 19 - 08 TO: Betty Sheppeard BY: Steve Young SUBJECT: Building Shell Modification for Building C: T.I. Exterior Doors PROJECT: Pacific Crossroads PROJECT NO.: A07202 Along Grid 1, two exterior doors were added to the storefront systems for the current tenant improvement that required modifications to the Building Shell. The door added to the storefront along Grid 1 between Grids C and D required the concrete stem wall to be blocked out for the door with the sill of the window portion attached to the sill plate above the concrete stem wall. The door added to the south storefront along Grid 1 between Grids B and C required the stem wall to be saw -cut and removed. The window portion of the storefront sits on an approximately 8" tall pony wall above the concrete stem wall. Based on structural site observation (October 27 and correspondence with John Sproull, Site Superintendent for CCI, Inc., the wood stud framing and concrete stem walls surrounding the revised storefronts with the added exterior doors remain adequate for the design loads with the modification noted above. The sill plate above the concrete stem wall needs to be tied to the 2x6 side member with Simpson LTP4 plates at 24° on center, minimum two per length of pony wall. (see the attached sketch). cc: FILE - 4875 SW Griffith Drive !Suite 300 I Beaverton, OR 197005 503.620.30301 tel 503.620.5539[fax w w w. a a i e n g. c o m 1 afghan mites, inc. ENGINEERING ,o. } November 18, 2008 Roger Stalick Cedar Hills Development 915 NW Torrey View Lane Portland, OR 97229 RE: Pacific Crossroads Corporate Center Building C 8050 SW Pfaffle Street, Tigard, Oregon Permit No.: RD 2008 -00057 AAI Project No.: A07207 Dear Mr. Stalick: In accordance with the 2006 International. Building Code with Oregon Amendments -(2007 OSSC), representatives of AAI Engineering performed structural observations regarding the construction of Pacific Crossroads Corporate Center Building C as needed and as outlined in the project construction documents. We have reviewed inspection reports provided by Carlson Testing, Inc. of Tigard, Oregon and structural shop drawings as submitted by the contractor. At this time, all known non - compliant items have been resolved to the best of our knowledge. ,,,J Based on the final summary report provided by Carlson Testing, Inc. and our structural observations, it is our opinion that the construction of the subject project is generally in accordance with the structural plans and specifications. If you have any questions, please do not hesitate to call. Sincerely, 4or Stev= Young, PE SE Project Manager copied: Betty Sheppeard - Mildren Design Group \� John Sproull — Commercial Contractors, Inc. 4875 SW Griffith Drive 1 Suite 3001 Beaverton, OR 197005 503.620.30301 teI 503.620.55391 fax w w w. a a i e n g. c o m • • Carlson 'Testing, Inc. mart oso s.xa mmsoa .,wMr n oxnm somommos &yo ng= m.wpHlawmea nonta msecun momproSSO.9 /o Construction Materials Testing & Inspection '�o ' &r O3)9vamv ors.» xramm � l 1 J Special Inspection FINAL SUMMARY LETTER November 21, 2008 T0807926.0 • • City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Pacific Crossroads Corporate Center — Building C . 8050 SW Pfaftle Street — Tigard, OR • Permit No.: BUP2008-00057 Dear Sir or Madam: This is to certify that.in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Cast in Place Anchors Structural Masonry Structural Welding- Shop & Field All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's • design changes, approvals and verbal instructions. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Steven W. Leach Project Manager SWL/rc cc: Pfaff% Office LLC & PCCC LLC — Roger Stalick City of Tigard Building Division Afghan Associates Inc — Craig Harris Mildren Design Group — Betty Sheppard. Commercial Contractors Inc — Eric Money City of Tigard, Oregon ° 13125 SW Hall Blvd. o Tigard, OR 97223 gg g g a r , November 25, 2008 ij S Y 4 K 1 Pacific Crossroads Center 8050 SW Pfaffle Street Tigard Oregon 97223 Cedar Hills Development 915 NW Torryview Lane Portland Oregon 97229 Re: BUP2008- 00057, New 5050 Square Foot Office Building To whom it may concern: This letter is to certify that all requirements of building permit BUP2008- 00057, issued for a building shell, have been completed. The final inspection was performed and approved on November 25, 2008, by inspectors from the City of Tigard. No tenant spaces are included in this permit, nor shall any tenant improvement be occupied until such time as each space is approved by final inspection of its specific permits, approved for the use intended