Loading...
Correspondence City of Tigard, Oregon 0 13125 SW Hall Blvd. o Tigard, OR 97223 July 14,2010 TR ARI$ RE: CLEAN WATER SERVICES HEADWORKS IMPROVEMENTS Project Information Building Permit: BUP2010 -00131 Construction Type: II -B Address: /4 3754.6$60 - SW 85 Ave. Occupancy Type: F -2 Area: 5,552 Sq. Ft. Stories: 1 Name: Clean Water Services Sprinkled: No The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2007 edition; 2007 Oregon Fire Code and NFPA 13. Please provide the following conditions prior to issuance of the permit. 1. Please verify the 2500 psf soil bearing capacity as noted in the design criteria section of sheet 001 -G -010. No geotechnical report supporting this assumption was provided with this plan set. 2. The design criteria section correctly identifies the structure as an occupancy category III and assigns a seismic design importance factor "Ip- of 1.25. The precast panel seismic connection calculations (sheet SB -1) uses an importance factor of 1.0. Please verify the calculations are correct and revise any connections and details as necessary. 3. Please clarify the connection of the concrete beams to the concrete columns on sheet 200 -S -503. 4. Detail reference to 200 -S -401 for the platform framing on sheet 200 -S -301 appears to be incorrect. I believe the correct reference should be 200 -SM -401. Please confirm and revise as necessary. 5. The reference call -out of 5/200 -S -502 on the left side of the electrical room on sheet 200 -S -301 appears to be incorrect. I believe the correct reference should be 2/200 -S- 504. Please confirm and revise as necessary. 6. Detail reference to 6/200 -S -502 on sheet 200 -S -302 appears to be incorrect. I believe the correct reference should be 3/200 -S -504. Please confirm and revise as necessary. 7. Reference to 1/200-S-504 and section A /200 -S -504 on sheet 200 -SM -410 appear to be incorrect. Please confirm and revise as necessary. 8. The elevation and section drawings on sheets 200 -S -201, 200 -S -202, 200 -S -203, and 200 -S -301 reference sheet 200 -S -130. There is no sheet 200 -S -130 in the plan set provided. Please clarify and revise as necessary. Phone: 503.639.4171 o Fax: 503.684.7297 o www.tigard - or.gov o TTY Relay: 503.684.2772 When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, ( 0.A.,k_ Mark VanDomelen Building Official (503)718 -2448 markv @dgard - or.gov Debbie Adamski From: Joel Borchers [ BorchersJ @CleanWaterServices.org] Sent: Monday, July 12, 2010 8:55 AM To: Debbie Adamski Subject: CWS - Durham Headworks Project We intend to award the Durham Headworks Project to: Harbor Pacific Contractors Inc, 19628 144 Ave NE — Ste A Woodinville WA, 98072 425 - 4887131 ! V ' ` Q VO OR CCB No.9_9131 the amount of: $4,864,037.00 Joel Borchers Clean Water Services Durham Construction Coordinator 16060 SW 85th Avenue Tigard, OR 97224 office: (503) 547 -8177 c e l I : (503) 789 -3564 1