and provided with a Certificate of Occupancy. The City neither guarantees nor warrants to the owner, occupant or any other person that this letter evidences strict and complete compliance with each and every ordinance or regulation of the City or the State of Oregon affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and /or occupant of the premises. This letter certifies only that the work covered under the permit number listed above has been completes It is not permission to occupy tenant spaces. Sincerely,( Darrel Watkins Inspection Supervisor £•Bldg /complltr Phone: 503.639.4171 o Fax: 503.684.7297 o www.tigard - or.gov o TTY Relay: 503.684.2772 ✓4 2 Rick Bolen o "-4-- From: Firosz, Sara [Sara.Firosz @TicorTitle.com] Sent: Monday, November 24, 2008 2:30 PM To: Rick Bolen; stalickco @earthlink.net Cc: Weischedel, Candice Subject: SW Pfaffle Attachments: Pfaffle- Declaration of Easements v.4.doc; Pfaff le- Declaration of Easements v.5.doc Good afternoon Rick - I received a phone call from Roger Stalick requesting that we forward this to you. Candice is at a signing right now and I am not able to verify with her that this is the correct item. Roger mentioned he sent the email with the document last week so hopefully this is it. Please let me know if this is not what you were anticipating and I will see what else I can find. Thank you. Sara Firosz Escrow Assistant Ticor Title Insurance 1000 SW Broadway, Suite 1555 Portland OR 97205 Direct: 503 - 219 -2124 Tel: 503 - 242 -1210 Fax: 503 - 242 -0770 Email: sara.firosz@ticortitle.com Please note, our offices will be closed Thursday, November 27th and Friday, November 28th for the Thanksgiving Holiday. Have a sccfe and happy holiday! From: Weischedel, Candice Sent: Monday, November 24, 2008 2:24 PM To: Firosz, Sara Subject: FW: Candice Weischedel AVP /Branch Manager NTS /National Commercial Services Ticor Title Insurance Company 1000 SW Broadway, Suite 1555 Portland OR 97205 (503) 242 -1210 - Phone (503) 242 -0770 - Fax candice .weischedel(a)ticortitle.com 1 ti From: Roger D. Stalick [ mailto:stalick.,.4earthlink.net] Sent: Monday, November 17, 2008 5:03 PM To: Weischedel, Candice Cc: 'Peter Stalick'; 'John Van Zonneveld'; 'Greg Bowen'; 'Doug Perry' Subject: Candice: Enclosed is the latest and possibly the final draft (v.5) of the Declaration of Easements for Pacific Crossroads Corporate Center. Greg and Doug are re- reviewing the document once more. There may be a change or two and should be made by Wednesday. I will also peruse the document once more also. If a change, we will modify and send a new document. Once complete, please arrange the signature lines for 8050 SW Pfaffle as you wish. I thought there were 8 entities. Greg's email this morning only shows 7. In addition, please provide an appropriate notary page for all owners to execute. If questions, please call. The foundation survey is to be in your office by Wednesday or Thursday. You should still run a supplemental Title Report showing the recorded Water Treatment agreement along with confirmation of the lot lines on a tax map. Thanks, Roger 2 Rick Bolen From: Cheryl Caines Sent: Monday, November 24, 2008 2:42 PM To: Maris Buxton; Rick Bolen Cc: Al Dickman; stalickco @earthlink.net Subject: RE: Pacific Crossroads Thank you Maris. I do not want to sign off on the conditions since there are two more buildings to go through Building Final Inspection. I will need to do my final walk - through prior to the Building Final Inspections for buildings A & B. Cheryl From: Maris Buxton Sent: Monday, November 24, 2008 2:37 PM To: Rick Bolen Cc: Al Dickman; Cheryl Caines; stalickco @earthlink.net Subject: Pacific Crossroads Importance: High Rick: Al is not available at this moment to get a punch list. Tidemark shows that they have quite a few conditions left to be met prior to final. They also have a fee to pay for the undergrounding, $8,820.00. It looks like Cheryl has given the OK for building final on the shell for Building #C. No others. Engineering has not put anything in the case notes regarding this. Al, do you have a punchlist? Thanks, �Vlaris Bu.Zton City of Tigard Planning Division, Permit Coordinator P: 503- 718 -2453 F: 503 - 718 -2748 maris@tigard-or.gov Rick Bolen From: Firosz, Sara [Sara.Firosz @TicorTitle.com] Sent: Monday, November 24, 2008 2:30 PM To: Rick Bolen; stalickco @earthlink.net Cc: Weischedel, Candice Subject: SW Pfaffle Attachments: Pfaffle- Declaration of Easements v.4.doc; Pfaff le- Declaration of Easements v.5.doc Good afternoon Rick - I received a phone call from Roger Stalick requesting that we forward this to you. Candice is at a signing right now and I am not able to verify with her that this is the correct item. Roger mentioned he sent the email with the document last week so hopefully this is it. Please let me know if this is not what you were anticipating and I will see what else I can find. Thank you. Sara Firosz Escrow Assistant Ticor Title Insurance 1000 SW Broadway, Suite 1555 Portland OR 97205 Direct: 503 - 219 -2124 Tel: 503 - 242 -1210 Fax: 503 -242 -0770 Email: sara.firosz@ticortitle.com Please note, our offices will be closed Thursday, November 27th and Friday, November 28th for the Thanksgiving Holiday. Have a safe and happy holiday! From: Weischedel, Candice Sent: Monday, November 24, 2008 2:24 PM To: Firosz, Sara Subject: FW: Canciice Weischec el AVP /Branch Manager NTS /National Commercial Services Ticor Title Insurance Company 1000 SW Broadway, Suite 1555 Portland OR 97205 (503) 242 -1210 - Phone (503) 242 -0770 - Fax candice .weischedel(cilticortitle.com 1 From: Roger D. Stalick [mailto:stalicK_.. ©earthlink.net] Sent: Monday, November 17, 2008 5:03 PM To: Weischedel, Candice Cc: 'Peter Stalick'; 'John Van Zonneveld'; 'Greg Bowen'; 'Doug Perry' Subject: Candice: Enclosed is the latest and possibly the final draft (v.5) of the Declaration of Easements for Pacific Crossroads Corporate Center. Greg and Doug are re- reviewing the document once more. There may be a change or two and should be made by Wednesday. I will also peruse the document once more also. If a change, we will modify and send a new document. Once complete, please arrange the signature lines for 8050 SW Pfaffle as you wish. I thought there were 8 entities. Greg's email this morning only shows 7. In addition, please provide an appropriate notary page for all owners to execute. If questions, please call. The foundation survey is to be in your office by Wednesday or Thursday. You should still run a supplemental Title Report showing the recorded Water Treatment agreement along with confirmation of the lot lines on a tax map. Thanks, Roger 2 I Rick Bolen From: Maris Buxton Sent: Monday, November 24, 2008 2:37 PM To: Rick Bolen Cc: Al Dickman; Cheryl Caines; stalickco @earthlink.net Subject: Pacific Crossroads Importance: High Rick: Al is not available at this moment to get a punch list. Tidemark shows that they have quite a few conditions left to be met prior to final. They also have a fee to pay for the undergrounding, $8,820.00. It looks like Cheryl has given the OK for building final on the shell for Building #C. No others. Engineering has not put anything in the case notes regarding this. Al, do you have a punchlist? Thanks, Maris Baton City of Tigard Planning Division, Permit Coordinator P: 503 - 718 -2453 F: 503 - 718 -2748 maris@tigard-or.gov 1 afghan usoaates, ioa ENGINEERING November 18, 2008 Roger Stalick Cedar Hills Development 915 NW Torrey View Lane Portland, OR 97229 • RE: Pacific Crossroads Corporate Center Building C 8050. SW Pfaff le Street, Tigard, Oregon Permit No.: BUP2008 -00057 AAI Project No.: A07207 Dear Mr. Stalick: In accordance with the 2006 International Building Code with Oregon Amendments (2007 OSSC), representatives of AAI Engineering performed structural observations regarding the construction of Pacific Crossroads Corporate Center Building C as needed and as outlined in the project construction documents. We have reviewed inspection reports provided by Carlson Testing, Inc. of Tigard, Oregon and structural shop drawings as submitted by the contractor. At this time, all known non - compliant items have been resolved to the best of our knowledge. Based on the final summary report provided by Carlson Testing, Inc. and our structural observations, it is our opinion that the construction of the subject project is generally in accordance with the structural plans and specifications. If you have any questions, please do not hesitate to call. Sincerely, 4 r 1 Stevz Young, PE SE Project Manager copied: Betty Sheppeard - Mildren Design Group John Sproull — Commercial Contractors, Inc. 4875 SW Griffith Drivel Suite 3001 Beaverton, OR 197005 503.620.30301 tel 503.620.55391 fax w w w. a a i e n g. c o m • Offla Carls on Tes Inc. � °„ � 97301 Amy ) ! (3 S 9-1V2 Ham. 41)3349l5S Construction Materials Testing & Inspection Fa: ($03)6/14495( (703)569.1399 r�(s+��ana Special Inspection FINAL SUMMARY LETTER November 21, 2008 T0807926.0 • City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department • Re: Pacific Crossroads Corporate Center — Building C 8050 SW Pfaffe Street — Tigard, OR Permit No.: BUP2008-00057 . Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Cast in Place Anchors structural Masonry Structural Welding- Shop & Field All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Steven W. Leach Project Manager SWUrc • cc: Pfaffie Office LLC & PCCC LLC — Roger Stalick City of Tigard Building Division Afghan Associates Inc — Craig Harris Mlidren Design Group — Betty Sheppard. Commercial Contractors Inc — Eric Money Rick Bolen From: Roger D. Stalick [stalickco ©earthlink.net] Sent: Tuesday, November 25, 2008 6:59 AM To: Rick Bolen Attachments: Pfaffle- Declaration of Easements v.5.doc Rick: Good morning. John and I are going to the City this morning at about 8 am. The game plan as explained to me by AI the engineering staff and Planning waives its completion review on Bldg. C. The reason is that those items that pertain to items outside the shell of Bldg. C are still in effect until the remaining portion of the project under the shell permit are completed. In addition, we provided an assurance for landscaping with Cheryl Caines as suggested by Al. When asked, Cheryl noted her approval was in the "computer ". Further, Al was the person that acquired Kim's approval for deferral of her approvals since 8050 needed to be sold this week in order for the Buyer to preserve its financing. So, separating 8050 out of the "herd" was then appropriate. Why you were not informed appropriately, I'm not sure. See you this morning. Thanks, Roger PS: Enclosed is the Declaration I delivered to the City over 2 weeks ago. The signed copy (out of escrow) shall be delivered to the City after recording. Thanks, Roger 1 Rick Bolen From: Al Dickman Sent: Tuesday, November 25, 2008 7:41 AM To: Cheryl Caines; Maris Buxton; Rick Bolen; Mike White Cc: Kim McMillan Subject: RE: Pacific Crossroads No punch list as the public improvements are not complete. The only item I recall Kim being concerned about regarding Bldg C was the deed of easements (easements and water quality maintenance agreement) that will be signed by the new property owner of Bldg C at the time of sale. Once this document is signed then Roger is to give us a copy and as I recall Kim is OK with this. Verify my recollection with Kim to be sure. Al From: Cheryl Caines Sent: Monday, November 24, 2008 2:42 PM To: Maris Buxton; Rick Bolen Cc: Al Dickman; stalickco @earthlink.net Subject: RE: Pacific Crossroads Thank you Maris. I do not want to sign off on the conditions since there are two more buildings to go through Building Final Inspection. I will need to do my final walk- through prior to the Building Final Inspections for buildings A & B. Cheryl From: Maris Buxton Sent: Monday, November 24, 2008 2:37 PM To: Rick Bolen Cc: Al Dickman; Cheryl Caines; stalickco @earthlink.net Subject: Pacific Crossroads Importance: High Rick: Al is not available at this moment to get a punch list. Tidemark shows that they have quite a few conditions left to be met prior to final. They also have a fee to pay for the undergrounding, $8,820.00. It looks like Cheryl has given the OK for building final on the shell for Building #C. No others. Engineering has not put anything in the case notes regarding this. Al, do you have a punchlist? Thanks, �I�laris Buxton City of Tigard Planning Division, Permit Coordinator P: 503 - 718 -2453 1 F: 503 - 718 -2748 marisPtigard- or.gov 2 Rick Bolen From: Al Dickman Sent: Tuesday, November 25, 2008 7:45 AM To: Maris Buxton; Rick Bolen Cc: Cheryl Caines Subject: RE: Pacific Crossroads 000PS, My error, we are OK with bldg final. See previous email. I thought Kim was going to post the case note. I bad. 111 post shortly. Al From: Maris Buxton Sent: Monday, November 24, 2008 2:37 PM To: Rick Bolen Cc: Al Dickman; Cheryl Caines; stalickco @earthlink.net Subject: Pacific Crossroads Importance: High Rick: Al is not available at this moment to get a punch list. Tidemark shows that they have quite a few conditions left to be met prior to final. They also have a fee to pay for the undergrounding, $8,820.00. It looks like Cheryl has given the OK for building final on the shell for Building #C. No others. Engineering has not put anything in the case notes regarding this. Al, do you have a punchlist? Thanks, Maris BuX,ton City of Tigard Planning Division, Permit Coordinator P: 503 - 718 -2453 F: 503 - 718 -2748 maris@tigard-or.gov 1 Rick Bolen From: Al Dickman Sent: Tuesday, November 25, 2008 8:48 AM To: Rick Bolen; Maris Buxton; Cheryl Caines Subject: PCCC 2 case notes entered; 1) Eng ok for final bldg insp for bldg C 2) No fee in lieu of undergrounding as overhead utilities to be undergrounded.